NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System
NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System
NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System
8 Use of Ladder Falling from height Operatives/ 3 4 12 Med 1) Only light work, off short duration and work in 1 4 4 Low Supervisor Site
(Ladder is not Staff/ ium which the operative can maintain secure hand Eng.
allowed to use and foot hold can be undertaken form a ladder Foreman,
daily basis but in 2) Never try to overreach with any ladders
certain cases 3) Check the ladder is of suitable quality for
where there is industrial use and is in good condition
very narrow 4) Maintain a minimum of 3 points of contact
place and even with stepladders at all times (feet/thighs/hands)
podium ladder If possible avoid the use of stepladders at a
not possible to working height of 2 meters and more.
fix in that cases Working on Uneven 5) Check the ladder legs (and stays) are fully
Ladder can use if ground deployed or locked (depending on type) to
permission maintain maximum base dimensions and the step
10 Use of power Damaged Operatives 3 4 12 Med 1. All portable electrical equipment must be PAT 1 4 4 Low Supervisor
tools such as Sockets &cable and staff ium tested and color coded. Make sure the test Foreman
Grinder/Cutter & insulation. dates are visible on the equipment. Site Eng.
Drill machine, Electrocution 2. Ensure all disk shall be appropriate and expiry
Electric shock date is over.
Short circuit & 3. Ensure all power tools are in good condition
Burns and appropriately maintained
Trip/Fall 4. PTW to be obtained, prior to commencing the
Noise task
Hearing loss 5. Damaged industrial sockets and power cables
Vibration must be removed.
12 Installation of Fire Fall from hand Installer 3 4 12 Med 1 Ensure Proper instruction from supervisor and 1 4 4 Low Site Engg
hose real with Dust Foreman act accordingly. Supervisor
cabinet and Noise 2 During manual operation most important is
assessor fittings by Foreman
Spark and Electric follow the load and size of the box and
manual handling
shock accordingly manpower will deploy to avoid fall
from hand.
3 Proper PPE specially using ear plug during
making hole in wall and using mask to avoid dust
4 All the power tools must be proper maintained
and inspected regular basis
5 No loose connection and all the socket must be
in good condition to avoid spark or electric shock
6 Ensure clean the area after work and there is no
debris.
13 Pressure testing Operation of valves Properties and 2 4 8 A valid permit for carrying out pressure 1 4 4 LOW
during the pressure other testing shall be arranged from the concerned
testing may cause surrounding department.
serious injury or
personnel A tool box talk meeting shall be conducted
fatality. and all the hazards to be recognized and
within the work
clearly communicated prior to start the work.
area All employees must be competent to do the
task.
Proper warning tapes and safety notices
indicating that flushing/pressure testing is in
progress shall be placed at site.
Warning notices and lock shall be provided
on the pump isolators and starters as
required.
The isolators to be locked and key shall be
keep with the responsible person involved in
the task.
All details shall be clearly mentioned on the
tag including contact number of the
responsible person.
Supervision shall frequently monitor the
testing/flushing.
The employee shall wear proper foot
protection.
Emergency contact number shall be
displayed.
Suitable fire extinguisher to be arranged near
1. Executing Steps:
1.1. Planning
a) Construction and HSE team must ensure that hazard identification is complete.
b) Construction and HSE team must prioritize the hazard issues, which are of significant in nature. (It means that risks have well
established legal requirements, potentially high risks).
c) Construction and HSE team to prepare the risk assessment plan for the priorities identified hazards for these potential high
risks.
Likely (4) 4 8 12 16 20
Almost
5 10 15 20 25
RISK LEVEL: Certain (5)