Building Information Model in Project Management - Day #4
Building Information Model in Project Management - Day #4
in Project Management
Eng. Banan Aljumaiah
PMP, BIM-RICS
1. Introduction to BIM.
2. BIM Strategy.
3. Employer Information Requirements.
4. BIM Execution Plan & Master Information Delivery
Plan.
5. BIM Protocols.
7- BIM IN DESIGN
• What is mean of BIM in Design?
• 3D BIM is the most familiar form BIM, is the process of gathering
graphical and non-graphical information to build 3D .
1- 3D BIM Model
• Benefits of using 3D BIM :
1. Reduced the rework (less time and money spent on fixing the
errors in design stage before the construction takes place).
2- Clash detection • BIM modeling involves creating a comprehensive master model that
includes design models from different disciplines of engineering design.
• Clash detection process identifies where the independent models clash with
each other- finding where elements from one model overlap the elements of
models from other architect-engineering design disciplines.
8- BIM IN CONSTRUCTION
• 4D Building Information Modeling (4D BIM) is a process
to the intelligent linking of a 3D digital model with time
or schedule related information.
• This can positively impact the timeline of the project where the project planners are able to see how
assets come together sequentially and feedback any issues before the construction stage, creating
a safer working environment for site workers, and that can meet timelines and project deadlines.
1. Conflict detection.
2. Compare planned vs. actual
3. Improve planning with detailed modeling.
4. Greater Collaboration.
5. Reduce Risk in Construction.
6. Improved Quality Outcomes.
7. Time Saving.
8. Cost Saving.
9. Increase performance quality.
10. Improved Health and Safety.
• Using the right software – such as Navisworks Simulate or Manage, linked to Microsoft Project
or Primavera. Then press play and see the model appear in sequence.
• You can include site logistics and see where there are conflicts – for example between the
construction activity, materials deliveries and access routes.
• You can press play and see the building appear in sequence – the same function allows you
to visualise where the build should be at any point in the project timeline. This feature is
useful for confirming your supply chain’s adherence to the construction programme.
• Models can be used for Site Inductions to allow people to familiarise themselves with the site,
safely before they attend.
• Using BIM in construction stage has a benefit of controlling and managing the risk.
• Overview of 3D Laser Scanning
• Scan to BIM Services is a process of capturing scanned data from the real site conditions in the form of 3D
Model with the help of a scanner.
• It using for extract the accurate and precise construction information from as-built buildings.
Contractors gather on-site information with the help of 3D Laser scanners of their project, which helps
them to get accurate data that can be further be used in all the construction and planning process.
4. The software solution can be determining if any issues can be in the field.
5. The work tasks can be tracked, and progress monitored with checklists.
1. Inspection templates should be created based on the health and safety requirements checklists and
the project risks which require monitoring and mitigating.
2. providing all the information in one place makes the safety reporting easier.
1. All relevant stakeholders have access to the project data online or offline.
2. With all the project information in one place, it is easier to schedule the work-task for team
members.
1. Dashboards and custom reports can be created to monitor the key elements of a project as well
as for day-to-day information requirements.
• The transition needs to consider the transfer of operational data as well as training,
commissioning, handover and aftercare.
Thank You…