Petrochina International Jabung LTD.: Job Safety Analysis

This document provides a job safety analysis for trenching activities. It lists personal protective equipment required, including safety hats, gloves, boots, and identifies potential hazards and corresponding safe procedures. The analysis covers 4 steps: 1) ensuring teamwork and communication by holding pre-job meetings; 2) preparing documents, tools, and equipment while wearing gloves; 3) securing the work area with barricade tape and signs; and 4) carefully unloading 6-inch pipe from a trailer using stoppers and barricades to prevent pipes from falling. The supervisor must approve the secured work area before work begins.

Uploaded by

Yosua Situmorang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
193 views4 pages

Petrochina International Jabung LTD.: Job Safety Analysis

This document provides a job safety analysis for trenching activities. It lists personal protective equipment required, including safety hats, gloves, boots, and identifies potential hazards and corresponding safe procedures. The analysis covers 4 steps: 1) ensuring teamwork and communication by holding pre-job meetings; 2) preparing documents, tools, and equipment while wearing gloves; 3) securing the work area with barricade tape and signs; and 4) carefully unloading 6-inch pipe from a trailer using stoppers and barricades to prevent pipes from falling. The supervisor must approve the secured work area before work begins.

Uploaded by

Yosua Situmorang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

HSE-ICG/PCJ-3075-CA/JSA.

001
Date:
PetroChina International Jabung Ltd. Job Safety Analysis Tanggal :

Job: Trenching activity Title of person Analyzed by:


who does the job: Operator dan Rigger, Signalman,
Surveyor,

Work Crew Leader


Department : Section: Reviewed by: Approved by:
PT. IndoCipta Gemilang Construction Work Crew Supv: Area Supv: F/S Supv:

Construction Manager

Personal protective equipment (PPE) : Write down correct specifications of personal protective

Put on PPE required for a safe job. equipment required (Consult HSE Dept) :
1. Safety hat / helmet √ 6. Face shield 11. SCBA 16. Safety shoes / boots √
2. Safety glasses √ 7. Ear plugs / muffs 12. Gloves – Ordinary 17. Rubber boots
3. Goggles – ordinary √ 8. Dust mask 13.Gloves - Chemicals 18. Prot. Clothing /
Apron
4. Goggles – tinted 9. Air-purifying respirator 14. Gloves – Thermal 19. Body harnesses, L-
lenses line
5. Goggles – Chemicals 10. Air-line respirator 15. Rubber gloves 20. Life vest
Sequence of Basic Job Steps Potential Hazards Protective Equipment Safe Procedures
1) Team Work & Communication  Misscommunication  Pre – Job safety meeting
 Missunderstanding  Discuss JSA to workers before job
 Failure  Discuss emergency respons preparedness
to workers if emmergency situation
happen
 Good Communication with personel
 Everyone has permission to stop the job
 Melakukan rapat keselamatan sebelum
melakukan pekerjaan
 Kesalahan komunikasi
 Membicarakan JSA kepada pekerja
1) Kerjasama dan Komunikasi  Kesalahpahaman
sebelum bekerja
 Terjadi kegagalan
 Membicarakan tanggap darurat ke pekerja
jika terjadi situasi darurat
2) Prepare Document, Tools and  Pinch Point  Use hand Gloves  Be careful when pick up tools
Equipment  Miss Comunication  Every one must pay attention at all times
 Missunderstanding  Stay focused
 Failure  Ensure tools ready to use
 Ensure all document already accepted
and reviewed by PCI
2) Mempersiapkan dokumen dan alat –  Terjepit  Gunakan Sarung Tangan  Berhati – hati ketika mengambil
alat  Miskomunikasi peralatan
 Kesalahpahaman  Setiap orang harus memperhatikan
Page 1 of 4
 Terjadi Kegagalan pekerjaannya dan lingkungannya setiap
waktu
 Tetap fokus
 Memastikan semua peralatan siap untuk
digunakan
 Memastikan semua dokumen telah
disetujui dan dan ditinjau kembali oleh
pihak PCI
3) Secure area  Unauthorized personel  Barricade tape/safety line  Supervisor must know area for work
 Other activity in the same area  Warning sign  To ensure area safe for work
 Barricade area with tag line and give
warning sign for unauthorized personel
3)Mengamankan area kerja  Personil tidak berkepentingan  Garis barricade  Supervisor harus mengetahui area kerja
 Kegiatan lain di area kerja  Tanda bahaya yang akan dikerjakan
 Memastikan area kerja aman untuk
bekerja
 Barrikade area dengan garis barikade
dan tanda bahaya
4) Unloading material pipe 6” from trailler  Pipe fall  Stopper  Install stopper so the pipe are not lose
by long arm excavator  Sling broke up  Barricade and fall from trailler
 Trailler reversed  Hand gloves  Ensure unauthorized personel do not at
 Pinch by pipe work location
 Make sure sling refer to safe load
 Make sure hand position do not pinch
point
 Make sure position of trailler and
excavator on safe location
 Make sure the material is tied properly
 Ensure unloding pipe 6” is directed by
personel trainned
4) Menurunkan material pipa 6” dari  Kejatuhan material  Stopper  Pasang stopper pada pipa
Trailler menggunakan Long Arm  Sling putus  Barricade  Pastikan tidak ada pekerja yang tidak
Excavator  Terbalik  Sarung tangan berkepentingan
 Terjepit  Pastikan kekuatan sling aman untuk
digunakan dan tidak melebihi beban da
sudah dilakukan inspeksi oleh PCI
 Tangan tidak berada pada titik jepit
 Trailler dan Excavator diposisikan di
tempat aman dan rata dan keras
 Pastikan material terikat dengan benar
 Pastikan penurunan pipa 6” material
diarahkan oleh personel yang terlatih
 Gunakan tug line pada saat unloading

5) Stringging pipe 6” schedule 40 on its  Pinch of pipe  Hand Gloves  Make sure hand position do not under the
Page 2 of 4
psosition  Hit by pipe pipe
 Use wood to blocks to prop
 Wear hand gloves
 Ensure the workers are at safe distance
 Workers unauthorized are not allowed at
the construction area
5) Menempatkan pipa 6“ schedule 40 pada  Terjepit pipa  Sarung tangan  Pastikan posisi tangan tidak di bawah pipa
tempatnya  Tertimpa pipa  Gunakan balok kayu sebagai ganjal
 Gunakan sarung tangan
 Pekerja berada dalam jarak yang aman
 Pekerja yang tidak berkepentingan tidak
diperbolehkan berada di area kerja
 Pastikan tidak ada pekerja yang berada
didaerah line offire kecuali signal man
6) Working at Night  Poor illumination  Use Additional Lamp, Use  Ensure Additional lights are available
Standard PPE (Safety • Ensure availability of drinking water
 Injury person
Helm,safety glasses,coverall, • Ensure replacement of shift workers for
 Tripping night shifts
safety shoes), Enough Rest.
 Animal attack Availability Mineral Water

6) Pekerjan Pada Malam Hari  Penerangan yang buruk  Gunakan Lampu Tambahan,  Pastikan lampu tambahan tersedia
 Orang yang cedera Gunakan PPE standard • Pastikan ketersediaan air minum
 Tersandung (Helm,Kacamata, coverall, • Pastikan penggantian pekerja shift untuk
 Serangan binatang sepatu), istirahat yang cukup, shift malam
Tersedianya Air Mineral

7) Housekeeping  Garbage  Trash bag


 Scratched wood scraps / abrasions  Gloves
 Ensure there is no trash
 Ensure the worker use handgloves
Ensure work area is clean from trash.
Separate organic non-organic and
Dangerous goods waste
 Ensure that no workers are in the off-line
area except signal man

7) Merapikan area kerja  Sampah  Tempat Sampah  Pastikan tidak ada sampah
 Tergores sisa kayu /lecet  Sarung Tangan  Pastikan pekerja menggunakan sarung
tangan
 Pastikan area kerja bersih dari sampah
dan memisahkan sampah organic, non
organic dan B3.
Remarks: