The load rating and number are based on the tentative mechanical inputs/calculations and subject
1 to revision during detailed engg, depending upon the final mechanical and electrical loads
The loads are fed from the 6.6kV HT Switchboard: #OCF located near ESP area of second Unit
2 for AHP HT loads
Each Switchboard shall have 2 bus sections, coupled by a bus-coupler (OPEN under normal
operation). Each bus section is fed by its respective incomer under normal operation. During fault/
3 maintenance of one of the incomer/upstream, the corresponding incomer is OPEN and the bus-
coupler is in CLOSE condition, thus one incomer/stream feeding both the bus sections.
6.6/0.433 kV transformers of AHP area are also fed from the same board. (Ref: LT load list IS-4-
4 DC-691-300-E001)
Page 1 of 3
4X270MW BHADRADRI THERMAL POWER PLANT
6.6kV LOAD LIST for AHP
(MCCB/Starter/
Consumer Type
Duty Category
(Continious or
DOL/RDOL)
Intermittent)
Efficiency of
Utilization/
equipment
Electrical
Worki Stand Voltage Load Net KVA
(%)
Total KW PF KVA A - Running factor
Sl.No.
ng by demand
Description of Loads
(f) =
(c) =
(KW/(1.732*
(a) (b) (a)+(b (d) (p) (i) (e) (g)
6.6*(p)*i))*1
)
00
1 Transport air compressor-1 ( for unit 1&2) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
2 Transport air compressor-2 ( for unit 1&2) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
3 Transport air compressor-3 ( for unit 1&2) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
4 Transport air compressor-4 ( for unit 1&2) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
5 Transport air compressor-5 ( for unit 1&2) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
6 Transport air compressor-6 ( for unit 1&2) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
7 Transport air compressor-7 ( for unit 1&2) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
8 Transport air compressor-1 ( for unit 3&4) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
9 Transport air compressor-2 ( for unit 3&4) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
10 Transport air compressor-3 ( for unit 3&4) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
11 Transport air compressor-4 ( for unit 3&4) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
12 Transport air compressor-5 ( for unit 3&4) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
13 Transport air compressor-6 ( for unit 3&4) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
14 Transport air compressor-7 ( for unit 3&4) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
15 HP Water Pump-1( for all units) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
16 HP Water Pump-2 ( for all units) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
17 HP Water Pump-3 ( for all units) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
18 HP Water Pump-4 ( for all units) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
19 HP Water Pump-5 ( for all units) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
20 HP Water Pump-6 ( for all units) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
21 Ash Slurry Disposal Pump-1 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
22 Ash Slurry Disposal Pump-2 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
23 Ash Slurry Disposal Pump-3 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
24 Ash Slurry Disposal Pump-4 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
25 Ash Slurry Disposal Pump-5 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
26 Ash Slurry Disposal Pump-6 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
27 Ash Slurry Disposal Pump-7 ( for unit 1&2) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
28 Ash Slurry Disposal Pump-8 ( for unit 1&2) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
29 Ash Slurry Disposal Pump-9 ( for unit 1&2) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
30 Ash Slurry Disposal Pump-1 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
31 Ash Slurry Disposal Pump-2 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
32 Ash Slurry Disposal Pump-3 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
33 Ash Slurry Disposal Pump-4 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
34 Ash Slurry Disposal Pump-5 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
35 Ash Slurry Disposal Pump-6 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
36 Ash Slurry Disposal Pump-7 ( for unit 3&4) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
page 2 of 3
4X270MW BHADRADRI THERMAL POWER PLANT
6.6kV LOAD LIST for AHP
(MCCB/Starter/
Consumer Type
Duty Category
(Continious or
DOL/RDOL)
Intermittent)
Efficiency of
Utilization/
equipment
Electrical
Worki Stand Voltage Load Net KVA
(%)
Total KW PF KVA A - Running factor
Sl.No.
ng by demand
Description of Loads
(f) =
(c) =
(KW/(1.732*
(a) (b) (a)+(b (d) (p) (i) (e) (g)
6.6*(p)*i))*1
)
00
37 Ash Slurry Disposal Pump-8 ( for unit 3&4) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
38 Ash Slurry Disposal Pump-9 ( for unit 3&4) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
TRANSFORMER FEEDER-1 FOR MCC-1 FOR 1 0 1 1600.00 139.97 6600 0.85
39 UNIT 1&2 (6.6/0.433 kV) Continous 1360.0