0% found this document useful (0 votes)
336 views8 pages

RCDC Pier Calculation

This document contains definitions and design calculations for footing FC1 that supports column C1. It defines 81 terms used in the footing design. The document provides details of the concrete grade, steel grade, soil properties, loading conditions, and proposed footing geometry. Footing FC1 is a circular sloped footing that is 5500mm x 5500mm x 1000mm in size, supporting a 1800mm diameter column with a 50mm offset.

Uploaded by

abhijeet sahu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
336 views8 pages

RCDC Pier Calculation

This document contains definitions and design calculations for footing FC1 that supports column C1. It defines 81 terms used in the footing design. The document provides details of the concrete grade, steel grade, soil properties, loading conditions, and proposed footing geometry. Footing FC1 is a circular sloped footing that is 5500mm x 5500mm x 1000mm in size, supporting a 1800mm diameter column with a 50mm offset.

Uploaded by

abhijeet sahu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Footing Design: Design Calculation Page 1 of 8

FOOTING DESIGN CALCULATIONS


Project Name : ABS
Client Name : PMGSY-III
Engineer Name :
Analysis File :
Analysis Last Modified : 23/03/2021 9:57:44 PM

Definitions:
1. α = Coefficient of Thermal Expansion
2. ε1 = Strain at level considered, Calculated ignoring the
stiffening of the concrete in tension zone
3. εm = Average steel strain at level considered
4. ρact = Percentage steel provided
5. ρcrit = Percentage steel critical as per code
6. A = Plan area of footing base
7. Acr = Distance from the point considered to the surface of the
nearest longitudinal bar
8. AstPrv = Area of tensile reinforcement provided
9. Astrqd = Area of tensile reinforcement required
10. Asv = Area of shear reinforcement required
11. AsvPrv = Area of shear reinforcement provided
12. A1 = Bearing area of footing at slope of 1:2
13. A2 = C/s Area of column
14. B = Width of footing base
15. Beff = Effective width of footing
16. BoffB = Footing offset along B below column in plan
17. BoffT = Footing offset along B above column in plan
18. B1 = Width of sloped footing at top
19. ColOff = Column offset in sloped footing
20. D = Depth of footing
21. Deff = Effective Depth of footing
22. Df = Depth of founding layer
23. Dw = Ground water level
24. Ec = Modulus of elasticity of concrete
25. Es = Modulus of elasticity of steel
26. Foss = Safety factor against sliding
27. Fosu = Safety factor against uplift
28. Fst = Stress in steel
29. L = Length of footing base
30. Leff = Effective length of footing
31. LoffL = Footing offset along L on left side of column
32. LoffR = Footing offset along L on right side of column
33. L1 = Length of sloped footing at top
34. Mx = Bending Moment along column D
35. Mx' = Bending Moment along column D due to odd shaped
column
Footing Design: Design Calculation Page 2 of 8

36. Mex = Eccentricity moment along column D


37. Mxx = Total Bending Moment along column D (Mx + Mx' +
Mex)
38. My = Bending Moment along column B
39. My' = Bending Moment along column B due to odd shaped
column
40. Mey = Eccentricity moment along column B
41. Myy = Total Bending Moment along column B (My + My' +
Mey)
42. Muy = Factored moment along column B
43. Muy' = Factored Moment along column B due to odd shaped
column
44. Mux = Factored moment along column D
45. Mux' = Factored Moment along column D due to odd shaped
column
46. Netdown = Net downward load
47. OB = Maximum permissible offset on bottom side of column
in plan
48. OL = Maximum permissible offset on left side of column in
plan
49. OR = Maximum permissible offset on right side of column in
plan
50. OT = Maximum permissible offset on top side of column in
plan
51. P = Axial load for footing sizing
52. P1 = Soil pressure at corner 1
53. P2 = Soil pressure at corner 2
54. P3 = Soil pressure at corner 3
55. P4 = Soil pressure at corner 4
56. Pdelta = Column Load to be transferred by reinforcement
57. Pt = Calculated percentage tensile reinforcement
58. Pu = Factored axial load
59. q = Surcharge Load
60. sp = Spacing Between bars at outer most layer
61. SPu = Upward Soil Pressure
62. SPuL = Upward Soil Pressure from left
63. SPuR = Upward Soil Pressure from right
64. SPuB = Upward Soil Pressure from bottom
65. SPuT = Upward Soil Pressure from top
66. Tc = Design shear strength of concrete
67. Temp1 = Peak Hydration temperature
68. Temp2 = Seasonal Temperature Variations
69. Tv = Nominal shear stress
70. Vu = Design shear force
71. Vus = Strength of shear reinforcement
72. Vx = Shear along major axis
73. Vy = Shear along minor axis
74. Waterpr = Upward water pressure
Footing Design: Design Calculation Page 3 of 8

75. Waterup = Upward force due to water


76. Wcr = Surface Crack Width
77. WFoot = Add. Wt. due to difference in concrete and soil density
78. WFootc = Weight of footing and column with concrete density
79. WSoil = Weight of soil covering footing area
80. Zx = Section modulus of footing base along L
81. Zy = Section modulus of footing base along B

Code References:
IS 456
Parameter Reference
1. Ptmax : Cl. 26.5.2.1
2. Ptmin : Cl. 26.5.2.1
3. Pt : Cl. 38
4. Tc : Cl. 40.2.1
5. Tcmax : Cl. 40.2.3
6. Asv : Cl. 40.4
7. Min Shear Reinf : Cl. 26.5.1.6
8. Max Stirrup Spacing : Cl. 26.5.1.5
9. Punching Shear design : Cl. 31.6.3
10. Load transfer : Cl. 34.4
11. Ptnominal : Cl. 34.5.2
12. Crack width calculation : Annex-F
13. Cracking : Cl. 35.3.2

BS 8007 (For Early / Initial Thermal Cracking)


1. Surface Zone for suspended : Figure A.1
slab
2. Surface Zone for ground : Figure A.2
slab
3. Factors for the calculation : Table A.1
of minimum reinforcement

Design Code : IS 456 + IS 13920 - 2016


Footing No : FC1
Column No : C1 ( 1800mm X DIA )
Analysis No : 1

Concrete Grade : M30 N/sqmm


Steel Grade : Fe500 N/sqmm
Clear Cover : 40 mm
Df : 4M
Dw : 1M

Density of Soil = 18 kN/cum


Soil Bearing Capacity = 400 kN/sqm
Footing Design: Design Calculation Page 4 of 8

Permissible SBC Increase for EQ = 25 %


Permissible SBC Increase for = 25 %
Wind
Live Load Reduction = 50 %

Design cross section by : Average pressure

Footing Type : Circular Sloped


Footing Size (Lx B x D) : 5500mm X 5500mm X 1000mm, d =550mm,450mm
Column Offset : 50 mm
Effective Self Weight = 562.75 kN

Offset Along L (Loff) = 2113.605 mm


Offset Along B (Boff) = 2113.605 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 6
Combination
Critical Load Combination = [4] : 0.9 (LOAD 1: DL)
Pcomb = 297.99 kN
P = Pcomb + Effective Self Weight x 0.9
P = 804.46 kN
Mx = 0 kNm
My = 0 kNm
P/A = 26.59 kN/sqm
Mx/Zx = 0 kN/sqm
My/Zy = 0 kN/sqm
Maximum Soil Pressure = 26.59 kN/sqm
Allowable Soil Pressure = 1x400 kN/sqm
= 400 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 6
Combination
Critical Load Combination = [4] : 0.9 (LOAD 1: DL)
Pcomb = 297.99 kN
P = Pcomb + Effective Self Weight x 0.9
P = 804.46 kN
Mx = 0 kNm
My = 0 kNm
P/A = 26.59 kN/sqm
Mx/Zx = 0 kN/sqm
My/Zy = 0 kN/sqm
Minimum Soil Pressure = 26.59 kN/sqm
> 0
Footing Design: Design Calculation Page 5 of 8

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 3
Combination
Critical Load Combination = [5] : 1.5 (LOAD 1: DL) +1.5 (LOAD 2: LL)
Pu = 2747.54 kN
Mux = 0 kNm
Muy = 0 kNm
P/A = 90.83 kN/sqm
Mx/Zx = 0 kN/sqm
My/Zy = 0 kN/sqm

Deff = 952 mm
Beff = 1888.69 mm
SPu = 90.83 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 1115.83 kNm
Pt = 0.154 %
Ast Rqd (BM) = 2766 sqmm
Ast Prv (Distributed Across = 20 - Ø16 @ 300
Total Width)
= 4021 sqmm

Top Reinforcement Along L:


(D+dmin) /2 = 750.00 mm
<= 1000 mm, Hence
Ast = Min Pt for Top Reinforcement X [(D+dmin)/2] X B
= 0.06% X 750 X 5500
= 2475 sqmm
Ast Prv (Distributed Across
= 53 - Ø8 @ 110 c/c
Total Width)
= 2564 sqmm
Bottom Reinforcement Along B:
Critical Analysis Load = 3
Combination
Critical Load Combination = [5] : 1.5 (LOAD 1: DL) +1.5 (LOAD 2: LL)
Pu = 2747.54 kN
Mux = 0 kNm
Muy = 0 kNm
P/A = 90.83 kN/sqm
Mx/Zx = 0 kN/sqm
My/Zy = 0 kN/sqm

Deff = 936 mm
Leff = 1888.69 mm
Footing Design: Design Calculation Page 6 of 8

SPu = 90.83 kN/sqm


Mu = SPu X L X Boff X Boff / 2
= 1115.83 kNm
Pt = 0.159 %
Ast Rqd (BM) = 2816 sqmm
Ast Prv (Distributed Across
= 20 - Ø16 @ 300
Total Length)
= 4021 sqmm

Top Reinforcement Along B:


(D+dmin) /2 = 750 mm
<= 1000 mm, Hence
Ast = Min Pt for Top Reinforcement X [(D+dmin)/2] X L
= 0.06% X 750 X 5500
= 2475 sqmm
Ast Prv (Distributed Across
= 53 - Ø8 @ 110 c/c
Total Length)
= 2564 sqmm

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 952 mm
Critical Analysis Load = 3
Combination
Critical Load Combination = [5] : 1.5 (LOAD 1: DL) +1.5 (LOAD 2: LL)
Pu = 2747.54 kN
Mux = 0 kNm
Muy = 0 kNm
P/A = 90.83 kN/sqm
Mx/Zx = 0 kN/sqm
My/Zy = 0 kN/sqm

Deff = 733 mm
Beff = 3176.79 mm
SPu = 90.83 kN/sqm
Vu = SPu X (Loff - d) X B
= 580.28 kN
Tv = Vu / (Beff X Deff)
= 0.25 N/sqmm
Tc = 0.31 N/sqmm
Tv < Tc

One Way Shear Along B:


Critical Section @ d from Column Face
Footing Design: Design Calculation Page 7 of 8

= 936 mm
Critical Analysis Load = 3
Combination
Critical Load Combination = [5] : 1.5 (LOAD 1: DL)
+1.5 (LOAD 2: LL)
Pu = 2747.54 kN
Mux = 0 kNm
Muy = 0 kNm
P/A = 90.83 kN/sqm
Mx/Zx = 0 kN/sqm
My/Zy = 0 kN/sqm

Deff = 721 mm
Leff = 3144.79 mm
SPu = 90.83 kN/sqm
Vu = SPu X (Boff - d) X L
= 588.28 kN
Tv = Vu / (Leff X Deff)
= 0.26 N/sqmm
Tc = 0.32 N/sqmm
Tv < Tc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 472 mm

Critical Analysis Load = 3


Combination
Critical Load Combination = [5] : 1.5 (LOAD 1: DL) +1.5 (LOAD 2: LL)
Pu = 2747.54 kN
Mux = 0 kNm
Muy = 0 kNm
P/A = 90.83 kN/sqm
Mx/Zx = 0 kN/sqm
My/Zy = 0 kN/sqm

Deff = 827 mm
Punching Perimeter = 8620.53 mm
Punching Area = 7127281.793 sqmm
SPu = Average Pressure
= 90.83 kN/sqm
Vu = SPu X ((L X B)-(Leff X Beff))
= 2210.41 kN
Tv = Vu / Punching Area
= 0.31 N/sqmm
Tc = 1.369 N/sqmm
Tv < Tc
Footing Design: Design Calculation Page 8 of 8

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 3
Combination
Critical Load Combination = [5] : 1.5 (LOAD 1: DL)
+1.5 (LOAD 2: LL)
Pu = 2747.54 kN
A2 = 2.54 sqm
A1 = 33.64 sqm
Base Area = 30.25 sqm
A1 > Base Area
Thus, A1 = 30.25
Modification Factor = SquareRoot(A1/A2)  < =
2
SquareRoot(A1/A2) = 3.451
Thus, Modification Factor = 2
Concrete Bearing Capacity = 0.45 X Fck X Modification Factor X Column Area
= 68706.63 kN
Concrete Bearing Capacity > Pu, Hence Safe.