Vision ZERO - 7 Golden Rule:: Tehri PSP Mar-20: Mr. Rakesh Kumar Khali

The document provides a summary of Vision ZERO - 7 Golden Rule assessment for the Tehri PSP project in March 2020. It shows the project's compliance with each of the 7 Golden Rules, assigning a score out of 5 for each. The overall score for the project was 75%, classified as "Fair". The Project Manager and HSE Manager/Officer signed off on the assessment.

Uploaded by

Bhagat Deepak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views3 pages

Vision ZERO - 7 Golden Rule:: Tehri PSP Mar-20: Mr. Rakesh Kumar Khali

The document provides a summary of Vision ZERO - 7 Golden Rule assessment for the Tehri PSP project in March 2020. It shows the project's compliance with each of the 7 Golden Rules, assigning a score out of 5 for each. The overall score for the project was 75%, classified as "Fair". The Project Manager and HSE Manager/Officer signed off on the assessment.

Uploaded by

Bhagat Deepak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

Vision ZERO - 7 Golden Rule

Name of the Project : Tehri PSP


Month Mar-20
Name Of the Project Manager : Mr. Rakesh Kumar Khali

Non -
Max
SN Assessment Elements Compliance Compliance Total
Marks
-0.5
1 Golden Rule No 1 4 3 1 -0.5
2 Golden Rule No 2 5 0 5 5
3 Golden Rule No 3 4 1 3 2.5
4 Golden Rule No 4 5 0 5 5
5 Golden Rule No 5 4 0 4 4
6 Golden Rule No 6 5 0 5 5
7 Golden Rule No 7 3 1 2 1.5
30 22.5

Score for the Project 75

Project Manager HSE Manager / Officer

Encl: HSE Inspection Report

The following is the rating classification


95 to 100 - Excellent 90 to 94 - Good
85 to 89 - Fair 70 to 84 - Lacking
HSE SCORING REFERENCE SHEET
Vision ZERO - 7 Golden Rule

Month - March 2020


Compliance Status Vs
Target
(1 - compliance;
Accountability Target 0 - non-
compliance;
n/a - not
applicable)
Golden Rule No 1 - Take Leadership - Demonstrate Commitment
1 PM Conducted PSOP with site team 1 / Month 0
2 PM Conducted Weekly Tool Box Talk (TBT) 4 / Month 1
3 PM Conducted Monthly Motivation Programme for employees Project Manager 1 / Month 0
4 PM Chaired BBS Steering Committee Meeting & reported the same to HO 1 / Month 0
5 PM Issued penalty to sub-contractor & Deducted from sub-contractor final bill As per site NA
Total 1
Golden Rule No 2 - Identify Hazard - Control Risk
1 BBS Observers identified & reports the UA / UC on daily basis 10 observer / Month 1
2 Detail DSR uploaded in online system 100% 1
3 PSOP rounds are conducted as per HCC procedure reuirement. 8 round / Month 1
Project HSE
4 PSOP observations are Uploaded in online system within time Incharge min 10 observation /
1
round
5 Health & Safety non-compliances are Escalated to higher level through online PSOP 20 % of total
1
observation
Total 5
Golden Rule No :3 - Define Targets - Develop Programme
1 Monthly DSR Target is Achieved 80% of target 1
2 Achieved FSI ( Frequency Severity Index) - 0.2 0.2 1
3 Developed & certified the BBS observer All Section Head 10 / Month 0
4 Reported Implementation of HSE objective & Programme 1 / Month 1
5 Organised Health Camp as a improvement programme. 1 / Month NA
Total 3
Golden Rule No 4 - Ensure Safe & Healthy System
1 Control Measure are implemented as per HIRAC for every routine & non-routine activity. 100% 1
2 Near Misses as per DSR Target uploaded in Online portal 100% 1
3 Monthly Safety Theme Implementation status is reported. All Emplyees 1 / Month 1
4 Scheme drawing are available for scaffold. 1 / Month 1
5 Incident CAPA / lesson Learnt implementation status is reported to the HO 1 / Month 1
Total 5
Golden Rule No 5 - Use Safe & Healthy Technology
1 Carried out regular fitness Evaluation of all Equipment ; machines & power tools before deployment
with certification tag As per Activity Plan 1

2 All the applicable legal requirements for Plant ; Machinery equipment & lifting tools tackles are 100 % Compliance of
complied & reported 1
Legal Requirement
3 New safety initiative or any safety innovation done in the Plant ; Machinery equipment & vehicle Project 1 Innovation/
Equipment Head Initiative Report / 1
Month
4 New features deployed in Plant & equipment reverse camera ; delay start mechanism ; rops etc.
As per site na

5 Signalman & banksman are deployed at prominent workplace location. As per site 1
Total 4
Golden Rule 6 - Improve Qualification
1 PM has safety certification qualification 100% 1
2 Site Engineer has safety certification qualification 100% 1
3 Section incharge / site engineer conducted in-house training for their workmen As per monthly
Administration 1
activity Plan
Dept
4 Availability of adequate resources to impart training & Induction as per HCC requirement 100% 1
5 Certified critical operator ; Driver ; signalman ; scaffolder;electrician are deployed at site. 100% 1
Total 5
Golden Rule No 7 - Involve People & Invest In People
1 Organised Health & Safety Competition & Reported to HO 1 / Month NA
2 Project Director conducted safety Review at site or Participated in Safety Talk / PSOP Project Manager 1 / Month NA
3 Adequate budgetory provision for Monthly Motivation Programme & Project HSE As per site 1
4 Workers reported Near Miss cases in near miss report card Incharge
5 Near Miss 0
5 Conducted PSOP round with all the Nodal Safety Officer 1 round / Month 1
Total 2