Asphalt Paving
Asphalt Paving
Asphalt Paving
PART 1 - GENERAL
1.2 REFERENCES
ASTM C 117 Test Method for Material Finer than 0.075 mm (No.
200) Sieve in Mineral Aggregates by Washing
ASTM D 1188 Test Method for Bulk Specific Gravity and Density of
Compacted Bituminous Mixtures Using
Paraffin-Coated Specimens
ASTM D 2419 Test Method for Sand Equivalent Value of Soil and
Fine Aggregate
F. AI - Asphalt Institute
1.3 SUBMITTALS
C. Test Reports.
1. Job-Mix Formula.
2. Schedule
PART 2 - PRODUCTS
2.1 MATERIALS
A. Sub-Grade:
E. Liquid Asphalt:
F. Mineral Filler: Rock or slag dust, hydraulic cement, or other inert material
complying with AASHTO M 17 or ASTM D 242.
2.2 BITUMINOUS PLANT MIX
A. Job Mix:
a. Stability (Marshall):
b. Flow (millimeters):
1) Base Course: 60 - 75
2) Wearing Course: 70 - 80
1) Minimum 14 percent
1) Maximum of 25 percent
B. Variations From Job Mix Based on the Results of Single Test: Variation from
the approved job mix shall not exceed the following:
C. Select asphalt content so that the air voids will not fall below three percent
after allowance is made for job tolerance of plus or minus 0.4 percent.
PART 3 - EXECUTION
A. Batching and Mixing: Mixing plants shall conform to ASTM D 995. Truck
scales shall be provided by Contractor.
A. Proof roll prepared subbase surface to check for unstable areas and areas
requiring additional compaction.
A. General:
E. Place bituminous concrete so that after rolling the nominal thickness of each
layer will not exceed 100 mm. The top layer shall not exceed 50 mm in
thickness.
G. Joint: Make joints between old and new pavements, or between successive
days work, to ensure continuous bond between adjoining work. Construct
joints to have same texture, density and contact surfaces and apply tack
coat.
3.7 ROLLING
C. To prevent adhesion of the mixture, moisten the roller drums with water; an
excess of water will not be permitted.
E. Operate rollers continuously so that all areas of the pavement will receive
substantially equal compaction. Placing will be ordered to stop at any time
that proper rolling is not being performed.
F. Make surface tests to check conformity with the specified crown and grade
immediately after initial rolling. Correct any variation by the removal or
addition of materials and by continuous rolling. The finished surface shall not
vary by more than the specified tolerances. After the completion of final
rolling, retest the smoothness of the course. Immediately correct all humps
H. Patching: Remove and replace paving areas mixed with foreign materials
and defective areas. Cut-out such areas and fill with fresh, hot asphalt
concrete. Compact by rolling to maximum surface density and smoothness.
I. Protection: After final rolling, do not permit vehicular traffic on pavement until
it has cooled and hardened. Erect barricades to protect paving from traffic
until mixture has cooled enough not to become marked.
A. Dimensional Tolerances:
B. Test Sampling: For every 500 metric tones of asphaltic material produced,
the following tests will be performed by the Contractor through independent
testing laboratory.
E. Acceptance:
END OF SECTION