Problem 12-2 Cash Flow (LO2) : 1.00 Points
Problem 12-2 Cash Flow (LO2) : 1.00 Points
Problem 12-2 Cash Flow (LO2) : 1.00 Points
value:
1.00 points
(a) How much would cash flow be if there were only $21,000 in depreciation? All other factors are the
same.(Omit the "$" sign in your response.)
Cash flow $
(b) How much cash flow is lost due to the reduced depreciation between $41,000 and $21,000? (Omit
the "$" sign in your response.)
Cash flow $
check my workeBook Linkreferen
2.
value:
1.00 points
(a) Compute its cash flow. (Omit the "$" sign in your response.)
Cash flow $
(b) Assume it has $650,000 in depreciation. Recompute its cash flow. (Omit the "$" sign in your
response.)
Cash flow $
(c) How large a cash flow benefit did the depreciation provide? (Omit the "$" sign in your response.)
3.
value:
1.00 points
Problem 12-4 Cash flow [LO2]
Assume a firm has earnings before depreciation and taxes of $470,000 and depreciation of $170,000.
(a) If the firm is in a 35 percent tax bracket, compute its cash flow. (Omit the "$" sign in your
response.)
Cash flow $
(b) If it is in a 20 percent tax bracket, compute its cash flow. (Omit the "$" sign in your response.)
Cash flow $
check my workeBook Linkre
4.
value:
1.00 points
(a) Calculate the payback for products X and Y. (Round your answers to 2 decimal places.)
Payback period
Product X years
Product Y years
(b) Which alternative would you select under the payback method?
Product X
Product Y
5.
value:
1.00 points
Problem 12-9 Payback method [LO3]
The Short-Line Railroad is considering a $140,000 investment in either of two companies. The cash
flows are as follows:
(a) Compute the payback period for both companies. (Round your answers to 1 decimal place.)
Payback period
Electric Co. years
Water Works years
Both
Electric Co.
Water Works
6.
value:
2.00 points
(a-1) Calculate the payback period for project A and project B. (Round your answers to 2 decimal
places.)
Payback period
Project A years
Project B years
(a-2) Which of the two projects should be chosen based on the payback method?
Project A
Project B
(b-1) Calculate the net present value for project A and project B. Assume a cost of capital of 8
percent.(Round "PV Factor" to 3 decimal places, intermediate and final answers to the
nearest dollar amount. Omit the "$" sign in your response.)
(b-2) Which of the two projects should be chosen based on the net present value method?
Project B
Project A
(c) Should a firm normally have more confidence in answer derived based on Net present value
method or Payback method?
7.
value:
1.00 points
What is the internal rate of return? (Round "PV Factor" to 3 decimal places. Round your answer to
the nearest whole percent. Omit the "%" sign in your response.)
8.
value:
1.00 points
Problem 12-13 Internal rate of return [LO4]
Home Security Systems is analyzing the purchase of manufacturing equipment that will cost $52,000.
The annual cash inflows for the next three years will be:
(a) Determine the internal rate of return using interpolation. Use Appendix D. (Round "PV Factor" and
intermediate to 3 decimal places. Round final answer to 2 decimal places. Omit the "%" sign in
your response.)
Internal rate of return %
Ye
s
No
9.
value:
1.00 points
(a) What is the net present value of the project? (Round "PV Factor" to 3 decimal places. Round
intermediate and final answer to the nearest dollar amount. Negative amount should be
indicated by a minus sign. Omit the "$" sign in your response.)
Yes
No
10.
value:
2.00 points
Problem 12-18 Net present value and internal rate of return methods [LO4]
The Pan American Bottling Co. is considering the purchase of a new machine that would increase the
speed of bottling and save money. The net cost of this machine is $55,000. The annual cash flows have
the following projections: Use Appendix B and Appendix D.
(a) If the cost of capital is 9 percent, what is the net present value of selecting a new machine? (Round
"PV Factor" to 3 decimal places. Round all dollar values to the nearest dollar amount. Omit the
"$" sign in your response.)
(b) What is the internal rate of return? (Round "PV Factor" to 3 decimal places. Round all dollar
values to the nearest dollar amount. Round your answer to 2 decimal places. Omit the "%"
sign in your response.)
Yes
No
Ye
s
No
Ye
s
No
9.
value:
1.00 points
Problem 12-14 Net present value method [LO4]
Altman Hydraulic Corporation will invest $156,000 in a project that will produce the cash flow shown
below. The cost of capital is 11 percent. (Note that the third year's cash flow is negative.)
Use Appendix B.
(a) What is the net present value of the project? (Round "PV Factor" to 3 decimal places. Round
intermediate and final answer to the nearest dollar amount. Negative amount should be
indicated by a minus sign. Omit the "$" sign in your response.)
Yes
No
10.
value:
2.00 points
Problem 12-18 Net present value and internal rate of return methods [LO4]
The Pan American Bottling Co. is considering the purchase of a new machine that would increase the
speed of bottling and save money. The net cost of this machine is $55,000. The annual cash flows have
the following projections: Use Appendix B and Appendix D.
(a) If the cost of capital is 9 percent, what is the net present value of selecting a new machine? (Round
"PV Factor" to 3 decimal places. Round all dollar values to the nearest dollar amount. Omit the
"$" sign in your response.)
(b) What is the internal rate of return? (Round "PV Factor" to 3 decimal places. Round all dollar
values to the nearest dollar amount. Round your answer to 2 decimal places. Omit the "%"
sign in your response.)
Internal rate of return %
Yes
No
11.
value:
1.00 points
(a) Calculate the profitability index for project X. (Round "PV Factor" to 3 decimal places. Round your
"present value inflows" to the nearest whole dollar amount. Round your final answer to 2
decimal places.)
Profitability index
(b) Calculate the profitability index for project Y. (Round "PV Factor" to 3 decimal places. Round your
"present value inflows" to the nearest whole dollar amount. Round your final answer to 2
decimal places.)
Profitability index
(c) Using the net present value method, combined with the profitability index approach, which project
would you select?
Project X
Project Y
12.
value:
1.00 points
Year Inflow
1 $ 19,000
2 21,000
3 25,000
4 29,000
5 33,000
(a) If the reinvestment assumption of the net present value method is used, what will be the total value of
the inflows after five years? (Assume the inflows come at the end of each year.) (Round "FV Factor"
to 3 decimal places, intermediate and final answers to the nearest whole dollar amount.Omit
the "$" sign in your response.)
(b) If the firm is able to earn 13 percent on reinvested funds, what will be the total value of the inflows
after five years? (Round "FV Factor" to 3 decimal places, intermediate and final answers to the
nearest whole dollar amount.Omit the "$" sign in your response.)
13.
award:
0 out of
1.00 point
Internal rate
Project Project size of return
A $ 11,400 20%
B 31,400 22
C 26,400 12
D 11,400 14
E 11,400 16
F 21,400 19
G 16,400 17
(a) Pick out the projects that the firm should accept. (You may select more than one answer. Click the
box with a check mark for the correct answer and click to empty the box for the wrong
answer.)
Project E
Project D
Project F
Project A
Project B
Project C
Project G
(b) If Projects A and B are mutually exclusive, which projects would you accept in spending
$80,600? (You may select more than one answer. Click the box with a check mark for the
correct answer and click to empty the box for the wrong answer.)
Project E
Project A
Project F
Project C
Project B
Project D
Project G
14.
award:
1.60 out of
2.00 points
Project E Project H
($35,000 investment) ($37,000 investment)
Year Cash flow Year Cash flow
1 $ 8,000 1 $ 19,000
2 13,000 2 16,000
3 19,000 3 15,000
4 21,000
(a) Determine the net present value of the projects based on a zero discount rate. (Omit the "$" sign in
your response.)
(b) Determine the net present value of the projects based on a 13 percent discount rate. (Round "PV
Factors" to 3 decimal places and final answer to the nearest dollar amount. Omit the "$" sign
in your response.)
(d) If the two projects are not mutually exclusive, what would your acceptance or rejection decision be if
the cost of capital (discount rate) is 8 percent? (Use the net present value profile for your decision; no
actual numbers are necessary.)
15.
value:
4.00 points
Fill in the schedule below for the next four years. (Round "Percentage depreciation" to 3 decimal
places. Round all dollar values to the nearest whole number. Input all amounts as positive values.
Omit the "$" sign in your response.)
Depreciation
Taxes
+ Depreciation
Cash flow
16.
value:
2.00 points
Year 1 $ 206,000
Year 2 254,000
Year 3 86,000
Year 4 78,000
The firm is in a 40 percent tax bracket and has an 12 percent cost of capital. Use Appendix B
(a) Calculate the net present value. (Round "PV Factor" to 3 decimal places, intermediate
calculations and final answer to the nearest whole dollar amount. Omit the "$" sign in your
response.)
(b
Under the net present value method, should Summit Petroleum Corporation purchase the asset?
)
Ye
s
No
17.
value:
1.00 points
You did not receive credit for this question in a previous attempt
Problem 12-30 Working capital requirements in capital budgeting [LO4]
The Bagwell Company has a proposed contract with the First Military Base Facility of Texas. The initial
investment in land and equipment will be $185,000. Of this amount, $160,000 is subject to five-year
MACRS depreciation. The balance is in nondepreciable property (land). The contract covers a 6 year
period. At the end of 6 years the nondepreciable assets will be sold for $39,000. The depreciated assets
will have zero resale value. Use Table 12-9 and Appendix B.
The contract will require an additional investment of $49,000 in working capital at the beginning of the
first year and, of this amount, $29,000 will be returned to the Bagwell Company after six years.
The investment will produce $61,000 in income before depreciation and taxes for each of the six years.
The corporation is in a 40 percent tax bracket and has a 6 percent cost of capital.
(a) Calculate the net present value. (Round "Percentage depreciation" and "PV Factor" to 3 decimal
places. Round all dollar values to the nearest whole number. Omit the "$" sign in your
response.)
Yes
No
18.
value:
2.00 points
(a) Compute the tax loss on the sale and the related tax benefit if the asset is sold now for
$22,560.(Round "Percentage depreciation" to 3 decimal places. Input all amounts as positive
values. Omit the "$" sign in your response.)
Tax benefit $
(b) Compute the gain and related tax on the sale if the asset is sold now for $71,060. (Round
"Percentage depreciation" to 3 decimal places. Input all amounts as positive values. Omit the
"$" sign in your response.)
Taxable gain $
Tax obligation $
19.
award:
2.15 out of
3.00 points
Year Amount
1 $ 230,000
2 190,000
3 160,000
4 145,000
5 110,000
6 100,000
The tax rate is 40 percent. The cost of capital must be computed based on the following:
Cost
(aftertax) Weights
Debt Kd 9.20% 20%
Preferred stock Kp 13.80 10
Common equity
(retained earnings) Ke 18.00 70
(a) Determine the annual depreciation schedule. (Round "Percentage depreciation" to 3 decimal
places. Round all dollar values to the nearest whole number. Omit the "$" sign in your
response.)
(b) Determine annual cash flow. Include recovered working capital in the sixth year. (Round all dollar
values to the nearest whole number. Omit the "$" sign in your response.)
(c) Determine the weighted average cost of capital. (Round your intermediate calculations and final
answer to 2 decimal places. Omit the "%" sign in your response.)
(d)Determine the net present value. (Round "PV Factor" to 3 decimal places. Round your
intermediate and final answer to the nearest whole number. Negative amount should be
indicated by a minus sign. Omit the "$" sign in your response.)
20.
value:
5.00 points
Assume the new equipment would provide the following stream of added cost savings for the next
six years. Use Table 12–9 and Appendix B.
1 $65,000
2 55,000
3 53,000
4 51,000
5 48,000
6 37,000
The firm’s tax rate is 30 percent and the cost of capital is 11 percent.
What is the book value of the old equipment? (Round "Percentage depreciation" to 3 decimal
(a)
places. Omit the "$" sign in your response.)
Book value $
(b) What is the tax loss on the sale of the old equipment? (Omit the "$" sign in your response.)
Tax loss $
(c) What is the tax benefit from the sale? (Omit the "$" sign in your response.)
Tax benefit $
(d) What is the cash inflow from the sale of the old equipment? (Omit the "$" sign in your response.)
Cash inflow $
(e) What is the net cost of the new equipment? (Include the inflow from the sale of the old
equipment.)(Omit the "$" sign in your response.)
Net cost $
(f) Determine the depreciation schedule for the new equipment. (Round "Percentage depreciation" to
3 decimal places. Omit the "$" sign in your response.)
1 $ $
$
(g) Determine the depreciation schedule for the remaining years of the old equipment. (Round
"Percentage depreciation" to 3 decimal places. Omit the "$" sign in your response.)
1 $ $
(h) Determine the incremental depreciation between the old and new equipment and the related tax
shield benefits. (Round all dollar values to the nearest whole number. Round "Tax rate" to 2
decimal places. Omit the "$" sign in your response.)
Depreciation Depreciation
on new on old Incremental Tax shield
Year equipment equipment depreciation Tax rate benefits
1 $ $ $ $
6
(i) Compute the aftertax benefits of the cost savings. (Round "Tax rate" to 2 decimal places. Omit the
"$" sign in your response.)
After tax
Year Savings (1 − Tax rate) savings
1 $65,000 $
2 55,000
3 53,000
4 51,000
5 48,000
6 37,000
(j) Add the depreciation tax shield benefits and the aftertax cost savings, and determine the present
value.(Round "PV Factor" to 3 decimal places. Round your intermediate and final answers to
the nearest whole dollar amount. Omit the "$" sign in your response.)
Tax shield
benefits from After tax Total annual Present value
Year depreciation cost savings benefits factor Present value
1 $ $ $
6
$
(k) Compare the present value of the incremental benefits (j) to the net cost of the new equipment
(e).(Negative amount should be indicated by a minus sign. Omit the "$" sign in your response.)
No
Yes
21.
value:
1.00 points
Problem 13-1 Risk-averse [LO2]
Assume you are risk-averse and have the following three choices.
Expected Standard
Projects value deviation
A $2,010 $1,700
B 2,420 2,260
C 2,180 1,340
(a) Compute the coefficient of variation for each. (Round your answers to 2 decimal places.)
Coefficient of
Projects variation
A
22.
value:
1.00 points
Problem 13-2 Expected value and standard deviation [LO1]
Lowe Technology Corp. is evaluating the introduction of a new product. The possible levels of unit sales
and the probabilities of their occurrence are given.
Possible Sales in
market reaction units Probabilities
Low response 20 .30
Moderate response 35 .20
High response 45 .20
Very high response 60 .30
(a) What is the expected value of unit sales for the new product? (Round your answer to 2 decimal
places.)
Expected value
(b) What is the standard deviation of unit sales? (Round your final answer to 2 decimal places.)
Standard deviation
23.
award:
0 out of
1.00 point
Additional
Possible outcomes sales in units Probabilities
Ineffective campaign 20 .40
Normal response 110 .40
Extremely effective 140 .20
Coefficient of variation
24.
value:
2.00 points
Problem 13-7 Coefficient of variation [LO1]
Five investment alternatives have the following returns and standard deviations of returns.
Returns: Standard
Alternatives Expected value deviation
A $ 1,280 $ 1,150
B 1,790 1,490
C 12,300 2,200
D 1,310 1,350
E 65,400 19,400
Calculate the coefficient of variation and rank the five alternatives from lowest risk to the highest risk by
using the coefficient of variation. (Round your answers to 2 decimal places.)
Coefficient of
Alternatives variation Rank
A (Click to select)
B (Click to select)
C (Click to select)
D (Click to select)
25.
value:
1.00 points
You did not receive credit for this question in a previous attempt
Problem 13-10 Coefficient of variation and time [LO1]
Sensor Technology wishes to determine its coefficient of variation as a company over time. The firm
projects the following data (in millions of dollars):
Profits: Standard
Year Expected value deviation
1 $ 93 $ 34
3 157 65
6 206 98
9 226 120
(a) Compute the coefficient of variation (V) for each time period. (Round your answers to 2 decimal
places.)
Coefficient of
Year variation
1
(b
Does the risk (V) appear to be increasing over a period of time?
)
Ye
s
No
26.
value:
2.00 points
Tim Trepid is highly risk-averse while Mike Macho actually enjoys taking a risk.
Returns: Standard
Investments Expected value deviation
Buy stocks $ 9,010 $ 6,470
Buy bonds 7,030 2,460
Buy commodity futures 26,800 23,900
Buy options 21,200 21,500
(a-1) Compute the coefficients of variation. (Round your answers to 3 decimal places.)
Coefficient of
variation
Buy stocks
Buy bonds
Buy options
(a-2) Which one of the following four investments should Tim choose?
Buy bonds
Buy stocks
Buy commodity futures
Buy options
27.
value:
1.00 points
You did not receive credit for this question in a previous attempt
Problem 13-13 Coefficient of variation and investment decision [LO1]
Kyle's Shoe Stores, Inc., is considering opening an additional suburban outlet. An aftertax expected cash
flow of $100 per week is anticipated from two stores that are being evaluated. Both stores have positive
net present values.
Site A
Probability Cash flows
.20 50
.40 100
.25 110
.15 150
Site B
Probability Cash flows
.10 20
.20 50
.40 100
.20 150
.10 180
(a) Compute the coefficient of variation for each site. (Do not round intermediate calculations. Round
your answers to 4 decimal places.)
Coefficient of
variation
Site A
Site B
(b) Which store site would you select based on the distribution of these cash flows? Use the coefficient of
variation as your measure of risk.
Site A
Site B
28.
value:
1.00 points
1 $ 9,180
2 13,100
3 21,700
4 19,400
5 25,600
Coefficient of
variation Discount rate
0 − .25 7%
.26 − .50 11
.51 − .75 15
.76 − 1.00 17
1.01 − 1.25 20
(a-1)
Select the appropriate discount rate.
7%
11%
15%
17%
20%
(a-2) Compute the net present value. Use Appendix B. (Round "PV Factor" to 3 decimal places,
intermediate and final answers to the nearest dollar amount. Negative amount should be
indicated by a minus sign. Omit the "$" sign in your response.)
(b) Based on the net present value should the project be undertaken?
No
Yes
29.
value:
1.00 points
Discount rate
10
20
(b) What is the impact of a high discount rate on long-term inflows?
30.
value:
1.00 points
$ 3,890 .3
5,330 .2
8,390 .2
9,880 .3
(a) What is the expected value of the cash flow? (Omit the "$" sign in your response.)
(b) What is the expected net present value? Use Appendix D. (Round "PV Factor" to 3 decimal places,
intermediate and final answers to the nearest dollar amount. Negative amount should be
indicated by a minus sign. Omit the "$" sign in your response.)
Yes
No
31.
value:
1.00 points
You did not receive credit for this question in a previous attempt
Problem 13-18 Deferred cash flows and risk-adjusted discount rate [LO3]
Highland Mining and Minerals Co. is considering the purchase of two gold mines. Only one investment
will be made. The Australian gold mine will cost $1,630,000 and will produce $306,000 per year in years
5 through 15 and $572,000 per year in years 16 through 25. The U.S. gold mine will cost $2,012,000 and
will produce $270,000 per year for the next 25 years. The cost of capital is 10 percent.
(a-1) Calculate the net present value for each project. (Round "PV Factor" to 3 decimal places,
intermediate and final answers to the nearest dollar amount. Omit the "$" sign in your
response.)
Australian Mine
U.S. Mine
(b-1) If the Australian Mine justifies an extra 1 percent premium over the normal cost of capital because
of its riskiness and the relative uncertainty of cash flows, recalculate the net present value of the
mine.(Round "PV Factor" to 3 decimal places, intermediate and final answers to the nearest
dollar amount. Negative amount should be indicated by a minus sign. Omit the "$" sign in
your response.)
Yes
No
32.
value:
2.00 points
You did not receive credit for this question in a previous attempt
Problem 13-20 Risk-adjusted discount rate [LO3]
Mr. Sam Golff desires to invest a portion of his assets in rental property. He has narrowed his choices
down to two apartment complexes, Palmer Heights and Crenshaw Village. After conferring with the
present owners, Mr. Golff has developed the following estimates of the cash flows for these properties.
Palmer Heights
Yearly aftertax
cash inflow
(in thousands) Probability
$ 90 .2
95 .2
110 .2
125 .2
130 .2
Crenshaw Village
Yearly aftertax
cash inflow
(in thousands) Probability
$ 95 .2
100 .3
110 .4
120 .1
Mr. Golff is likely to hold the complex of his choice for 30 years, and he will use this time period for
decision-making purposes. Either apartment complex can be acquired for $206,000. Mr. Golff uses a
risk-adjusted discount rate when considering investments. His scale is related to the coefficient of
variation.
Coefficient of
variation Discount rate
0 – 0.20 5 %
(cost of
0.21 – 0.40 8
capital)
0.41 – 0.60 12
Over 0.60 16
(a) Compute the risk-adjusted net present values for Palmer Heights and Crenshaw Village. (Omit the
"$" sign in your response.)
(b-1) Which investment should Mr. Golff accept if the two investments are mutually exclusive?
Crenshaw Village
Palmer Heights
Both
None
(b-2) Which investment should Mr. Golff accept If the investments are not mutually exclusive and no
capital rationing is involved?
Palmer Heights
Crenshaw Village
Both
None
33.
value:
1.00 points
Problem 13-21 Decision-tree analysis [LO4]
Allison’s Dresswear Manufacturers is preparing a strategy for the fall season. One alternative is to
expand its traditional ensemble of wool sweaters. A second option would be to enter the cashmere
sweater market with a new line of high-quality designer label products. The marketing department has
determined that the wool and cashmere sweater lines offer the following probability of outcomes and
related cash flows.
The initial cost to expand the wool sweater line is $161,000. To enter the cashmere sweater line the
initial cost in designs, inventory, and equipment is $136,000.
(a) Calculate Net present value. (Negative amounts should be indicated by a minus sign. Omit the
"$" sign in your response.)
You did not receive credit for this question in a previous attempt
Problem 13-22 Probability analysis with a normal curve distribution [LO4]
When returns from a project can be assumed to be normally distributed (represented by a symmetrical,
bell-shaped curve), the areas under the curve can be determined from statistical tables based on
standard deviations. For example, 68.26 percent of the distribution will fall within one standard deviation
of the expected value ( ± 1σ). Similarly 95.44 percent will fall within two standard deviations (
± 2σ), and so on. An abbreviated table of areas under the normal curve is shown here.
Number of σ's
from expected
value + or – + and –
.50 .1915 .3830
1.00 .3413 .6826
1.50 .4332 .8664
1.75 .4599 .9198
2.00 .4772 .9544
Assume Project A has an expected value of $34,000 and a standard deviation ( σ ) of $6,800.
(a) What is the probability that the outcome will be between $23,800 and $44,200? (Round your answer
to 4 decimal places.)
Probability .8664
(b) What is the probability that the outcome will be between $20,400 and $47,600? (Round your answer
to 4 decimal places.)
Probability .9544
(c) What is the probability that the outcome will be at least $20,400? (Round your answer to 4 decimal
places.)
Probability .9772
(d) What is the probability that the outcome will be less than $45,920? (Round your answer to 4
decimal places.)
Probability .8770
(e) What is the probability that the outcome will be less than $30,600 or greater than $40,800? (Round
your answer to 4 decimal places.)
Probability 0.617
35.
value:
1.00 points
You did not receive credit for this question in a previous attempt
Problem 13-23 Increasing risk over time [LO1]
The Oklahoma Pipeline Company projects the following pattern of inflows from an investment. The
inflows are spread over time to reflect delayed benefits. Each year is independent of the others.
(a) Compute the standard deviation for each of the three years. (Round your answers to 2 decimal
places.)
Standard deviation
Year 1
Year 5
Year 10
36.
value:
1.00 points
Problem 13-24 Portfolio effect of a merger [LO5]
Treynor Pie Co. is a food company specializing in high-calorie snack foods. It is seeking to diversify its
food business and lower its risks. It is examining three companies—a gourmet restaurant chain, a baby
food company, and a nutritional products firm. Each of these companies can be bought at the same
multiple of earnings. The following represents information about the companies.
Correlation
with Expected Standard deviation
Treynor Pie Sales earnings($ in earnings
Company company ($ millions) millions) ($ millions)
Treynor Pie Company +1.0 $ 182 $ 9 $ 3.0
Gourmet restaurant + .5 63 9 1.2
Baby food company + .3 54 6 1.7
Nutritional products company − -.6 75 7 3.8
(a-1) Compute the coefficient of variation for each of the four companies. (Round your answers to 2
decimal places.)
Coefficient of
variation
Treynor Pie Company
Gourmet restaurant 0
Gourmet restaurant
Baby food company
Nutritional products company
Treynor Pie Company
(b) Which of the acquisition candidates is most likely to reduce Treynor Pie Company's risk?
37.
value:
1.00 points
You did not receive credit for this question in a previous attempt
Problem 13-25 Portfolio effect of a merger [LO5]
Transoceanic Airlines is examining a resort motel chain to add to its operation. Prior to the acquisition,
the normal expected outcomes for the firm are as follows:
Outcomes
($ millions) Probability
Recession $35 .40
Normal economy 55 .20
Strong economy 75 .40
(a) Compute the expected value, standard deviation, and coefficient of variation. (Enter your answer in
millions. Round Standard deviation to 2 decimal places and final answer to 3 decimal
places.Omit the "$" sign in your response.)
Expected value $
Standard deviation $
Coefficient of variation
38.
value:
1.00 points
You did not receive credit for this question in a previous attempt
Problem 13-27 Certainty equivalent approach [LO1]
Sheila Goodman recently received her MBA from the Harvard Business School. She has joined the
family business, Goodman Software Products, Inc., as vice president of finance.
She believes in adjusting projects for risk. Her father is somewhat skeptical but agrees to go along
with her. Her approach is somewhat different than the risk-adjusted discount rate approach, but achieves
the same objective.
She suggests that the inflows for each year of a project be adjusted downward for lack of certainty
and then be discounted back at a risk-free rate. The theory is that the adjustment penalty makes the
inflows the equivalent of riskless inflows, and therefore a risk-free rate is justified.
A table showing the possible coefficient of variation for an inflow and the associated adjustment factor
is shown below:
Coefficient of Adjustment
variation factor
0 – .25 .90
Assume a $180,000 project provides the following inflows with the associated coefficients of variation
for each year.
Coefficient of
Year Inflow variation
1 $31,800 .15
2 53,200 .23
3 77,000 .52
4 59,100 .71
5 66,100 1.10
(a) Fill in the table below (Round "Adjustment factor" to 2 decimal places. Omit the "$" sign in
your response):
1 $
(b-1) If the risk-free rate is 5 percent, compute the net present value of the adjusted inflows. Use Appendix B. (Round
"PV Factor" to 3 decimal places, intermediate and final answers to the nearest whole dollar amount.
Negative amount should be indicated by a minus sign. Omit the "$" sign in your response.)
Yes