Railway Road Bridge in Novi Sad - Steel tied network arches across the
Danube
To cite this article: A Bojovi et al 2018 IOP Conf. Ser.: Mater. Sci. Eng. 419 012032
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]
Abstract. The Railway road bridge in Novi Sad is situated on the international railroad
Belgrade-Budapest. The bridge is designed for two railway tracks (with design speed of
160 km/h), two road lanes and two footpaths. The bridge structure consists of four
structures: two approach composite bridges at the banks and two steel tied network arch
bridges over the river and transition structure between two arches. The spans are
27.0+177.0+3.0+219.0+48.0 m, totally 474.0 m in length. The rises of arches are 34.0
m and 42.0 m respectively. The width of the bridge is 31.440 m. The arches and ties, as
well as the girders of the approach spans, are steel box girders. The decks of all bridge
structures are the composite reinforced concrete slabs with thickness of 300 mm, locally
400 mm. The launching was very complex, in both analysis and construction. The arch
bridges were fully assembled on the banks and launched by skids over the bank and by
pontoons over the river, to the final position on piers. The bridge was designed fully
according to European standards and additionally – according to requirements of
German codes DIN-Fachbericht 101 to 104 Edition 2009 and Deutsche Bahn Richtlinie
804, Edition 2003. The bridge is, despite of heavy loads and structural complexity, very
rational in steel volumes and construction costs as well. The bridge is also, with the arch
span of L = 219 m, the bridge with the longest span in the world in the category of tied
network arch bridges with two rail tracks. The bridge is open to rail traffic at 7th April
2018.
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution
of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.
Published under licence by IOP Publishing Ltd 1
9th International Symposium on Steel Bridges IOP Publishing
IOP Conf. Series: Materials Science and Engineering 419 (2018) 012032 doi:10.1088/1757-899X/419/1/012032
1234567890‘’“”
1. Introduction
The New Railroad Bridge across the Danube River in Novi Sad is situated on the location of the old
concrete road railway bridge – destroyed in air strikes in 1999, on the major international electrified
railroad line No 2 Belgrade – Budapest, over the Danube, figure 1.
The contractor for the bridge construction is Spanish-Italian consortium AZVI-Taddei-Horta
Coslada. The list of participants is given in section 6.
Terms of Reference, composed by Serbian Railways includes the following basic references:
Bridge location: location of the old bridge (1961-1999);
Traffic across the bridge: 2 tracks + 2 traffic lanes + 2 foot-cycling paths;
Structural system, as urban planning condition: steel arch structures over the river;
Maximum line (train) speed: passenger trains – 160 km/h, freight trains – 120 km/h;
Maximal vertical acceleration: av ≤ 1.3 m/s2;
Road and rail: rail tracks axes distance = 4.20 m, road lanes = 2 x (3.50+0.35) m;
Bridge accessories: water pipes deck drainage system, accessories and equipment for
electrical power, telecommunications, illumination (public, intern and decorative),
navigation signals (for ships and airplanes), traffic signalization of the road and railway,
road safety barriers;
Foundation: supporting of the new bridge onto the existing fundaments as much as possible;
Design codes: key code Richtlinie 804:2003 [2] and related to that code series DIN-
Fachbericht 101 to 104 Edition 2009 [3] to [6], i.e. appropriate codes series EN 1991, EN
1992, EN 1993, EN 1994 and EN 1998 in actual editions. Alpha factor for railway traffic
load is 1.0.
2. Bridge structures
2.1. General
Essential general data about the Railway Road Bridge in Novi Sad from design [1], figure 2:
Track alignment: according to the traffic solution of traffic line management – satisfying
the requirement for the as short as possible connection with the existing traffic line and
securing of navigation clearance under the bridge;
Structural system: Four independent structures as simple beams, left bank approach bridge
25.30 m, main (river) bridges 177.00 and 219.00 m; right bank approach bridge 45.30
span;
Position of the piers: Position of the axis 3 (axis of the middle pier in the Danube), is done
according to the requirement that the pier should be positioned centrically onto the existing
foundation of the old bridge. Positioning of the axes 2 and 4 of the designed bridge is done
bearing in mind the positions of the existing foundations, position of the piers required by
2
9th International Symposium on Steel Bridges IOP Publishing
IOP Conf. Series: Materials Science and Engineering 419 (2018) 012032 doi:10.1088/1757-899X/419/1/012032
1234567890‘’“”
the conditions of proper institution and structural raster of the bridge structure (as n x 3000
mm). The piers distances 1-2-3-4-5 are: 27.00 + 178.50 + 220.50 + 48.00 m;
Main bridge dimensions: total length is 474.00 m; bridge width between the outer edges of
the masks is 31.440 m; spacing of the ties axes is 23.50 m, figure 3.
3
9th International Symposium on Steel Bridges IOP Publishing
IOP Conf. Series: Materials Science and Engineering 419 (2018) 012032 doi:10.1088/1757-899X/419/1/012032
1234567890‘’“”
The choices and decisions in the design process were influenced by: elements of the Terms of
Reference, design codes requirements, the requirements of rational erection and the need to achieve the
optimal quantity of structure material.
Alignment of railway, and hence the location of the bridge structure was adapted according to the
navigation clearance of the Danube River under the bridge. Also technical requirements for the design
of railway and connection to the existing railway tracks on both banks were considered. The ballast
depth is min 350 mm.
The transversal slopes of bridge deck are 2.5% and 1.5% which corresponds to conditions of
drainage, both road and rail respectively, figures 3 and 4.
Structural materials:
Structural steel grades are S355 mainly and in very limited areas of the nodes arch/tie is
S460 applied, with thickness constraints according to the terms of Richtlinie 804:2003 [2]
and DIN-Fachbericht 103:2009 [5]; the maximal plate thickness is 50 mm;
The concrete deck slab is casted in situ, with concrete class C35/45 according to EN 1992-
1-1:2004 and DIN-Fachbericht 102:2009 [4]:
Headed studs are Ø25 x 200 mm according to EN ISO 13918:1998 and EN ISO 14555:1998;
Reinforcement bars are from steel B500C according to EN 10080:2005;
The hangers of arch bridges are parallel strand cables with the ultimate (nominal tensile)
strength fu = 1860 N/mm2.
The structure and hangers are painted in signal white (RAL 9003) which reduces influence of thermal
actions on the bridge structures.
4
9th International Symposium on Steel Bridges IOP Publishing
IOP Conf. Series: Materials Science and Engineering 419 (2018) 012032 doi:10.1088/1757-899X/419/1/012032
1234567890‘’“”
Figure 5. Fragments from 3D-Workshop drawings and interior of arch and tie.
The approaching structures 1-2 and 4-5 consists of three girders (figure 4), connected transversally by
cross beams. The side girders are steel structures, shaped as ties of arch bridges for sake of visual
compliance. Side girders are also horizontally connected with the deck slab by the headed studs. The
middle girder is a composite beam.
The mutual work of three girders in the grillage system is well balanced considering the eccentricities
of traffic loads.
3. Some specific details of the bridge structure and construction of the bridge
5
9th International Symposium on Steel Bridges IOP Publishing
IOP Conf. Series: Materials Science and Engineering 419 (2018) 012032 doi:10.1088/1757-899X/419/1/012032
1234567890‘’“”
structures, transported with the bridge structures during launching and welded connected in situ after
the final space tuning on the pier. The structural solution is presented in figure 7.
Figure 6. Bearings arrangement of the arch bridge 3B-4 and support reactions scope.
c
Horizontal support structure:
a) Superior part – Pin, under the end cross beam,
b) Inferior part – Pot, over the concrete pier,
c) Complete structure as Pin + Pot.
Horizontal forces tranfere from End cross beam,
over the Horizontal support to the steel tube pins
in concrete top beam of the central pier.
6
9th International Symposium on Steel Bridges IOP Publishing
IOP Conf. Series: Materials Science and Engineering 419 (2018) 012032 doi:10.1088/1757-899X/419/1/012032
1234567890‘’“”
The deck structures of arch bridges are also exposed to tension forces from main structural system.
Limitation of crack widths is realised thru the appropriate structural detailing of reinforcement bars,
strictly according to very strong requirement of DIN-Fachbericht 104:2009 [6] for reinforced concrete
deck plates of arch bridges, see figure 8.
Additionally, the deck plate is double protected: superior surface – water insulation methyl
methacrylate resin layer; inferior surface – permanent steel formwork.
3.3. Launching
The launching of arch bridge structures (figure 9) has been realized through the movement on the banks
– with skids and over the water – on pontoons. The bridge structures were reinforced with the temporary
columns for launching, securing the structure to overstressing.
7
9th International Symposium on Steel Bridges IOP Publishing
IOP Conf. Series: Materials Science and Engineering 419 (2018) 012032 doi:10.1088/1757-899X/419/1/012032
1234567890‘’“”
Special attention has been paid to calculation of forces and deformations of entire structure during
cable stay installation as well as to erection analysis in all phases of the erection, figure 9. The hanger
cable stays forces vary from tension to “compression” from step to step, according to changes of
structural system during launching. The analysis was performed using Third Other Theory (analysis
with large cable stays sags), avoiding the long iterative calculations with strait members and effective
modulus of elasticity of cable stays.
5. Conclusion
The Railway Road Bridge in Novi Sad is excellent example of high efficiency of the network arch
systems for railway bridges, especially regarding very strict serviceability limit states requirements. The
specific consumption of structural steel (kg/m2 or kg/m1 of rail track) is below the expected, statistically
defined, mean values according to literature, (e.g. [10]).
8
9th International Symposium on Steel Bridges IOP Publishing
IOP Conf. Series: Materials Science and Engineering 419 (2018) 012032 doi:10.1088/1757-899X/419/1/012032
1234567890‘’“”
The bridge itself (figures 11 and 12), with the arch span of L = 219 m is a bridge with the longest
span in the world in in the category of tied network arch bridges with two rail tracks.
6. Participants
Structure: Railway Road Bridge across the Danube in Novi Sad.
Employers: Delegation of the European to the Republic of Serbia, Enterprise Serbian Railways.
Financing: Delegation of the European to the Republic of Serbia
Autonomy Province of Vojvodina
Municipality of Novi Sad
Contractor: JV AZVI S.A., Taddei S.p.A., Horta Coslada S.L.
Subcontractors for designing:
Bridge structure: DEL ING DOO, Belgrade, Serbia.
Foundation and piers: ENCODE DOO, Belgrade, Serbia.
Subcontractors for construction:
Assembling of the bridge structure: Mostogradnja AD, Belgrade, Serbia.
Cable stays: VSL Ltd., Poland.
Launching: ALE Heavylift Iberica, Madrid, Spain.
Bearings and expansion joints: FIP Industriale, Servazzano, Italy.
Technical control of the Detailed Design: “Kirilo Savić” Institute AD, Belgrade, Serbia.
Engineer: JV DB International and Egis International.
a b
Figure 11. Railway Road Bridge in Novi Sad
a – Footpath with parapets and masks inside; b – The cargo train on the Bridge
9
9th International Symposium on Steel Bridges IOP Publishing
IOP Conf. Series: Materials Science and Engineering 419 (2018) 012032 doi:10.1088/1757-899X/419/1/012032
1234567890‘’“”
References
[1] Detailed design of the bridge structure of the Railway Road Bridge across the Danube in Novi
Sad 2011. (DEL ING DOO, Belgrade as Subcontractor for designing of JV Azvi-Taddei-Horta
Coslada).
[2] DB Richtlinie 804: Eisenbahnbruecken (und sonstige Ingenieurbauwerke). Planen, Bauen und
Instand halten. (Deutsche Bahn AG, München, 2003).
[3] DIN-Fachbericht 101: Einwirkungen auf Bruecken. (Actions on bridges). (Deutsches Institut fuer
Normung, Beuth Verlag GmbH, Berlin, 2009).
[4] DIN-Fachbericht 102: Betonbruecken. (Concrete bridges). (Deutsches Institut fuer Normung,
Beuth Verlag GmbH, Berlin, 2009).
[5] DIN-Fachbericht 103: Stahlbruecken. (Steel bridges). (Deutsches Institut fuer Normung, Beuth
Verlag GmbH, Berlin, 2009).
[6] DIN-Fachbericht 104: Verbundbruecken. (Composite bridges). (Deutsches Institut fuer Normung,
Beuth Verlag GmbH, Berlin, 2009).
[7] Bojović A., Marković Z, Mora A, Blom J, Aleksić D, Pavlović M, Spremić M, Novaković N,
Janjušević B 2013: Railway Road Bridge across the Danube in Novi Sad – Design and
construction. (The Eight International Conference „Bridges in Danube Basin“. Timisoara –
Belgrade, 4-5 October 2013. Procedings, p.139-150. Springer Vieweg, Springer Fachmedien
Wiesbaden 2013).
[8] Bojović A, Mora A., Marković Z, Aleksić D, Pavlović M, Spremić M 2014: Railway Road Bridge
in Novi Sad – Design and Erection. (Engineering for progress, nature and people. Proceedings,
p.2163-2170. 37th IABSE International Symposium Madrid, Spain, 3-5 September 2014)
[9] Bojović A, Mora Munoz A, Marković Z, Novaković N 2018: Network arches over the Danube –
Railway Road Bridge in Novi Sad. (Bauingenieur 93 (2018), Heft 3, p. 110-115).
[10] Herzog M 1975: Stahlgewichte moderner Eisenbahn- und Strassenbrücken. (Der Stahlbau, 44
(1975), Heft 9, p. 280-282).
10