Electrical System Design Guidelines
Electrical System Design Guidelines
Electrical System Design Guidelines
PART: I – Topside
CHAPTER: 3 – Eletrical
SECTION 3.1
INDEX
1. OBJECTIVE ...................................................................................................................... 5
1. OBJECTIVE
This specification and the references thereof shall be used as guidelines for the design,
specification of equipment and performance of the electrical installation of Offshore Production
Units.
• IEC 61034-2 Measurement of smoke density of cables burning under defined conditions –
Test procedure and requirements
• IEC 61378-1 Convertor Transformers - Transformers for Industrial Applications
• IEC 61892 Mobile and fixed offshore units – Electrical installations, parts 1, 2, 3, 4, 6, 7
• IEC 62040 Uninterruptible Power Systems (UPS), parts 1-2, 2, 3
• IEC 62259 Secondary cells and batteries containing alkaline or other non-acid electrolytes -
Nickel-cadmium prismatic secondary single cells with partial gas recombination
• IEC 62271-200 High-voltage switchgear and controlgear - AC metal-enclosed switchgear
and controlgear for rated voltages above 1 kV and up to and including 52 kV
• IEEE 242 Recommended Practice for Protection and Coordination of Industrial and
Commercial Power Systems
• IEEE 519 Recommended Practices and Requirements for Harmonic Control in Electrical
Power Systems
• IEEE 1584 Guide for Performing Arc-Flash Hazard Calculations
• IEEE C37.20.2 Standard for Metal-Clad Switchgear
• IEEE C37.91 Guide for Protective Relay Applications to Power Transformers
• IEEE C37.96 Guide for AC Motor Protection
• IEEE C37.102 Guide for AC Generator Protection
• IEEE C57.110 Recommended Practice for Establishing Transformer Capability When
Supplying Nonsinusoidal Load Currents
• IMO MODU CODE - Code for the Construction and Equipment of Mobile offshore Drilling
Unit
• ISA RP 12.2.02 Recommendations for the Preparation, Content, and Organization of
Intrinsic Safety Control Drawings
• ISO 8528-5 Reciprocating Internal Combustion Engine Driven Alternating Current
Generating Sets - part 5 – Generating Sets
• NEMA MG-1 Motors and Generators
• NFPA 110 Standard for Emergency and Standby Power Systems
• NFPA 780 Standard for the installation of lightning protection systems
• IEC/TR 61641 Enclosed low-voltage switchgears and controlgear assemblies - Guide for
testing under conditions of arcing due to internal fault
Brazilian Regulations
• INMETRO Portaria 179/2010 – For certification of Ex-protected equipment
• NORMAM, Brazilian Maritime Authority regulations
• NR-10 Electric Safety Code – Brazilian Ministry of Labour
• NR-17 Ergonomics
• NR-26 Safety Signaling
3. ENVIRONMENTAL CONDITIONS
For sizing the electrical equipment, the reference temperatures below shall be considered:
4. INCLINATION LIMITS
Electrical equipments, switchgears, and components shall be specified to operate within static and
dynamic inclination limits to the relevant type (normal or essential/emergency system), according to
IMO MODU CODE and the Classification Society rules.
When access to rear part of switchgear and controlgear assemblies is required for installation
and/or maintenance, their backsides shall be least 600 mm away from the nearest obstacle;
except that the width may be reduced to 500mm where there are stiffeners and frames.
At least 1000 mm or a greater clearance shall be allowed on front sides for withdrawal and
removal of circuit breakers/drawers; a minimum free space of 400mm shall be met when
circuit breakers or drawers are in extracted position.
(3) The Turbogenerators auxiliary loads LV MCC control circuit shall be fed from redundant
UPSs to prevent TGs shutdown in the event of transient undervoltage.
The voltage regulation limits on a steady state and transitory condition shall comply with table
below.
Table 4 – Voltage regulation limits
In case of a limitation of large motor starting current is required, soft-starter or VSD devices shall be
used. The use of star-delta type starters or auto-transformers is not allowed.
For DC system: ± 10% deviation for steady state regime and +12/-15% for transient.
Parameter Deviation
Parameter Deviation
The electrical system shall be dimensioned so as to limit the short circuit levels as below.
13,8 kV ≤ 50
4,16 kV ≤ 40
480 V Switchgear ≤ 65 (2)
480 V CCM ≤ 18
Notes:
(2) It shall be considered momentary synchronism for black-start and for periodical tests
of the emergency or auxiliary generator with main generation.
(3) A reasonable margin above the calculated value shall be considered for the
specification of the switchboards.
(4) When exceeding, means to limit and reduce short-circuit levels alternatives may be
considered (e.g., Is-Limiter, reactors, etc).
(5) The simultaneous operation of all main generators shall be considered, including
parallelism to change an in-service to a standby generator.
The system THD shall comply with the limits shown in the IEEE Std. 519, not exceeding 5%, with
individual components limited to 3%, at the worst operating condition, under the harmonic distortion
viewpoint.
Where passive filters are required to meet such levels on the generation busbar, filters shall be
sized and split so that on a single failure of any filter or opening of main bus tie-breaker, the THD is
limited to 8%, and each individual component is limited to 5%, in any bus.
The earthing and detection methods shall comply with IEC 61892-2 requirements and the
Classification Societies’ rules, as applicable.
For MV generation and distribution systems, the high resistance earthing, with instantaneous
selective tripping in the event of earth fault, shall be adopted.
Note: For MV system, an earth fault shall be quickly and selectively isolated, to avoid
severe damages to the winding and to the laminated iron core of generators and motors.
For LV generation and distribution systems, the high resistance earthing shall be adopted, except,
for oil storage units (FPSO, FSO) where isolated neutral systems shall be adopted.
The high resistance earthing system shall be sized so as to assure resistive current equal to or
higher than the system capacitive current, in any operating configuration/number of generators
running, to avoid system overvoltages/surge in the event of earth fault.
Lighting transformers for Accommodation areas shall be solidly earthed.
Lighting transformers for other areas shall be solidly earthed, except for oil storage units (FPSO,
FSO) where isolated neutral system shall be adopted.
UPS output shall be isolated from the earth.
For isolated neutral or high-resistance earthed systems, all LV distribution Switchgear below shall
be provided with an earth fault detector (Bender, Vigilohm, or similar), for each outgoing feeder, with
common alarm at CSS.
• 480V Switchgears (Aux. Switchgear, Essential Switchgear, Topsides Switchgear,
Vessel/Utilities Switchgear);
• Distribution Panels for UPS;
• Direct current distribution panels.
The earth fault detector shall be installed on each semi-bus, if a tie circuit breaker is available. The
earth detection systems shall be compatible and intercommunicate among them, so that a priority
(master) is assigned to monitor all interconnected system when tie-breaker is closed.
The fault finding at MCC and Distribution Panels may be through portable clamp meter.
An earth fault signaling set with three lamps and test push button (NC), shall be installed at each:
• MCC (Topsides, auxiliary and essential);
• Lighting transformer secondary power distribution switchboard (when IT secondary).
MV/MV
Secondary
Generator Generator Switchgear MCC AC UPS DC UPS
System Transformer;
Switchgear,
MCC
IT,
IT,
High-resistance
High- Isolated
earthed neutral Isolated
resistance neutral
FPSO; FSO or main bus neutral
earthed
earthing
neutral
transformer
Isolated IT Isolated IT
IT,
IT,
Semi- High-resistance IT, High- IT, High-
High-
Submersible earthed neutral resistance resistance
resistance
or Fixed or main bus earthed earthed
earthed
Units earthing neutral neutral
neutral
transformer
Current
≤ 20 A ≤ 10 A ≤5A ≤5A
Level
Summary Summary
Discriminative Summary Discriminativ Summary
Alarm Alarm at Alarm at
at CSS CSS e at CSS CSS
CSS CSS
Earth
detection, Switchgear,
MCC Distribution Positive &
three lamps all semi-
bus Panel Negative
with test buses
button
• Petrobras’ standardization
For the generation arrangement, it shall be considered one generator in standby mode (N-1).
A 10% margin between maximum expected demand and the (N-1) generating capacity should be
considered.
8.1.1. Standardization
For standardization purposes, the following arrangement shall be considered.
8.1.1.1. Production Fields with High GOR (Gas-to-Oil Ratio)
Gas/diesel fueled TG rated 25 MW net, at site condition (typically at 30°C) shall be considered.
It shall be also considered, the generation capacity to start the biggest installed electric motor, as
follows:
(a) 4 x 25 MW configuration:
Three 31,5 MVA (n-1) paralleled generators to direct start an induction motor up to 13
MW, or Two 31,5 MVA (n-2) paralleled generators to direct start an induction motor up
to 11 MW.
(b) 3 x 25 MW configuration:
Two 37 MVA (n-1) paralleled generators to direct start an induction motor up to 13 MW,
or Two 31,5 MVA (n-1) paralleled generators to direct start an induction motor up to 11
MW.
Where the gas compressor size is higher than values above, it shall be evaluated the splitting of
compressor drive in more stages with smaller motors or, compressors to be directly driven by
gas turbine, or driven by an electrical variable speed drive (VSD).
In any of the above mentioned case, the heat rejection taken by the WHRUs, shall also be
considered with one generator in standby (n-1), and generators running with 75% average
electrical load.
Notes:
(1) In any case above, it may be considered an AVR pre-booster to raise system
voltage about 5% just prior to motor starting, in order to limit the voltage transient
below 15% at the main bus.
(2) Direct start induction motors, with a low starting current (Ist/In ≤ 3,8) shall be
considered, with sufficient margin of accelerating torque.
(3) It was assumed for studies a synchronous generator with X’d ranging from 0,22 to
0,29 p.u.
(4) The generators ranging from 31,5 to 37 MVA are of the same frame.
Auxiliary TGs may be considered when a small and very sharp electrical demand peak for a short
time would avoid the installation of additional generator.
8.1.4. Synchronism
The synchronism of main generators shall be possible manually by operator, at TGCP.
The parallelism shall be possible at each main generator circuit breaker and at the bus coupler (tie)
circuit breaker.
In all cases, the synchronism-check relay (25) shall interlock the circuit breaker closing.
All instruments and controls to perform synchronism shall be assembled together on each generator
TGCP.
The selection of loads and the priorities shall be defined during the Detailed Design.
As general rule, the water injection pumps and gas reinjection system (if any), shall be
tripped at first stage, as they represent heavy loads, non essential on a short term.
The selection of shedding loads may be rescheduled at any time by operator.
The Load Shedding System shall be hardwired, operating within the required actuating
time, as defined by the system stability study.
The signal acquisition and transmission shall not be through network; the actual demand
of generators and main loads shall be acquired by transducers in the MV bus.
The following functions for the Load Shedding System shall be provided, as minimum:
• Trend of gradual overload alarm;
• Gradual overload shedding;
• Sudden overload shedding (generator malfunction/loss);
• Underfrequency shedding;
• Load inhibition (to avoid the connection of any incoming load which would exceed the
available spinning generators capacity).
Note: The turbine de-rating shall be considered on gas-to-liquid fuel change.
8.1.6. Protection
The protection for main generators shall be as simple as possible, designed so that shutdown occur
only when the equipment integrity may be impaired and comply with ANSI/IEEE C37.102. The
protective actions shall be split in steps, as follows:
• Alarm
• Generator Breaker trip
• Generator Exciter trip
• Turbine shutdown
For generation protection, all relays shall be microprocessed, multifunction, from MVLO.
Notes: It shall be specified conformal coating for marine environment;
It shall be supplied the state of the art relays, subject to Petrobras’ approval.
Protective relay should be installed in TGCP. For main generator with a capacity equal to or larger
than 6 MVA, adopt a single 51 microprocessed relay from different manufacturer, as a minimum
backup configuration, in the Main Switchboard.
Note: The relays shall be coordinated, and may use the same CTs and PTs.
Two independent starting means shall be provided, the first one with capacity of at least 6 (six)
attempts; the second means with capacity of at least 3 (three) attempts. The storage and charging
means shall be independent for each starting system. One cold starting means shall be provided.
The charging and storage means for starting (e.g., starting air vessel, dedicated diesel-driven air
compressor or battery) shall be located on the emergency generator room; these devices shall not
be used for any purpose other than for the operation of the emergency generator set [IMO MODU
CODE].
The quick-closing fuel valve shall be of normally-open type, with a mechanical manually actuaded
closing device, that is not dependent on any energy source for it’s actuation, located outside the
emergency generator room, in case of fire inside this room. This actuation device shall be located
close to the CO2 flooding button.
8.2.1. Synchronism
Synchronism shall be possible with main generators or auxiliary generator (with one system only at
a time).
It shall be used only for momentary parallelism for the transfer of loads with no interruption, for the
load tests of emergency generator or restoring the main generation, after a blackout. The
synchronism shall be made only locally.
Note: The reactance shall be assigned to fit maximum short-circuit level specified for essential
switchboard bus during this synchronization. Alternatively, the tests may be conducted
with tie-breaker referred in 8.2.3 temporarily open.
The control panel shall be provided with the analog instruments and synchronization facilities for
periodical tests and restoring conditions after a blackout.
The emergency generator protection shall be as simple as possible, designed so that shutdowns
occur only when the equipment integrity may be impaired.
Notes:
• Emergency generator shall be tripped only by overload/short-circuit, reverse power or
loss of field;
• The diesel engine shall be tripped only by “low lube oil pressure”, “engine overspeed” or
“high-high temperature”.
• Backfeed line shall be tripped when 90% of emergency generator capacity is reached;
The essential loads feeders shall have neither an undervoltage trip (UVT) nor undervoltage relay
(27).
The essential switchgear shall be provided with a bus-tie circuit-breaker without tripping unit, to
allow periodically starting and load tests of emergency generator. The emergency generator bus
side shall be connected to motor driven loads.
Auxiliary generation shall be dimensioned to provide a second starting means for turbo generators,
where main generation shuts down and emergency generation is unavailable.
The auxiliary generator control panel (AGCP) shall be equal to emergency generator controls.
The UPSs system (UPS, inverters, batteries and distribution panels), when redundant, shall be
installed in separated rooms.
The UPS shall not have cross interconnections between the redundant batteries.
The output of DC UPS and AC Inverter shall be isolated from the earth, with an earth fault detection
and alarm on each bus and alarm to CSS.
The UPS and Inverter distribution circuit shall be exclusive for feeding the emergency consumers,
and it shall not be used for any other purpose. Each load shall be fed from exclusive branch,
individually protected by a circuit breaker.
The rectifier shall be provided with input for inhibition of deep charging mode (boost) in case of
hydrogen detection inside battery room. See DR-ENGP-I-1.3 – Safety Philosophy.
The UPS system configuration (Rectifier, Inverter and batteries) shall be of simple arrangement,
comprising of two redundant units (2 x 100%), operating isolated, see Figure 1.
The distribution switchgears shall have full capacity interconnecting circuit breakers for load
transfer.
It shall consist of two battery banks and two rectifiers; each set shall have 100% load capacity. Each
rectifier supplies power to a distribution panel. The distribution panel shall be interconnected
through normally open circuit breakers. See item 10.3.2.
This system shall provide 24VDC general control voltage, via a local rectifier and battery, on top of
each column for semi-submersible unit.
It shall be used for dedicated controls and starting of fire-fighting pumps, emergency generator and
auxiliary generator, fed from the essential bus, and a battery bank near to the driven equipment.
The charger and battery sets for turbo-generator and turbo-compressor emergency post-lube oil
pumps shall be independent, preferably supplied by TG and TC package vendor.
The TG and TC Control Panels shall be fed from Emergency Loads UPS (item 9.1), with two
redundant feeders. A static switch for automatic transference shall be provided inside control
panels.
These auxiliary loads shall be disconnected by time delay bus undervoltage relay (27) to avoid
direct reconnection after restoring from blackout.
Note: Emergency consumers (example: main TG control panel, etc.) shall be fed by two
redundant feeders from different UPSs. A static switch shall be provided for automatic
transfer, in case of single internal power source.
The LV MCC control circuit shall be fed by common local redundant voltage transformers.
The control voltage shall be obtained from 2 VTs in different drawers, each one dimensioned to
feed 100% of the MCC load.
The protection for the secondary of these transformers and the individual drawer shall have
coordination and selectivity among them.
Switchgear/MCC circuit breakers shall not have built-in undervoltage trip device (UVT).
The shutdown signals (ESD) shall be hardwired, through dry contacts (no voltage); they shall not
transit through relays and IEDs.
Switchgears and MCCs shall be provided with local hardwired “stop” latching type push-button at
drawer.
Field push-button station located near to the equipment, shall have following functions:
• Stop, latching type, hardwired
• Transfer to Remote (command from CSS or Package Unit control Panel, as applicable)
• Start
For ballast & bilge pumps, the MCC shall be provided with direct start/stop controls, hardwired, at
starter drawers. These drawers shall be provided with kW-meter.
When a submersible type pump/motor is specified, the local push-button station shall not be
installed in the pump room. The starter drawers shall be located above the worst damage water line.
Close/open operation of main switchgear circuit-breakers, may be performed manually at each
switchgear (transformers and MCC feeders, tie-circuit breakers, etc.);
Close/open operation of these circuit-breakers may also be performed remotely by Electrical
System Workstation installed in LER and ECR (or Auxiliary Switchboard Room).
ESW shall provide monitoring & control of electrical system, switchboard and MCCs (at LER), and a
second station for engineering/maintenance (at Engine Control Room or Auxiliary Generation
Switchboard Room).
Gateways shall be used to transfer control and monitoring data between the electrical devices
capable of communicate with the Process Controllers and Fire & Gas Controllers of CSS through
network.
The communication between the Electrical System Gateways and the Process Controllers and the
Fire & Gas Controllers shall be through redundant peer-to-peer Modbus TCP over Ethernet
networks.
The Electrical System Gateways shall also establish the connection between the Electrical System
HMIs and the electrical devices, and CSS, through an OPC Ethernet link.
Each Electrical System Gateway shall be constituted of two redundant PLCs with no common mode
failure and with facilities for hot-swap.
Two Gateways shall be installed; one in the Vessel Auxiliary Switchboard Room and other in the
Topsides electrical room (LER).
Fluorescent lamps lighting fixtures shall be made of non-metallic material or stainless-steel with
quick-start, dual-pin, high power factor reactor.
High pressure sodium vapor lamp, stainless steel floodlight shall be applied for outdoors area, Ex-
protected.
Metal halide lamp can be applied for non hazardous indoors areas.
10.3.1. Essential Lighting
Essential lighting is the one fed from emergency generator; the number of fixtures, including
emergency lighting shall be around:
• Utilities areas – 20%
• Process areas – 10%
• Control Rooms – 50%
• Muster Stations – 50%
• Electrical switchgear rooms – 30%
• Emergency & Auxiliary Generator rooms – 30%
• Offices – 5%
The essential lighting fixtures connected to a lighting transformer fed from emergency generator,
installed in non-hazardous outdoors areas, shall be suitable for Group IIA, T3, increased safety type
(Ex-e), see Figure 1 - Ex Protection Philosophy.
All emergency lighting shall be specified for Zone 1, Group IIA, T3, increased safety type (Ex-e),
except indoors accommodation areas.
The electrical equipment shall comply with the requirements provided in IEC 61892-3 and IEC
61892-7, and applicable Classification Society.
All electrical equipment shall be dimensioned for the rated capacity for continuous operation (S1),
when fed from a system with the voltage and frequency regulations within the tolerances shown in
7.2 and 7.3, and with the harmonic content shown in 7.6, except when otherwise indicated, for
intermittent regime equipment (e.g., cranes, etc.).
The electrical equipment shall be made from durable materials, at least a flame retardant, non-
hygroscopic material, not affected by humidity/moisture, marine environment, and oil vapors, etc., to
which it is exposed.
The “Ex” protection type indicated in the item “Ex” Protection Philosophy – shall be followed for
application and specification of electrical equipment, according to location.
The use of aluminum enclosure/electrical equipment and accessories is not allowed in outdoors
location.
The installation shall comply with IEC 61892-6 and applicable Classification Society’s rules.
Contractor shall submit the equipment/accessory specification and assembly/installation methods
for the electrical equipment, cables, and accessories (Electrical outfitting practices - typical details).
The location, assembly of controls and scale of instruments shall comply with the ergonomic
principles, according to ASTM F 1166-07, adequate to brazilian average stature.
Following height range should be considered (including panel base height + welded foundation on
deck):
• Controls requiring accurate or frequent operation: 1,0 to 1,6 m
• Instrument for accurate or frequent operation and emergency controls: 1,4 to 1,7 m
• Maximum height for digital relays top and instruments provided with a menu button:
2,0 m
All labels, instructions, and safety warnings shall be in PORTUGUESE language or bilingual
(Portuguese + English).
Signal color standards shall be observed, according to NR-26.
Control movement direction, and corresponding expected operation and movement shall be
according to IEC 60073, IEC 60447.
All switchgears, MCC, UPS, control panels, field push-buttons, etc., shall have NAME identification,
with equipment FUNCTION, and TAG on each outgoing feeder/drawer, and on local push-buttons.
The rear part of all cubicles shall be identified with TAG and/or NAME in the front part, for all
switchgear and MCC.
For standardization purposes, the color coding usage shall be according to Table 9.
Table 9 - Colour Coding for Human-Machine Interfaces for electrical switchboards and control gears
Indicator
Function Recommendations for use
Colour
• any corrective action shall be taken;
• system or equipment is inoperative;
Blinking Red Alarm
• any emergency condition exist;
• potential damage to equipment or persons.
Acknowledged Alarm
• a fault condition has occurred, but already has
Turned on
Red been acknowledged by the operator;
Energized
• system or equipment is operating.
[Stop push-button]
• equipment blocked for maintenance;
Blocked • circuit-breaker, drawer withdrawn or test
White Removed position;
Earthed • outgoing cables terminals earthed for
maintenance personnel’s safety.
Protection Actuated
Yellow/Amber Tripped
Overloaded
Ready to Start
Green Switched-off
[Start push-button]
ESD Actuated
Blue
Other Functions
11.1.2. Instruments
The instruments shall comply with IEC 61892-3.
The critical distribution and control panels shall be provided with instruments with accuracy class
1.5% or better.
The Main (TGCP), Auxiliary (AGCP) and Emergency (EGCP) generators control panel shall be
provided with analogue instruments.
Socket outlets
Accessories,
Transformer
Switchgear
Switches &
Generator
Rectifiers
Equipment ⇒
Junction
Lighting
Fixtures
Boxes
Motor
UPS,
Location
⇓
Notes:
Shall not be installed in these spaces.
Equipment installed inside rooms protected by water mist shall be minimum IP44
All electrical and electronic equipment installed in hazardous area shall be certified by an
international recognized laboratory. The equipment/accessories made in Brazil or imported for
trading in Brazil shall comply with Portaria INMETRO 179/2010 or subsequent rule in force.
A data-book with certificates of compliance and annexes shall be delivered to Petrobras. These
certificates shall be recorded in electronic database.
All electrical equipment installed inside paint lockers shall be certified for zone 1, group IIB, T3, type
Ex-e.
Note: For battery room see item “Battery Installation”.
For installation in hazardous areas, IEC 61892-7 and relevant parts of IEC 60079 according Ex-
protection type shall be complied with.
LEGEND:
11.2. Generators
The generator specification shall comply with IEC 61892-3 and 60034-1 and applicable
Classification Society's rules.
The synchronous generators shall meet the THD and individual harmonic limits, according to IEC
61892-3.
When forced lubrication system applies to generator, it shall be assured lubrication during run-down
time, up to final stopping/cooling down of driving turbine, in the event of shutdown or ESD,
preferably through a gravity system.
The generator shall be suitable for marine use and continuous, maintenance-free operation for at
least 10,000 hours.
All generator units shall be suitable to operate in parallel, being equipped with damping winding or
similar construction.
The MV generator stator winding shall be vacuum impregnated (VPI).
For generators rated 6.0kV or above it shall be specified spray test according to NEMA MG-1.
In this case, the stator windings, including the lead connections, shall have a sealed insulation
system to be capable of withstanding a spray test for sealed winding conformance test in
accordance with NEMA MG-1 Part 20; for MV generators water spray test shall be performed at
least for one sampling machine.
For MV generator all coils shall have anti-corona protection, achieved using a semi-conduction tape,
in the slot part of the coil.
Where the rated voltage is in excess of 6 kV, all coils shall, in addition to anti-corona protection,
have stress grading.
All MV generator rated in excess of 6 kV and larger than 5 MVA shall be provided with partial
discharge couplers (Iris or compatible) for each phase.
All exciting system, including the exciter, AVR, etc., shall be sized at 110% of rated capacity, at
rated power factor, for continuous operation.
When a system with “field-forcing” is specified for starting large motors, the exciter and AVR shall
be over-sized, accordingly.
Inspection hatches shall be specified for all generators, allowing a visual inspection of the bearings,
exciter and replacement of the rotating diodes.
The generators shall be provided with a dehumidifier heating resistance fed from the normal lighting
transformer, automatically disconnected during its operation.
The starters for Medium Voltage motors shall be withdrawable drawers, provided typically with
current limiting fuses and vacuum contactors.
For operator’s protection against internal arc fault, the circuit breaker assembly shall be provided
with means to engage/disengage moving power contacts with frontal door fully closed.
The relays shall be of multifunction, microprocessed type, with an interface for communication with
the ESW network. Note: relays shall be specified with conformal coating for marine environment,
manufacturer’s state-of-the-art type, subject to Petrobras’ approval.
11.3.2. LV Switchboards
All Low Voltage switchboards shall comply with IEC 60439-1.
All LV Switchgears shall be certified for internal arc fault testing (“arc-proof”), according to IEC/TR
61641.
The LV Switchgear shall be provided with optical arc-detectors at all columns associated with
incoming overcurrent sensors, for instantaneous trip of all power sources.
The internal segregation between the independent devices or MCC drawer units shall be made with
barriers/partitions, Form 3b at least, according to IEC 60439-1. For package unit see annex A.
Switchgear and MCC shall be specified Partially at least type-tested Assembly (PTTA), according to
IEC 60439-1.
The protective relays for motors fed from Distribution Switchgear should be of electronic overload
relay type (IED). For other loads from Distribution Switchgear the circuit breaker built-in tripping
(IED) device may be used for protection. In any case, communication link to be provided. For any
case, the short circuit protection shall be provided by the circuit breaker built-in instantaneous
tripping unit.
The LV circuit breakers tripping devices shall not be used for motor protection. They may be
used for protection of non-motor loads.
The UPSs shall have a 60 seconds delay before releasing the input voltage failure alarm, until the
emergency generator starting or reconnection of main generation, to reduce the quantity of alarm
signals sent to CSS.
The UPSs shall be provided with facilities to perform discharge tests and verification of the battery
autonomy time/capacity.
The UPS shall be provided with a mimic diagram with status indication LEDs on the front door.
The UPS shall be provide with analogic instruments on the front door (input and output voltage,
output current, battery zero central scale current).
11.6.1 Inverters
The Inverters unit shall comply with IEC 60146, IEC 62040-2 and IEC 62040-3.
PMW technology shall be used to convert DC to VCA, through IGBTs.
The Inverter shall be modular arrangement and shall be consist of (n+1) modules, with hot swap
and hot standby facilities.
The Inverter shall be free-standing assembly. Each Inverter module shall be self-ventilated. In case
of module failure, an alarm shall be given and sent to CSS.
The output frequency range of the inverter shall be 60 Hz ± 3 Hz synchronized with bypass source
or ± 0,05 Hz in free-running mode (internal oscillator).
The inverter shall limit the Total Harmonic Distortion (THD) of the output voltage to less than 3%
RMS total with 100% linear load or less than 5% RMS with 100% nonlinear load. The individual
harmonics shall not exceed 3%.
The printed circuit boards shall be suitably protected against aggressive, saline and high humidity
environment ("conformal coating").
The Inverters shall be capable to operate with input supply variation of ± 15% in steady state
conditions.
The output of inverter shall be isolated from the earth, with an earth fault detection and alarm on
each bus. The alarm shall be signaled at the CSS.
The inverter shall be capable of delivering 150 % of its rated output for one minute. For short-circuit
clearing and overloads the unit may switch to bypass without interruption to the emergency
consumers.
A by-pass branch with galvanically isolated transformer, fed from an independent feeder with a
dedicated circuit-breaker, shall be provided for each inverter system.
It shall be facilities to transfer the loads between inverters without interruption.
Each Inverter shall be provided with static switch for automatic transfer to by-pass transformer.
Each Inverter shall be provided with a make-before-break maintenance switch for isolation and safe
access.
The inverter’s output distribution panel shall be provide with analogic instruments on the front door
(input voltage and current) and synchronism check relay (25).
The static bypass circuit shall have a continuous current rating equivalent to the rated output of the
Inverter and shall be short time rated to meet the following requirements:
• 1000 % of inverter rating for 50 ms, bypass;
• 150 % of inverter rating for 1 min.
11.7. Batteries
Battery casing shall be made of flame-retardant material. Additionally, for vented type, casing shall
be transparent.
11.7.1. Type and Specification It shall be specified Lead Acid batteries or Alkaline.
The battery shall be specified for the discharge cycle and autonomy time for the specific application.
11.7.1.1. Ventilated lead-acid batteries
Only lead-acid batteries with a service life of 10 years or above shall be specified, according
to the design conditions.
11.7.1.2. Valve-regulated lead-acid batteries (VRLA)
Only high integrity, valve-regulated lead-acid batteries with a service life of 10 years or above
shall be specified, according to the design conditions, complying with IEC 60896-22.
VRLA-type batteries shall not be used in engine starting systems (emergency generator, fire
pumps, etc.) [NFPA 110].
Rectifier for a VRLA battery shall be specified with temperature compensation floating
charging, and with no provisions to boost-charging mode and low ripple content.
The UPS electronic printed boards shall be specified with conformal coating for marine
environment.
11.7.1.3. Alkaline Batteries
Alkaline batteries (Nickel Cadmium) shall be designed that does not require water
replacement during the operational life of 20 years under normal operating conditions.
The specification, sizing and installation of cables shall comply with IEC 61892-4 and the
Classification Society's requirements, as applicable, for current carrying capacity, voltage drop,
short circuit thermal limit, bunching factor, etc.
Cables for services, required to be operable under fire conditions are to be of fire resistant type
complying with the requirements of IEC 60331, where they pass through machinery spaces of
category A (SOLAS) and other high fire risk areas other than those which they serve, according to
DR-ENGP-I-1.3 – Safety Philosophy.
The electrical cables exposed to sun radiation shall have a dark-colored protective jacket or be
properly protected against weather exposure, to avoid degradation caused by the UV rays.
All power and control cables installed inside the Living Quarter module and control rooms shall be of
halogen-free type, low smoke emission, according to IEC 60332, parts -2 and -3, smoke ratio
according to IEC 61034-2, and low emission of toxic smoke, according to IEC 60754-1 and IEC
60754-2.
The low voltage cables shall be insulated for 0.6/1.0 kV, with full insulation from phase to earth, so
as to operate in an isolated neutral system or earthed through high impedance, with a continuous
earth fault.
For systems having short-time selective earth fault trip (t < 1 s, category A, IEC 60092-352, item
3.2), 3.6/6.0 kV class cables can be used for Vn 4.16kV and 8.7/15 kV class for Vn 13.8kV. For LV
systems, cables with phase-earth insulation equal to or higher than the system phase-phase voltage
shall be adopted.
Control cables insulation shall be 250V, according to IEC 60092-376, except when connected to low
impedance power sources, e.g., control voltage transformers primary, when it shall be insulated for
0,6/1.0kV.
The control cables carrying analog signals, as well as control cables with PLC
interface/interconnection, shall meet the instrument cable specification, with a braided pair and each
pair individually shielded, with general shielding under the outer jacket.
For three-phase cables, adopt maximum sections 120 mm² for MV and 150 mm² for LV.
For single-core cables, adopt maximum sections 300 mm² for MV and LV.
Up to 480 300
4.160 600
11.000/13.800 750
Special care shall be taken for cables feeding motors driven by frequency convertors with high
output harmonic content.
Cable installation and shielding/armour earthing shall comply with item Motor Power Cables in the
IEC 60034-25.
To avoid interferences over neighbour circuits, some alternatives below should be considered:
Cables installed inside metallic conduits or closed type metallic cable trays.
Specifying three-phase, perfectly symmetrical and concentrically, earthed shielding or metallic
armor cables. The PE earthing conductor shall have concentric outer screen, or whether it is an
inner conductor, it shall be split into three sections, symmetrically distributed about conductors.
The output filter, when required, shall be tuned for the selected type and cable length and shall be
agreed with VSD manufacturer.
Both IEC 61892-6 and applicable Classification Society’s rules shall be complied with.
IEC 60092-502 shall be complied with on a complementary basis for FPSO and FSO UNITS.
Metallic structures, vessels, tanks, and non-electrical equipment skids, not directly welded on the
vessel’s metallic structure or hull, shall be earthed through a conductor with at least 25mm² cross
section.
The metallic piping and accessories for gas or other low-conductivity flammable fluid shall have a
means to assure galvanic contact through screwed flanges, and a direct connection to vessels or
tanks directly earthed, for discharge of static electricity, according to API RP 2003. In this case,
piping and accessories that do not have an electrical continuity shall be provided with a flexible
copper wire connecting the spools.
For FRP (non metallic) piping bonding, see IMO Resolution A.753 (18).
All 220V socket outlets at indoors areas shall be compatible among them. Socket outlet pin shall be
of Brazilian standardized type.
For hazardous or any outdoor area, it shall be specified Ex-de (increased safety) socket outlet, with
built-in Ex-d disconnector switch, interlocked with plug to prevent the plugging and unplugging to
live sockets.
A standardized model/type of Ex-de socket outlet, for each voltage/current rating, shall be installed
in all platform modules and outdoor areas.
The socket outlets station for underwater inspection or diving equipment shall be fed from dedicated
individual circuit, connected to emergency generator.
Adequate protective measures against electrical shock are required, especially for handheld tool
and portable lighting fixture sockets, with a residual differential-type circuit breaker (DR).
All three-phase socket outlets on the Unit shall have the same phase sequence rotation, to prevent
an unexpected motor reversal. The R>S>T phase sequence shall be clockwise.
The control rooms, essential switchgear rooms, workshops shall have 10% of the total sockets
installed fed from emergency generator circuit.
The service socket outlets stations shall be connect to normal power supply (automatically tripped
by ESD-3 shutdown).
A number of sufficient socket outlets stations shall be installed to connect temporary containers,
handheld tools, and others, with the following voltages:
(a) 480 Volts, three-phase, 32 Amperes, 4-pole (3P+E);
(b) 220 Volts, two-phase, 16 Amperes, 3-pole (2P+E).
Outdoor or indoor service areas shall be provided with a set of fixed socket outlets to meet any
temporary service station, with a 25m long cable, with no need to run through watertight doors or
stairs between decks.
The deck areas for the temporary containers (e.g., compressor and turbo generator maintenance)
shall be provided with at least one socket outlets station. The temporary unloading area shall have
at least one socket station, impact-protected, in the vicinities.
When package unit is specified as a “stand alone unit”, Supplier’s scope shall also include:
• Local on skid control & protection Panel;
• Sub-distribution system for package unit small power consumers (motors, heaters,
auxiliaries and controls) when controlled from a control panel located at the package unit;
• Motor starters and feeders shall be integrated in the package unit control panel, including
heating resistance circuits to be fed from Platform lighting circuit;
• Motor local push-button control station and supports;
• Field instrumentation;
• On skid cabling installed on skid cable trays;
• Lighting design/installation, for hood assembled;
• Safety stop switches, if applicable.
• HMI, if applicable.
Push-button colors (start & stop) and indicator lamp colors (running, stopped, heater and common
alarm) shall be as stated in the item Ergonomics (according to NR10).
Supplier shall provide the relevant Cause and Effect Matrix indicating interface with the Platform
Control and Safety systems, including:
• Package Unit internal protective alarms and shutdown;
• Signaling and alarms on local panel;
• Alarm & trip set-points list;
• Shutdown controls originating from CSS/VESSEL;
• Remote signaling/monitoring to CSS/VESSEL.
ESD signal from Platform shall be hardwired, “normally open”, dry-type contact.
The interface with safety systems, shutdown, pressure relief, etc. shall be provided by Supplier.
Contractor shall inform such interfaces.
For hood assembled package unit, Fire & Gas Detection and other safety system shall be provided
by Supplier, unless otherwise stated in the specification/datasheet.
When required to communicate with CSS/VESSEL, TCP-IP protocol shall be used.
No fiber optic cables shall be used, unless approved by Petrobras.
It should be foreseen means to synchronize the CSS/VESSEL clock with all clocks in Package Unit
controls processors and IED, if any.
4. Hazardous Area
The electrical equipment installed in non-hazardous outdoor areas and operating during an
emergency situation (ESD-3) shall be suitable for use in hazardous areas classified at least as
Group IIA, Zone 2, T3, unless it is automatically shut down on the presence of gas in the equipment
area.
Contractor shall inform which Package Unit systems or subsystems shall remain in operation after
an emergency shutdown (ESD-3).
If the Package Unit contains or is intended to handle flammable fluids, Supplier shall deliver the
hazardous classification area plan for the skid.
Contractor shall inform area classification for the location.
Control panels and starters shall be mounted protected from vibration, high temperature, water jet
washing, maintenance works with heavy loads handling.
6. Power Supply
The short circuit level shall be considered for dimensioning and proper protection of switchgear and
drawers components.
Contractor shall inform the type and characteristics of the electrical system feeders, the system
earthing system, short-circuit level for supply feeder at package incoming, quantity type and cables
cross section, incl. outer diameter, etc.
Available Power:
System Frequency: 60Hz
MV – 13.800 Volts AC, 3-phase, neutral point earthed through high resistance
MV – 4.160 Volts AC, 3-phase, neutral point earthed through high resistance
LV – 480 Volts AC, 3-phase, isolated neutral (FPSO)
UPS – 220 Volts AC, 3 or 2-phase, 60Hz, isolated neutral
DC – 24 Volts DC, isolated from earth
7. Documentation
The following documentation shall be presented by Supplier at bid stage:
• General Arrangement, including required space for operation & maintenance, space for
removal main equipment/component;
• Cause & Effect Matrix, indicating the interfaces to plant safety system (CSS) and Hull
systems (VESSEL), and Package Unit internal protections;
• Load List including power consumptions for each supply voltage and power supplies
ranked as normal, essential or emergency (UPS);
• Load List consumers shall indicate the power consumption according to the following
conditions:
o normal operation condition
o idling warm-up/cool-down
o standby
o shut-down stopping & running time required to complete safe stopping
• List of proposed equipment & parts, maker/models;
• Inform Contractor when Package Unit equipment will contain hazardous sources and
required ventilation;
• Motors datasheets;
• Control & safety architecture block diagrams;
• Power and Control diagram, and interfaces cable block diagrams;
• General one-line diagram;
• Switchgear, rectifier, inverter, and battery data sheet and dimensional drawing;
• Heat loss of the unit, auxiliaries, cooling requirements;
• Power distribution arrangement drawing, control, switchgear, and earthing plan;
• Lighting arrangement drawing, if applicable;
• Hazardous Area classification plan, if applicable.
CAPÍTULO: 3 – Elétrica
SEÇÃO 3.1
ÍNDICE
1. OBJETIVO ...................................................................................................................... 66
3. CONDIÇÕES AMBIENTAIS............................................................................................ 68
1. OBJETIVO
Esta especificação e suas referências determinam as diretrizes que devem ser seguidas na
especificação de equipamentos e execução dos projetos de instalações elétricas em Unidades
Marítimas de Produção.
Regulamentos Brasileiros
• Portaria INMETRO 179/2010 - Para certificação de equipamentos para uso em atmosferas
explosivas
• NORMAM – Normas da Autoridade Marítima Brasileira - DPC
• NR-10 - Segurança em Instalações e Serviços em Eletricidade
• NR-17 - Ergonomia
• NR-26 - Sinalização de segurança
3. CONDIÇÕES AMBIENTAIS
Para dimensionamento dos equipamentos elétricos devem ser utilizadas as temperaturas de
referência abaixo:
4. LIMITES DE INCLINAÇÃO
Os equipamentos elétricos, painéis e componentes devem ser especificados para operar dentro
dos limites de inclinação estática e dinâmica especificados para cada tipo de sistema (sistema
normal ou essencial/de emergência), segundo o IMO MODU CODE e as regras da Sociedade
Classificadora.
Quando for requerido acesso traseiro para instalação e/ou manutenção de painéis, deve ser
observada uma distância mínima de pelo menos 600 mm do obstáculo mais próximo, sendo
admitida a redução para 500 mm nos pontos em que houver perfis/reforços estruturais. Nas
partes frontais deve ser previsto um espaçamento mínimo de 1000 mm para a extração ou
retirada de gavetas e disjuntores, devendo haver um espaço livre mínimo de 400 mm quando
a gaveta ou disjuntor estiver na posição totalmente extraída.
6. CLASSIFICAÇÃO DE ÁREAS
Ver DR-ENGP-I-1.3 – Filosofia de Segurança.
(3) Os circuitos de controle dos CCMs de BT dos auxiliares dos Turbogeradores devem ter
alimentadores a partir de UPSs redundantes, para que não ocorra queda dos TGs em caso
subtensão transitória.
Havendo a necessidade de limitação da corrente de partida de motores de grande porte, devem ser
utilizados soft-starter ou conversores de freqüência. O uso de dispositivos de partida estrela-
triângulo ou autotransformadores não é permitido.
Para sistema de CC: desvio de ±10% em regime permanente e +12/-15% em regime transitório.
Parâmetro Desvio
Parâmetro Desvio
13,8 kV ≤ 50
4,16 kV ≤ 40
CDC de 480 V ≤ 65 (2)
480 V CCM ≤ 18
Notas:
(2) Deve ser considerado o sincronismo momentâneo após repartida da geração (Black-
start) e para testes periódicos do gerador de emergência ou auxiliar em paralelo com
a geração principal.
(3) Uma margem razoável acima do valor calculado deve ser considerada na
especificação dos painéis de distribuição.
(4) Quando o valor for excedido, meios alternativos para limitar e reduzir os níveis de
curto-circuito podem ser considerados (p. Ex., limitador ls, reatores, etc.).
Para sistemas de geração e distribuição em BT, deve ser adotado aterramento por alta resistência,
exceto para unidades com armazenamento de petróleo (FPSO, FSO), onde devem ser adotados
sistemas com neutro isolado.
O sistema de aterramento deve ser dimensionado de forma a assegurar que a corrente resistiva
seja igual ou maior do que a corrente capacitiva do sistema, com qualquer configuração/número de
geradores operando, para evitar sobretensões/surtos no sistema em caso de falta a terra.
Transformadores de iluminação das áreas de acomodações devem ser solidamente aterrados.
Transformadores de iluminação para outras áreas devem ser solidamente aterrados, exceto em
unidades com armazenamento de petróleo (FPSO, FSO), onde devem ser adotados sistemas com
neutro isolado.
Saída de UPS deve ser isolada de terra.
O detector de falta à terra deve ser instalado em cada semi-barra se houver disjuntor TIE. Os
sistemas de detecção de falta à terra devem ser compatíveis e se comunicar entre si, de forma a
selecionar o prioritário (mestre) para monitorar todo o sistema interligado quando o disjuntor TIE
estiver fechado.
A localização da falta nas saídas dos CCMs e painéis de distribuição pode ser feita com medidores
portáteis.
Um conjunto de sinalização de falta à terra com três lâmpadas e botão de teste (NF), deve ser
instalado em cada:
• CCM (normal, auxiliar e essencial);
• Painel primário de distribuição de luz (quando secundário IT).
Transform
Sistema ador
Gerador Gerador CDC CCM UPS CA UPS CC
MT/MT;
CDC, CCM
IT,
Aterramento de IT,
neutro por alta Aterrament
FPSO; FSO Neutro Neutro
resistência ou o de neutro
Isolado Isolado
transformador de por alta
aterramento no resistência
barramento principal Isolado
Isolado IT
IT, IT
Aterramento de IT, IT, IT,
Unidades
neutro por alta Aterrament Aterrament Aterramento
semi-
resistência ou o de neutro o de neutro de neutro por
submersíveis
transformador de por alta por alta alta
ou fixas
aterramento no resistência resistência resistência
barramento principal
Nível de
≤ 20 A ≤ 10 A ≤5A ≤5A
corrente
50GS
Alarme de
Detecção de 67N Trip Detector Detector
50GS 59G cada saída
falta à terra/ Direcional (somente de falta de falta p/
Trip Alarme alimentadora
Proteção Trip Zona 1) p/ terra terra
Trip (somente
zona 1)
8. SISTEMA DE GERAÇÃO
Os grupos geradores (acionador e gerador) devem ser adequados para operação contínua com
potência nominal na temperatura ambiente definida no item “Condições Ambientais”.
Para a turbina a gás, a temperatura do ar ambiente definida no documento MeteOcean para a
localização da unidade deve ser considerada.
Fatores de redução para o acionador (motor ou turbina) devem ser considerados, conforme
aplicável:
• Temperatura ambiente local diferente da condição ISO;
• Composição do gás, mudança de combustível gás-para-líquido em turbinas bicombustível;
• Fatores de redução (de-rating) por “envelhecimento” e entre períodos de revisão geral
(“overhauling”).
8.1. Sistema de Geração Principal
A capacidade da geração principal deve ser avaliada na fase de Projeto Básico, considerando a
”Análise de Cargas” e o “Histograma Plurianual de Cargas", mostrando o perfil da demanda de
carga pelo tempo de vida do campo de produção.
Um mapa de análise comparativa para o sistema de geração, seleção da configuração e número
de geradores deve ser emitido nas Bases de Projeto ou Projeto Básico, para dimensionar/ajustar
os acionadores aos requisitos de potência elétrica e demanda térmica para aquecimento do
processo, considerando os seguintes fatores:
• Custo de investimento
• Custos operacionais
o Custo de manutenção
o Custo de combustível
• Continuidade Operacional/ Flexibilidade do Sistema
o Perdas de produção devida à indisponibilidade
• Peso total
• Espaço requerido
• Capacidade instalada x requisitos de máximas demandas elétrica e térmica
• Estabilidade de sistema elétrico; estudos de partida dos maiores motores
• Nível de curto circuito
• Segurança do sistema; rejeição de carga
• Consumo de utilidades (VAC, resfriamento, etc.)
• Capacidade de recuperação de calor na WHRU para o processo
• Assistência técnica
8.1.1. Padronização
Com propósito de padronização, os seguintes arranjos devem ser considerados:
8.1.1.1 Campos de Produção com Alta RGO (relação gás-óleo)
Devem ser considerados Turbo-Geradores a gás/diesel com potência nominal líquida de 25 MW
na condição de instalação “site” (tipicamente a 30°C).
Também deve ser considerada a capacidade de geração necessária para partir o maior motor
elétrico instalado, como se segue:
(a) Configuração 4 x 25 MW:
Três geradores de 31,5MVA em paralelo (N-1) para a partida direta de um motor de
indução de até 13 MW, ou Dois geradores de 31,5MVA em paralelo de (N-2) para a
partida direta de um motor de indução de até 11 MW.
(b) Configuração 3 x 25 MW:
Dois geradores de 37MVA em paralelo (N-1) para a partida direta de um motor de
indução de até 13 MW, ou Dois geradores de 31,5MVA em paralelo (N-2) para a partida
direta de um motor de indução de até 11 MW.
Onde o dimensionamento dos compressores indicar potências superiores aos valores acima,
deve ser avaliada a divisão do compressor em mais estágios com motores menores ou a
utilização de compressores diretamente acionados por turbinas à gás ou acionados por
conversores de frequência (VSD).
Em todos os casos acima, a rejeição de calor disponível na WHRU também deve ser
considerada, com um gerador em stand-by (N-1) e os demais geradores em operação com
carga elétrica média de 75%.
Notas:
(1) Em todos os casos acima, pode ser considerado um pré-booster no AVR para
elevar a tensão do sistema em aproximadamente 5%, imediatamente antes da
partida do motor, para limitar o transitório de subtensão menor que 15% no
barramento principal.
(2) Motores de indução de partida direta, com baixa corrente de partida (Ist/in ≤ 3,8)
devem ser considerados, com folga suficiente no torque de aceleração.
(3) Foi assumido nos estudos um gerador síncrono com X´d entre 0,22 e 0,29 p.u.
(4) Os geradores na faixa de 31,5 a 37 MVA são da mesma carcaça.
TGs auxiliares podem ser considerados quando ocorrer um curto pico de demanda elétrica
por pouco tempo, podendo evitar a instalação de gerador adicional.
8.1.4. Sincronismo
O sincronismo dos geradores principais deve ser possível no modo manual pelo TGCP.
O paralelismo deve ser possível em cada disjuntor dos geradores principais ou no disjuntor de
interligação do barramento (tie).
Em todos os casos o fechamento do disjuntor só deve ser possível com a permissão do relé de
verificação de sincronismo (25).
Todos os instrumentos e controles para executar o sincronismo devem ser montados reunidos no
TGCP de cada gerador.
Pelo menos as seguintes funções devem ser incluídas no Sistema de Descarte de Cargas:
• Alarme por tendência de sobrecarga gradual;
• Descarte por sobrecarga gradual;
• Descarte por sobrecarga súbita (mau funcionamento/perda de gerador);
• Descarte por sub-freqüência;
• Inibição de carga (para evitar a entrada de qualquer carga que excederia a capacidade
disponível dos geradores em operação).
Nota: Deve ser considerada a redução da capacidade da turbina (de-rating) na
mudança do combustível de gás para líquido.
8.1.6. Proteção
A proteção dos geradores principais deve ser tão simples quanto possível, projetada de forma que
o desligamento só ocorra quando a integridade do equipamento possa ser comprometida e de
acordo com a ANSI/IEEE Std C37.102. As proteções devem atuar em estágios, como segue:
• Alarme;
• Trip do disjuntor do gerador;
• Trip da excitatriz do gerador;
• Parada da turbina.
Para a proteção dos geradores, todos os relés devem ser microprocessados, multifunção, do
MVLO.
Notas: Devem ser especificados relés com tratamento adequado para atmosfera
marítima (conformal coating);
Devem ser fornecidos relés no estado da arte, sujeitos à aprovação da Petrobras.
O relé de proteção deve ser instalado no TGCP. Para gerador principal com capacidade igual ou
superior a 6 MVA, deve ser previsto um relé de proteção de retaguarda função 51, de outro
fabricante, instalado no CDC Principal.
Nota: Os relés devem ser coordenados e podem usar os mesmos TCs e TPs.
Os meios de recarga e armazenamento para acionar a partida (p. Ex., vaso de ar de partida,
compressor à motor diesel dedicado ou bateria) devem ser localizados na sala do gerador de
emergência; esses dispositivos não devem ser usados para nenhuma outra finalidade além da
operação do grupo gerador de emergência [IMO MODU CODE].
A válvula de fechamento rápido de combustível deve ser normalmente aberta, com acionamento
manual mecânico externo à sala do gerador de emergência, que não dependa de energia, para
cortar a alimentação de combustível em caso de incêndio nesta. Este dispositivo deve estar junto a
botoeira de acionamento do CO2
8.2.1. Sincronismo
O sincronismo deve ser possível com os geradores principais ou com o gerador auxiliar (com um
único sistema por vez).
O sincronismo deve ser usado apenas para paralelismo momentâneo para a transferência de
cargas sem interrupção, para os testes de carga do gerador de emergência ou para restaurar a
geração principal, após um blackout. O sincronismo deve ser feito apenas localmente.
Nota: A reatância deve ser ajustada para atender ao nível máximo de curto-circuito para o
CDC essencial durante esta sincronização. Alternativamente, os testes podem ser
conduzidos com o disjuntor tie, citado no item 8.2.3, temporariamente aberto.
Os alimentadores de cargas essenciais não devem ter bobinas de mínima tensão (UVT) nem relés
de subtensão (27).
O CDC essencial deve ser provido com um disjuntor TIE sem disparadores, para permitir a partida
e testes de carga periódicos do gerador de emergência. A semi-barra do gerador deve ser
conectada a cargas motóricas.
Para evitar o desligamento do gerador de emergência por sobrecarga, deve haver supervisão de
demanda do mesmo, de modo a alarmar com 85% de carga (kW); quando em operação de back-
feed.
Quando em uso, o disjuntor de back-feed deve ser automaticamente desconectado no caso de um
evento ESD-3 para desconectar as cargas não essenciais.
Os circuitos de distribuição de UPS e dos inversores são exclusivos para alimentar as cargas de
emergência, e não devem ser usados para nenhum outro objetivo. Cada carga deve ser alimentada
por um ramal exclusivo, individualmente protegido por um disjuntor.
O retificador deve ser provido de entrada para inibição do modo de carga profunda (boost) no caso
de detecção de hidrogênio na sala de baterias. Vide DR-ENGP-I-1.3 – Filosofia de Segurança.
Figura 1 – Diagrama simplificado típico do sistema UPS para alimentação das cargas de emergência
Os circuitos de controle dos CCMs de BT dos auxiliares dos Turbogeradores devem ter
alimentadores a partir de UPSs redundantes, para que não ocorra queda dos TGs em caso
subtensão transitória.
Estas cargas auxiliares devem ser desconectadas por relé de subtensão do barramento (27)
temporizado, para evitar religação direta quando do retorno de um blackout.
Nota: Os consumidores de emergência (exemplo: painel de controle de gerador principal,
etc.) devem ser alimentados por dois alimentadores redundantes de UPS diferentes. Uma
chave estática deve ser fornecida para transferência automática, em caso de fonte de
alimentação interna única.
Os circuitos de controle dos CCMs de BT devem ser alimentados por transformadores de comando
locais, redundantes, comuns a todas as gavetas.
A tensão de controle será obtida a partir de 2 TPs em gavetas diferentes, cada um dimensionado
para alimentar 100 % da carga do CCM.
A proteção dos secundários desses transformadores e da gaveta individual devem ter coordenação
e seletividade entre si.
Os disjuntores dos CDCs e CCMS não devem ser equipados com bobina de mínima tensão (UVT).
Os sinais de desligamento em emergência (ESD) devem ser físicos, por contatos secos (sem
tensão); tais sinais não devem transitar por relés e IEDs.
Os CDCs e CCMs devem ser providos com botoeiras de desligamento com retenção, hardwired
nas gavetas.
A botoeira de campo localizada próximo ao equipamento deve ter as seguintes funções:
• “Desliga”, com retenção, conexão direta hardwired;
• Transferência para “Remoto” (comando a partir do CSS ou do painel de controle da
unidade pacote, conforme aplicável);
• “Liga”.
Para bombas de lastro e esgoto, o CCM deve conter controles diretos de liga/desliga nas gavetas.
Essas gavetas devem ser equipadas com medidor de kW.
Quando especificada uma bomba/motor de tipo submersível, a estação de botoeira local não deve
ser instalada na sala de bombas. As gavetas de acionamento devem ser localizadas acima da pior
linha d’água de avaria.
A operação de ligar/desligar os principais disjuntores dos CDCs pode ser executada manualmente
em cada CDC (alimentadores de transformadores e CCMs, disjuntores TIE, etc.);
A operação de ligar/desligar esses disjuntores também pode ser executada remotamente pela
estação de trabalho do sistema elétrico instalada na LER e ECR (ou Sala do CDC Auxiliar).
As luminárias fluorescentes devem ser construídas de material não metálico ou aço inoxidável, com
partida rápida, pinos duplos e reator de alto fator de potência.
Em áreas externas devem ser aplicados projetores de aço inox com lâmpadas de vapor de sódio
de alta pressão, com proteção Ex..
Lâmpadas de vapor metálico podem ser aplicadas em áreas internas não classificadas.
10.3.1. Iluminação Essencial
A iluminação essencial é aquela alimentada pelo gerador de emergência. O número de luminárias,
incluindo as luminárias de emergência deve ser em torno de:
• Áreas de Utilidades – 20%
• Áreas de Processo – 10%
• Salas de Controle – 50%
• Pontos de Encontro em Emergência – 50%
• Salas de Painéis Elétricos – 30%
• Salas dos Geradores Auxiliar e de Emergência – 30%
• Escritórios – 5%
As luminárias essenciais instaladas em áreas externas não classificadas devem ser de segurança
aumentada (Ex-e), adequadas para o Grupo IIA, T3, ver a figura 1 - Filosofia de Proteção Ex.
Todas as etiquetas, instruções e avisos de segurança devem ser escritos na língua portuguesa ou
serem bilíngues (Português + Inglês).
Os padrões de cor da sinalização devem ser observados, segundo a NR-26.
O sentido de movimento dos controles e os correspondentes movimentos e operações esperados,
devem ser de acordo com IEC 60073 e IEC 60447.
A parte traseira de todos os cubículos deve ser identificada com o mesmo TAG e/ou NOME da face
parte frontal, para todos os CDC e CCM.
Todos os CDCs, CCMs, UPSs, painéis de controle, botoeiras de campo, etc., devem ter
identificação com NOME, FUNÇÃO do equipamento, e TAG em cada saída alimentadora/gaveta, e
nas botoeiras locais.
Para efeitos de padronização, deve ser empregada a codificação de cores da Table 9.
11.1.2. Instrumentos
Os instrumentos devem atender à IEC 61892-3.
Os painéis críticos de distribuição e controle devem ter instrumentos com classe de precisão 1,5 %
ou melhor.
Os painéis de controle dos geradores principais (TGCP), auxiliar (AGCP) e de emergência (EGCP),
devem ser providos com instrumentos analógicos.
Transformador
Interruptores e
Retificadores
Acessórios,
Luminárias
Equipamento ⇒
Caixas de
Tomadas
Gerador
Junção
Painéis
UPSs,
Motor
Localização
⇓
Notas:
Não deve ser instalado nesses espaços.
Equipamentos instalados dentro de salas protegidas por névoa de água (water mist) devem
ser no mínimo IP44
Para instalações em áreas classificadas devem ser observados os requisitos da IEC 61892-7 e
partes relevantes de IEC 60079, segundo o tipo de proteção “Ex”.
LEGENDA:
11.2 Geradores
A especificação dos geradores deve atender às normas IEC 61892-3 e 60034-1 e às regras
aplicáveis da Sociedade Classificadora.
Os geradores síncronos devem obedecer aos limites de distorção harmônica total (THD) e
individual estabelecidos na IEC 61892-3.
Quando um sistema de lubrificação forçada se aplicar ao gerador, a lubrificação deve ser
assegurada durante o tempo de desligamento, até a parada final/resfriamento da turbina
acionadora, em caso da parada por falha ou ESD, preferencialmente através de um sistema por
gravidade.
O gerador deve ser adequado para uso marítimo e operação contínua, isento de manutenção
durante pelo menos 10.000 horas.
Todos os geradores devem ser adequados para operação em paralelo, sendo equipados com
enrolamento amortecedor ou construção semelhante.
O enrolamento do estator do gerador de MT deve ser impregnado a vácuo (VPI).
Para geradores com tensão nominal igual ou superior a 6 kV deve ser especificado teste de spray
de água, de acordo com a NEMA MG-1.
Neste caso, os enrolamentos do estator, inclusive os cabos lides, devem ter um sistema de
selagem capaz de resistir a um teste de spray de água, para verificação de conformidade dos
enrolamentos de acordo com a NEMA MG-1, parte 20; para geradores MT o teste de spray de
água deve ser executado em pelo menos uma máquina do mesmo lote.
Para geradores MT todas as bobinas devem ter proteção anti-corona, obtida utilizando uma fita
semi-condutora no trecho da ranhura.
Quando a tensão nominal for maior que 6 kV, todas as bobinas, além da proteção anti-corona,
devem ter alivio do gradiente de tensão.
Todos os geradores com tensão superior a 6kV e maiores do que 5 MVA devem ser equipados
®
com sensores de descargas parciais (Iris ou compatível), em cada fase.
Todo o sistema de excitação, inclusive a excitatriz, AVR, etc., deve ser dimensionado para 110 %
da capacidade nominal, com fator de potência nominal, para operação contínua.
Quando especificado sistema com field-forcing para partida de grandes motores, a excitatriz e AVR
devem ser devidamente sobre-dimensionados.
Devem ser especificadas tampas de inspeção para todos os geradores, permitindo a inspeção
visual dos mancais, excitatriz e substituição dos diodos rotativos.
Os geradores devem ser providos com resistências de aquecimento alimentadas a partir dos
transformadores de iluminação normal, automaticamente desconectadas durante a sua operação.
11.3.1 Painéis de MT
Os compartimentos dos disjuntores terão uma classificação de categoria de perda de continuidade
de serviço LSC2B-PM. Os compartimentos com contatores devem ter classificação LSC2A.
O CDC deve ter uma classificação de arco interno mínima IAC AF (frente, lados, e traseira com
categoria de acessibilidade restrita).
Todos os painéis de MT (CDCs e CCMs) devem ter certificação para teste de falta com arco interno
("à prova de arco"), segundo a IEC 62271-200.
O CDC feito segundo os padrões da ANSI/IEEE deve atender à IEEE C37.20.2 com respeito à
proteção contra arco.
Devem ser previstos dispositivos de alívio de pressão para arcos de faltas.
Os CDCs e os CCMs de MT devem ser providos com detectores óticos de arco em todas as
colunas, associadas a sensores de sobrecorrente nas entradas, para desligamento instantâneo de
todas as fontes de energia.
Os disjuntores devem ser dos tipos a Vácuo ou SF6.
11.3.2 Painéis de BT
Todos os painéis de baixa tensão devem estar em conformidade com a IEC 60439-1.
Todos os CDCs de BT devem ter certificação para teste de falta com arco interno ("à prova de
arco"), segundo a IEC/TR 61641.
Os CDCs de BT devem ser providos com detectores óticos de arco em todas as colunas,
associadas a sensores de sobrecorrente nas entradas, para desligamento instantâneo de todas as
fontes de energia.
A segregação interna entre os dispositivos independentes ou gavetas de CCMs deve ser feita com
barreiras/partições, de Forma 3b pelo menos, segundo a IEC 60439-1. Para unidade pacote vide o
Anexo A.
Devem ser empregados painéis que sejam pelo menos parcialmente testados, tipo “PTTA”, para os
CDCs e CCMs, conforme a IEC 60439-1.
Os relés de proteção para os motores alimentados a partir dos CDCs devem ser preferencialmente
relés eletrônicos de sobrecarga (IEDs). Para as cargas não motóricas dos CDCs os relés de
proteção (IEDs) incorporados aos disjuntores podem ser usados para a função de proteção. Em
qualquer caso deve ser provido um link de comunicação e a proteção de curto circuito deve ser
feita pela unidade instantânea do disparador incorporado ao disjuntor.
Os disparadores dos disjuntores não devem ser usados para a proteção de motores. Eles
podem ser usados para a proteção de cargas não motóricas.
Os níveis máximos de distorção, segundo a IEEE 519, no ponto comum de conexão (PCC) devem
ser:
• Distorção harmônica total (THD) para tensão e corrente ≤ 5 %;
• Distorção harmônica individual de tensão e corrente ≤ 3 %.
Quando o nível de curto-circuito da instalação no ponto de conexão for maior do que o nível de
curto-circuito suportado pela entrada do conversor de freqüência (VSD), um dispositivo coordenado
de limitação de corrente deve ser provido.
Deve ser utilizado retificador controlado a tiristores para conversão da entrada AC principal para
CC, de no mínimo 12 pulsos.
Cada UPS deve ter a capacidade de alimentar seus consumidores e recarregar o banco de
baterias correspondente. A UPS deve ser dimensionada para recarregar uma bateria totalmente
descarregada, para 80 % da sua capacidade, dentro de um período de 10 horas.
Um transformador deve prover isolamento galvânico entre a alimentação AC e a saída CC do
retificador.
O valor rms da tensão de ripple da saída do retificador não deve exceder 1 % de sua tensão
nominal, em condições de plena carga, sem bateria conectada.
Deve ser minimizado o número de disjuntores e elementos de chaveamento, reduzindo a
possibilidade de erros de manobra ou intervenção manual pelo operador em uma condição crítica.
Disjuntores motorizado e contactores não devem ser usados.
Os disjuntores dos bancos de baterias não devem ter bobina de mínima tensão (UVT).
A tensão de saída da UPS CC deve ser limitada a uma variação de ±15% da tensão nominal. Deve
ser evitada a utilização de diodos de quedas para regulação da tensão de saída.
Quando manoplas e alavancas de manobra forem instaladas internamente, deve ser prevista uma
barreira de segurança no mínimo IP-20, com a porta frontal aberta.
A UPS CC deve ser compartimentada de modo que o compartimento do retificador, em
manutenção, não tenha partes vivas acessíveis.
Os itens que requerem acesso para manutenção como, por exemplo, ventiladores e capacitores
devem ser instalados de modo que o acesso aos mesmos possa ser realizado pela porta frontal.
A UPS CC deve ser provida com um alarme audível e visual para falha da tensão de alimentação,
bateria em descarga, subtensão da bateria em 2 níveis (tensão baixa/fim da descarga),
sobretensão na bateria, falta à terra na saída, falha interna (retificador), alta temperatura, e outros.
Um alarme resumido deve ser enviado ao CSS.
A UPS CC deve ter um retardo de 60 segundos antes da liberação de alarme de falha da tensão na
entrada, até a partida do gerador de emergência ou reconexão da geração principal, para reduzir a
quantidade de sinais de alarme enviados ao CSS.
A UPS CC deve ser provida com recursos para execução de testes de descarga e verificação do
tempo de autonomia e da capacidade da bateria.
A UPS CC deve ter um diagrama mímico com LEDs indicativos de estado no painel frontal.
A UPS CC deve ter instrumentos analógicos no painel frontal (tensão de entrada e saída, corrente
de saída, corrente da bateria com zero central).
11.6.1. Inversores
As unidades Inversoras devem atender IEC 60146, IEC 62040-2 e IEC 62040-3.
Os inversores deve usar tecnologia PWM, através da utilização de IGBTs.
Os inversores devem ser do tipo modular e deve ter capacidade de N+1 módulos, com recurso “hot
swap” e “hot standby”.
Os módulos inversores devem ser montados em gabinetes auto-suportantes. Cada módulo inversor
deve possuir ventilação dedicada. Em caso de falha em algum módulo, um alarme deve ser
enviado para a CSS.
A freqüência de saída do inversor deve ser de 60 Hz ± 3 Hz sincronizada com a fonte alternativa ou
± 0,05 Hz por oscilador interno a cristal.
O inversor deve limitar a distorção harmônica total da tensão de saída para menos de 3 % do total
RMS com 100 % de carga linear ou inferior a 5 % RMS com 100 % de carga não linear. A distorção
harmônica individual não deve ultrapassar 3 %.
Os circuitos impressos dos módulos eletrônicos devem possuir tratamento para proteção contra
ambiente agressivo, salino e com elevada umidade (“conformal coating”).
O inversor deve suportar uma variação de tensão de ±15% no fornecimento de energia DC, em
condições de regime permanente.
A saída dos inversores deve ser isolada de terra, com detecção e alarme de falta à terra em cada
barramento. O alarme deve ser sinalizado no CSS.
O inversor deve ser capaz de fornecer 150 % da sua potência nominal durante um minuto. Para
interrupção de curto-circuitos e sobrecargas, a unidade poderá chavear para o by-pass sem
interrupção do fornecimento para as cargas de emergência.
Um ramo by-pass com alimentação independente e disjuntor exclusivo deve ser provido para cada
inversor, com transformador para isolamento galvânico.
Deve haver facilidade para realização de transferência de carga entre os inversores, sem
interrupção.
Os inversores devem ser providos com chave estática para transferência automática para o ramo
by-pass.
Cada inversor deve ser fornecido com uma chave manual de transferência (“make-before-break”)
para isolamento e manutenção segura.
O painel de distribuição na saída do inversor deve ter instrumentos analógicos no painel frontal
(tensão de entrada, corrente de entrada) e relé de sincronismo (25).
O circuito de by-pass estático deve ter uma capacidade contínua de corrente equivalente à nominal
do Inversor e capacidades de curto tempo para atender às seguintes exigências:
1000 % da capacidade do inversor por 50 ms, pelo by-pass;
150 % da capacidade do inversor por 1 minuto.
11.7. Baterias
O invólucro das baterias deve ser feito de material retardante à chama. Adicionalmente, para
baterias do tipo ventilada, o invólucro deve ser transparente.
4.160 600
11.000/13.800 750
As áreas de serviço internas ou externas devem ser dotadas com estação de tomadas, fixa, que
permita alcançar áreas de serviço temporários, com um cabo de 25 m de comprimento, sem a
necessidade de atravessar portas estanques ou escadas entre conveses. As áreas de convés para
containeres temporários (p. ex., manutenção de compressor e de turbo-gerador) devem ser
providas com pelo menos uma estação de tomadas. A área de descarga temporária deve ter pelo
menos uma estação de tomadas na vizinhança, protegida contra impactos.
Quando a unidade pacote for especificada como uma “unidade autônoma”, o escopo do fornecedor
também deve incluir:
• Painel de proteção e controle local no skid;
• Sistema de sub-distribuição de energia para pequenos consumidores da unidade pacote
(motores, aquecedores, auxiliares e controles), quando controlados por um painel de
controle localizado na unidade pacote;
• Demarradores de motores e alimentadores devem ser integrados no painel de controle da
unidade pacote, inclusive os circuitos das resistências de aquecimento a serem
alimentadas pelos circuitos de iluminação da Plataforma;
• Botoeiras locais de controle dos motores e suportes;
• Instrumentação de campo;
• Botoeira de "Liga";
• Sinalização de "Funcionando" (vermelha);
• Chaves seletoras “automático x manual” e “local x remoto”, se aplicável;
• Sinalização de Parada por falha / Alarme;
• Instrumentos;
• Sinalização de Fonte Disponível;
• Sinalização de Fonte da UPS Disponível, se aplicável;
• Interface Homem-Máquina, se aplicável.
As cores das botoeiras (liga & desliga) e as cores dos sinaleiros (funcionando, parado,
aquecimento e alarme comum) devem ser conforme o item Ergonomia (de acordo com a NR10).
O fornecedor deve prover a Matriz de Causa e Efeito relevante, indicando as interfaces com o CSS,
Sistema de Controle e Segurança da Plataforma, incluindo:
• Funções de proteção internas com alarme e shutdown da Unidade Pacote;
• Sinalização e alarmes em painel local;
• Lista de alarmes e ajustes (set-points) das proteções;
• Comandos de shutdown que se originam no CSS/VESSEL;
• Sinalização/monitoramento remotos pelo CSS/VESSEL.
O sinal de ESD da plataforma deve ser “hardwired” por contato seco “normalmente aberto”.
O Fornecedor deve prover as interfaces com os sistemas de segurança, shutdown, alívio de
pressão, etc. A Contratante informará tais interfaces.
O Fornecedor deve prover Detecção de Fogo & Gás e outros sistemas de segurança para a
Unidade Pacote montada em hood, a menos que seja especificado de outra forma na folha de
dados.
Quando for requerida comunicação com o CSS / VESSEL, deve ser utilizado protocolo TCP-IP.
Não devem ser usados cabos de fibra ótica, a menos que seja aprovado pela Petrobras.
Devem ser previstos meios para sincronizar o relógio do CSS/VESSEL com todos os relógios dos
processadores de controle e IED da unidade pacote.
4. Áreas Classificadas
Os equipamentos elétricos instalados em áreas externas não classificadas e que permanecem
operando durante uma situação de emergência (ESD-3) devem ser adequados para utilização em
áreas classificadas, pelo menos Zona 2, Grupo IIA, T3, a menos que sejam automaticamente
desconectados se houver presença de gás na área do equipamento.
A Contratante deve informar quais sistemas ou sub-sistemas da Unidade Pacote devem
permanecer em operação após um shutdown de emergência (ESD-3)
Se a Unidade Pacote contiver ou for destinada a utilizar fluidos inflamáveis, o Fornecedor deve
entregar o plano de classificação de áreas para o skid.
A Contratante deve informar a classificação de área do local do skid.
Os painéis de controle e demarradores devem ser montados protegidos contra vibração, alta
temperatura, lavagem com jato d’água e trabalhos de manutenção com o manuseio de cargas
pesadas.
6. Fontes de Energia
O nível de curto circuito deve ser considerado para o dimensionamento e proteção adequada dos
componentes de gavetas e painéis de distribuição.
A Contratante deve informar o tipo e as características dos alimentadores do sistema elétrico, o
sistema de aterramento, o nível de curto-circuito da alimentação na entrada do pacote, quantidade,
tipo e bitolas cabos, inclusive diâmetro externo, etc.
Fontes disponíveis:
Freqüência do Sistema: 60 Hz
MT – 13.800 Volts CA, 3 fases, neutro aterrado por alta resistência
MT – 4.160 Volts CA, 3 fases, neutro aterrado por alta resistência
BT – 480 Volts CA, 3 fases, neutro isolado (FPSO)
UPS – 220 Volts CA, 3 ou 2 fases, 60 Hz, neutro isolado
CC – 24 Volts CC, isolado de terra
7. Documentação
A seguinte documentação deve ser apresentada pelo Fornecedor na etapa de proposta:
• Arranjo Geral, inclusive espaço necessário para operação e manutenção, espaço para
remoção dos principais equipamentos/componentes;
• Matriz de Causa & Efeito, indicando as interfaces com o sistema de segurança da planta
(CSS) e sistemas da embarcação (VESSEL), e proteções internas da Unidade Pacote;
• Lista de Cargas incluindo os consumos de energia em cada nível de tensão, classificadas
como fonte normal, essencial e de emergência (UPS);
• A Lista de Cargas deve indicar o consumo de energia de acordo com as seguintes
condições:
o Condição de operação normal
o Marcha lenta para aquecimento ou para resfriamento
o Stand-by
o Parada após Shutdown - tempo necessário para o ciclo de parada total
segura
• Lista de equipamentos e partes propostos, fabricantes/modelos;
• Informar à Contratante quando o equipamento da Unidade Pacote contiver fontes de risco
e ventilação requerida;
• Folhas de dados dos motores;
• Diagrama de blocos com a arquitetura de controle e segurança;