PPM Rebuild Unit Manual: Testing Method
PPM Rebuild Unit Manual: Testing Method
PPM Rebuild Unit Manual: Testing Method
Remarks
1
PPM20-037-00 2/15
INTRODUCTION
・ This document is organized into the following parts
・ This document mainly provides the test method using the KHT75-3 hydraulic test stand or equivalent.
★ When this test is conducted with the KHT75 hydraulic test stand, care should be taken to prevent
cavitation (*) in the main pump on the hydraulic test stand side
* When the main pump supply flow is approximately 160 L/min or more.
・ Applicable bench
1) Converted value test: Use the Komatsu general-purpose hydraulic test stand (KHT75-3) or
its equivalent. The input-output shaft drive motor must be changed to a variable motor.
2) Standard value test: Hydraulic test stand having the same performance as the production
plant hydraulic test stand.
★ Use Komatsu genuine engine oil TO10-CD or equivalent. Discoloration of oil during test is
managed for Class NAS10.
・ Scope
This document is adopted for quality verification testing of the remanufactured main pump,
HMV (120 cc/rev specifications), which is installed on the following machine.
・PC170LC-10/11
2
PPM20-037-00 3/15
1. Test Method
1-1) Since high pressure is produced during this Main pump test, great care should be taken when
selecting the equipment, device, test jigs and components. Also, great attention should be given
to the pump installation condition, the hydraulic circuit configuration, and the universal joint connection.
maximum 95.4
Motor capacity (cc/rev)
minimum 55
Clockwise
PMA port inflow
Direction of rotation of rotation
output shaft Counterclockw
PMB port inflow
ise rotation
Maximum rotation of out put shaft
2600
(rpm)
Maximum hydraulic pressure
37.3
(MPa {kg/cm2})
Maximun supply flow
143
(L/min)
Reference:
0.85 ± 0.2 {8.7 ± 2}
Conter balance valce performance
(Change over pressure)
(MPa {kg/cm2})
Reference:
37.3 {380}
Safety valve performance
(Set pressure)
(MPa {kg/cm2})
Table 1-2 Test item Legend: 〇 Conduct, △ Conduct, if possible, × Don't test
Test items Performance check
Checking
Volumetric
Running-in Morot Regulator Parking brake pressure or
efficiency Amount absence of
Test displacement performance torque
(or amount of of slip test
Method volume check check caoacity check abrnormality
drain)
Standard 〇 〇 〇 〇 〇 〇 〇
3
PPM20-037-00 4/15
Measuring
Measuring flow: 0 - 20 L/min
cylinder or 1
*- (Working pressure; 0.98 MPa {kg/cm2} Measurement of slow of motor drain
Related equipment
2) Test Jigs and Parts: Prepare the jigs listed in Table 1-4.
Table 1-4, List of Test Jigs
No. Part Number Part Name Q'ty Measuring Points and Applications
1 - Plate 1 For instllation of motor
2 - Coupling 1 For connecting output shaft
★ For manufacturing of jigs, refer to "section 4 Names of section and Related Dimensions."
★ Piston pump discharge port PA must be provided the safety valve.
3 ) In addition to those listed in Table 1-4, prepare flange, hose and other parts necessary to continue the
hydraulic circuit for the test.
4 ) Prepare penetrant (developer for color check).
4
PPM20-037-00 5/15
1-7) Preparation Steps for Test Fig. 7-1 Travel Motor Hydraulic Circuit Diagram
Make the following arrangements before the test:
1) Installation of Hydraulic Test Stand
Install the stand so that the drain port (PD) of the
DUT faces upward.(See Figure 7-2, 7-3.)
★ When connecting the universal joint, use
the bolt hole for the output shaft section of the
travel motor and fasten the connection using
a bolt so that the coupling may not be disengaged.
2) Piping Configuration according to Test Hydraulic
Circuit Diagram (See Attached diagram 1 and 2 motor Fig. 7-2 Motor Assembly Mounting Direction
hydraulic circuit.)
(1) See Figure 7-1 for travel motor hydraulic circuit
(2) For the port positions, refer to Attached Table 1 in
"Section 4 Names of Section and Related Diagram".
★ Common to port section of all machine
(3) Attached Diagram 1 to 2 should be selectively
used according to the teat carried out.
・ Attached diagram1: For Running-in and
Performance check
・ Attached diagram 2: For Slip volume check Fig. 7-3 Port Motor Position (PMA, PMB, PD)
★ Test hydraulic circuit of Attached diagram
1 and 2 are for tests conducted while turning
the motor clockwise. In case of counterclockwise
rotation tests, connect PMA and PMB ports in reverse.
3) The rotating directions are as follows when you
look at the output shaft (M2):
・ Flow through the PMA port :
Clockwise rotation (C.W)
・ Flow through the PMB port :
Counterclockwise rotation (C.C.W)
(See Figure 7-3 and 7-4.) Fig. 7-4 Output Shaft (M2) Rotating Direction
• Fig. 7-2 to 7-4
PMA : MA side inlet and outlet port
PMB : MB side inlet and outlet port
PD : Drain port
PB : Parking brake pressure inlet port
P1 : Requlator pilot pressure inlet port
M2 : Output shaft
5
PPM20-037-00 6/15
4) Pour oil from the DUT drain port (PD) to drain air
and to fill the case with oil.
★ Be sure to fill the case with oil to prevent the
motor inside from being damaged.
5) Clean the motor assembly and spray dye penetrant
to each connection and the safety valve connection.
6) Set the oil temperature of the hydraulic test
stand to 50 ± 5°C.
7) Rotate the motor slowly and check the rotating
direction, flowmeter indication and other troubles.
6
PPM20-037-00 7/15
7
PPM20-037-00 8/15
2.Test Hydraulic Circuit Diagram
Appendix Figure 1:Moror Test Basic Circuit Diagram
8
PPM20-037-00 9/15
9
PPM20-037-00 10/15
10
Motor displacement
Test items Running-in
capacity measurement
Category
Condition and Standard Value Items Unit Tolerance
bol 1 2 3 4 5 6 1 2 3 4 speed) speed)
Output shaft revolution speed Standard M2 rpm ±10 500 1500 500 1000 ← 1500 1000 1500 ← ← 1000 ←
Test Condition
Outlet PB
±0.1 1.96
Regulatror changing pilot pressure P1 0 ← ← ← ← ← ← ← ← ← 0
{±1} {20}
2 tiimes or
operating time, number of measuring times - min times - 2 min 1 min ← ← ← ← 2 min ← 1 min ← ←
more
Within
Motor displacement volume qm cc/rev - - - - - - - - - - 93.5 - 98 52.9 - 57.2
range
Standard Value
Slip amount (outlet shaft revolution speed) M2 rpm or less - - - - - - - - - - - -
(PC170-10/11) [1/3]
MPa Within
Regulator changing pilot pressure P1 - - - - - - - - - - - -
{kg/cm2} range
Within
Parking brake torque capacity TB Nm{kgm} - - - - - - - - - - - -
range
Volumetric effeciency η % - - - - - - - - - - - ( ) ( )
Torque efficiency ηt % - - - - - - - - - - - - -
Measurement Value
Torque value Tt Nm{kgm} - - - - - - - - - - - - -
MPa
Regulator changing pressure P1 - - - - - - - - - - - - -
{kg/cm2}
Oil leakage, abnormal noise, and heat generation check - - OK/NG OK/NG OK/NG OK/NG OK/NG OK/NG OK/NG OK/NG OK/NG OK/NG - OK/NG
Determination ( 〇 )
11
PPM20-037-00 11/15
Test items Drain amount, Torque efficiency measurement (*For converted value test, measure the drain volume)
Category
Condition and Standard Value Items Unit Tolerance
bol 1 2 3 4 5 1 2 3 4 5
Output shaft revolution speed Standard M2 rpm ±10 1400 1050 840 430 430 2600 1600 1240 650 650
9.8 19.6 24.5 34.3 37.3 9.8 19.6 24.5 34.3 37.3
Inlet PA
{100} {200} {250} {350} {380} {100} {200} {250} {350} {380}
Main port pressure
Outlet PB (No-load) ← ← ← ← ← ← ← ← ←
±0.5
{±5}
Inlet PA
MPa
Main port puressure (circuit pressure) - - - - - - - - - -
{kg/cm2}
Test Condition
Outlet PB
±0.1 2.94
Regulatror changing pilot pressure P1 0 ← ← ← ← ← ← ← ←
{±1} {30}
2 times
operating time, number of measuring times - min times - ← ← ← ← ← ← ← ← ←
or more
Within
Motor displacement volume qm cc/rev - - - - - - - - - -
range
(96.7) (250) (316) (447) (486) (48.9) (128) (171) (240) (260)
[Refence] Caluculation torque valve Tt Nm{kgm} or more
({9.9}) ({25.5}) ({32.3}) ({45.7}) ({49.6}) ({5}) ({13.1}) ({17.5}) ({24.5}) ({26.6})
Standard Value
Slip amount (outlet shaft revolution speed) M2 rpm or less - - - - - - - - - -
(PC170-10/11) [2/3]
MPa Within
Regulator changing pilot pressure P1 - - - - - - - - - -
{kg/cm2} range
Within
Parking brake torque capacity TB Nm{kgm} - - - - - - - - - -
range
Volumetric effeciency η % -
Torque efficiency ηt % -
Measurement Value
Torque value Tt Nm{kgm} - [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ]
MPa
Regulator changing pressure P1 - - - - - - - - - - -
{kg/cm2}
Oil leakage, abnormal noise, and heat generation check - - - - - - OK/NG - - - - OK/NG
Determination ( 〇 )
12
PPM20-037-00 12/15
Regulator performance check
Test items Slip amount test
(1st speed [Lo] ⇔ 2nd speed [Hi}
Parking brake torque capacity
Sym Run in 1st speed → 2nd speed → Condition measurement
Category
Condition and Standard Value Items Unit Tolerance 1st speed 2nd speed
bol operation 2nd speed 1st speed
500
Output shaft revolution speed Standard M2 rpm ±10 ← (at 2nd speed) - - -
(at 1st speed)
Clockwise (Drive Clockwise
Direction of input shaft rotation - - - Clockwise ← ← ←
from the bench side) (Drive with torque wrench)
9.8 0.098 {1}
Inlet PA ← ← ← Open port
{100} or less
Main port pressure
Outlet PB (No-load) ← ← Close port ← Open port
±0.5
{±5}
Inlet PA - - - - - -
MPa
Main port puressure (circuit pressure)
{kg/cm2} 4.9
Test Condition
Outlet PB - - - ← -
{50}
±0.1 0⇔2.94 2.94
Regulatror changing pilot pressure P1 ← ← 0 Open port
{±1} {0⇔30} {30}
1.96
Parking brake release pressure P2 or more - - - ← Open port
{20}
5 times 2 times 2 times 2 times
operating time, number of measuring times - min times - ← ←
or more or more or more or more
Within
Motor displacement volume qm cc/rev - - - - - -
range
Standard Value
Slip amount (outlet shaft revolution speed) M2 rpm or less - - - 7 12.4 -
(PC170-10/11) [3/3]
Volumetric effeciency η % - - - - - - -
Torque efficiency ηt % - - - - - - -
Measurement Value
Torque value Tt Nm{kgm} - - - - - - -
MPa
Regulator changing pressure P1 - - - - -
{kg/cm2}
Oil leakage, abnormal noise, and heat generation check - - OK/NG - - OK/NG OK/NG -
Determination ( 〇 )
13
PPM20-037-00 13/15
PPM20-037-00 14/15
4. Names of Components and Related Dimensions
Appendix Table 1 Names of Sample Components and Port Size
PMA Motor inlet and outlet port (PMA side) Connected M33 x 1.5
PMB Motor inlet and outlet port (PMB side) Connected M33 x 1.5
P1 Pilot pressure inlet port Connected M14 x 1.5 For regulator change over
Parking brake release pressure
PB Parking brake purssure inlet port Connected (M10 x 1.25)
(with plug)
Installation of pressure gauge
CMA Motor inlet and outlet checking port (PMA side) Connected (M14 x 1.5)
(with plug)
Installation of pressure gauge
CMB Motor inlet and outlet checking port (PMB side) Connected (M14 x 1.5)
(with plug)
14
PPM20-037-00 15/15
Appendix Figure 1 Dimensions of Sample Sections
Applicable Models:PC170-10/11
M2 18xM16x2 xMIN29
X (Circumference
equary spaced)
105
94.5
P
-0.2
-0.3
Φ390
Φ328
Φ390
135
CMA
130 CMB
0
183.4 9 -0.5
(12) PDa
210.4 146 146
222.4 126
PD
PMB
PMA
15