POST-TENSIONING FORMAT FOR PSC-GIRDER
(For Single End Stressing)
General Information:
Name & Location of Structure:
Span Reference: Girder Reference: Girder Length (m):
Girder Casting Date: Due Date of Stressing: Cable ref. to be Stressed : ----------- of ------
Actual Tensioning Date: Stressing stage: Jacking end ref: Dead end ref:
Design Information:
Dia of Strand (mm): Nos. of Strand/Cable: Anchorage UTS of Strand M of Elasticity, E (kn/mm2):
Brand: (Mpa):
Area of Strand A (mm2): Area of Cable (mm2): Des. Jack. force (kn): / kg
Design Elongation Design Gripp Actual Gripp length Corrected Elong for grip length,
(mm): length (mm): (mm): (mm):
Design Concrete strength at the Actual Concrete strength at the time of
Design Average Slip (mm):
time of Stressing (N/mm2): Tensioning (N/mm2):
Stressing & Jack Information:
Jack Model No & effecie. Pressure gauge Model : Tensioning RAM Area Blocking RAM Area
TA(cm2) : BA(cm2) :
Actual area of Strand, Modulus of Elasticity, E1 Corrected Elongation for actual AE (mm)
A1(mm2): (Kn/mm2): x (AxE/A1xE1):
Design Jack Pressure with Jack Calibrated Jack Pressure Initial Jacking Initial Reading for Marking at
loss (kg/cm2): (kg/cm2): Pressure: Jack end: Dead end:
Extra elongation for grip length 1 (mm): Applied Blocking Pressure
(kg/cm2):
Gross Slip of Cable at Jack End : Actual Slip of Cable at Jack end (mm) :
(Final elong.- C.Elong. Remain): (Gross slip- extra elong. 1):
Record of Stressing & Elongation:
Actual Observed Reading Reading Elongation Pull-in Net Elongation Final
Gauge /Gauge for at Dead measured measured Elongation correction for Elongation
Pressue Reading Elonga. end at Jacking at Dead at Jack end Initial force at Jack end
kg/cm2 kg/cm2 (mm) (mm) end (mm) end (mm) (mm) (mm) in (mm)
Col (1) Col (2) Col (3) Col (4) Col (5) Col (6) Col (7)=5-6 Col (8) Col (9)= (7+8)
Remarks (if any) :
Clint’s Representative Consultant's Representative Contractor's Representative
Elongation correction col.(8) for initial force to marking and removing initial cable slack shall be computed by linear interpolation.
Before starting of stressing operation ensure that all pre-stressing equipment are in order and concrete has attained required strength.
Due to Jack loss include extra force to the design Jacking force during the application of jacking force.
.