INSPECTION REPORT
Project No. :
PROJECT : New Compressor Room
Doc. Number :
Location Blasting & Painting : Workshop PT. DUTA
Owner : PT. Vopak Terminal Merak
: -
ITEM NAME :
LOCATION : Jl. Raya Merak Km. 3. Kel. Gerem
Appropriate Drawing
Mark No. / Item No. Profile Material Quantity
Length Thickness
CLEANING
SURFACE PREPARATION : DATE COLOUR OF PAINT
METHOD
Anchore Profile Primer Coat :
Type of Abrasive Cleanliness
2.0 - 3.0 mils (50 - 75 μm) Dry Blasting Second Coat :
Finish Coat :
PAINT PRODUCT NAME / TYPE OF PAINT
MANUFACTURE PRIMER COAT SECOND COAT FINISH COAT
SUWARNO
HAFID QUALITY CONTROL
PT. DUTA UTAMA TEHNIK ABADI PT. DUTA UTAMA TEHNIK ABADI PT. Vopak Terminal Merak
PHOTOGRAPH
PT. DUTA UTAMA TEHNIK ABADI
FOR
MECHANICAL -ELECTRICAL - CONSTRUCTION
DRY FILM THICKNESS (DFT)
(3 COAT SYSTEM)
Primer Coat
84.5 µm 82.8 µm 78.7 µm 81.4 µm 77.4 µm
Second Coat
215 µm 208 µm 216 µm 218 µm 202 µm
Finish Coat
298 µm 264 µm 282 µm 306 µm 257 µm
SIGN ITEM
Name