Condition Mon Tool - 2008
Condition Mon Tool - 2008
Information
Technology Product and Service Offerings
Jon Greiner
Connected Worksite Division
Agenda
On Board
Current VIMS
– Upgrades, Retrofits
Future VIMS
– 3G
Off Board
VIMS Office
Dealer’s Condition Monitoring Services
Predictive Analysis Services
Haulage Optimization
What Can Your Equipment Tell You?
On-Board System
Collects Data
Monitors
Machine Events
Stores
Information
Communicates
Off-Board System
VIMSpc VIMS Supervisor
Single-machine Solution Fleet Management Solution
VIMS File Types
Machines Utilizing VIMS
Mining Trucks Wheel Loaders/ Dozers
797 994
793 992
789 854
785
777 (attachment)
Mining Shovels
775 (attachment) 5130
773 (attachment) 5230
Track Tractors(VIDS)
D10
D11
VIMS On-board Systems
Onboard Hardware Versions
68k Hardware – Older version of hardware
with service and telemetry ports only
ABL Hardware – Current production hardware
with service, telemetry, and CAN ports
(added to allow wireless file downloads)
A4N Hardware – Next generation production
hardware with service, telemetry, CAN and
ethernet ports
VIMS Status
Version 10.5 Released – January 2007
Key features
– Corrected inaccurate payload on 797
with improperly adjusted strut
– Corrected histogram overflow prior to
recommended reset value
– Improved scoreboard response time
– Engine over-speed events now align with
ECM events
– Engine shutdown events modified to
coincide with elevated idle ranges
VIMS Status (con’t.)
Version 10.5 Released – January 2007
Conditional datalogger available
on LWL’s
Alignment of 994F/992G SMH with
ECM diagnostic hours
VIMS TMPH/TKPH available on
all large truck models
VIMS Status (con’t.)
Version 10.52 Under Development –
April 2008 Release
Changes
– High altitude exhaust temp snapshot events
– High altitude derate events
– 793/797 scoreboard issue
– Corrected LWL payload full not downloading
– 776D strut flat line correction
– LWL payload data retention issue
– 992G steering lock, parking brake, tilt rod
pressure issues
VIMS Status (con’t.)
Version 11.0 and Advisor Update
777F Phase 1 software update
in production
– 777F Phase 2 Beta software finished –
TPG test underway
– 993K update in production
– 773F/775F Phase 1 software under
development – includes 777F Phase 1 fixes,
Software Enabled Attachments and payload fix
– 777F Advisor software under development
Basic VIMS System
CAT DATA LINK
ET ET SERVICE
ED
F ACB
PORT
GHI
SERVICE
PORT
VIMS CAN PORT A
C
VIMSpc ABL
LAPTOP PC
VIMS
Supervisor
BROADCAST PORT
(TELEMETRY)
VIMS System (With Product Link)
ENGINE
LAPTOP PC
ET
VIMSpc
ET SERVICE
SERVICE PORT ED
F ACB TRANSMISSION
PORT GHI
VIMS
ABL
B
CAT
A
C
DATA LINK
IMPLEMENT
BROADCAST PORT
(TELEMETRY) C
PC
CMS, Predictive Analysis,
MQ Solution Dealer MineStar Health
Communicator Features
Provides Connectivity for Broadband Wireless
Solutions for VIMS
Handles VIMS Files Including Dataloggers
Triggers Datalogger Through an Internal Scheduler
Scheduler Managed Through a Web Interface
Pushes Files Offboard When Radio Connectivity
is Established
– Good for Poor Coverage and Hotspot Applications
Highly Reliable File Transfer
Provides Channel Polling for Up to 6 Channels
MQ Solution
File Transfer and Management
Software Application
Web Based
Can Transfer Files From One Location
to Multiple Other Locations/Addresses
Schedules File Transfer
Tracks Scheduled File Transfers
Reports Exceptions
VIMS Guardian
ET SERVICE
SERVICE PORT ED
F AC B TRANSMISSION
PORT GHI
B
CAT
A
C
DATA LINK
CAN PORT
Currently VIMS
Track type IMPLEMENT
BROADCAST PORT tractors
GUARDIAN
Available (TELEMETRY)
D11, D10, D9
68k to ABL Retrofit
Currently
available ET
CAT DATA LINK
ET SERVICE
SERVICE
equipped PORT
VIMS CAN PORT A
C
ABL
trucks* VIMSpc
LAPTOP PC
Refer to
IRM PELJ0370
and BROADCAST PORT
(TELEMETRY)
Special
Instruction * 789 VIMS config
being finalized now
REHS2142
777D VIMS Retrofit Kit
Similar to VIMS on Large Mining Trucks
Available November 2006
Two Versions Available
– For Trucks With TPMS Attachment
– For Trucks Without TPMS Attachment
Approximately 25 Kits Installed and
Running To Date
VIMS Support Materials
VIMS Resource Kit – AEXC0682
– Customizable PowerPoint Presentation
– Marketing Brochure
– SalesGrams and Info Sheets
– Answers to Frequently Asked Questions
– VIMS Case Studies – Value Stories
– Library of Images and Illustrations
VIMS Simulator – SERV7041
VIMS Application Guide – SELD7001
Future On-Board
Information Monitoring
Technology
VIMS 3G
Future On-board System
VIMS Onboard Hardware Versions
68k Hardware
– Older version of hardware with service
and telemetry ports only
ABL Hardware V IMSwith service,
– Current production hardware
telemetry, and CAN ports 3 G
– Added to allow wireless file downloads
A4N Hardware
– Next generation production hardware with
service, telemetry, CAN, and ethernet ports
797F/793F VIMS System
VIMS 3G
ECM’s
Predictive Analysis
Module (A4:N2)
Information Monitoring
Distribution Strategy
Customer
Dealer Dealer/Cat
Basic Advanced Svcs Premium Svcs
Off-board Data Source Equipment Advanced
—SOS, etc. Management Diagnostics/Prognostics
On-board data provided process w/Intellectual Property
by machine implementation Option to Provide
Customer uses at his Health solution through Advanced Service
discretion Dealers Support to Less Capable
Customized Reports Dealers
Advanced Tools Not
Dealer drive to Available to Customers
participate in value
Diagnostic Drill Down
added services Capability
VIMS 3G Features
Location Flexible Histograms
Hours Standard Snapshots
Geo-Fencing Continuous Data Logger
Events VIMS Trends
Total Fuel Consumption Abuse Monitoring
Fuel Level Percentage Flexible Events
Scheduled Reporting Distributed Trends
Event Chronological List Flexible Trends
Event Active List Flexible Data Logging
Totals-Configurable Flexible Snapshots
VIMS Histograms Tire Monitoring – TMPH/TKPH
Standard Data Logger Road Analysis Control – RAC
Distributed Totals Payload Control System – PCS
Resettable Totals Truck Payload Mgt. System
Distributed Histograms Haulage Optimization
Machine Start/Stop Time Predictive Analysis Service
VIMS 3G Features
g e 1 Location Flexible Histograms
a
Pack Hours Standard Snapshots
Geo-Fencing Continuous Data Logger
Events VIMS Trends
Total Fuel Consumption Abuse Monitoring
Fuel Level Percentage Flexible Events
Scheduled Reporting Distributed Trends
Event Chronological List Flexible Trends
Event Active List Flexible Data Logging
Totals-Configurable Flexible Snapshots
VIMS Histograms Tire Monitoring – TMPH/TKPH
Standard Data Logger Road Analysis Control – RAC
Distributed Totals Payload Control System – PCS
Resettable Totals Truck Payload Mgt. System
Distributed Histograms Haulage Optimization
Machine Start/Stop Time Predictive Analysis Service
VIMS 3G Features
g e 2 Location Flexible Histograms
a
Pack Hours Standard Snapshots
Geo-Fencing Continuous Data Logger
Events VIMS Trends
Total Fuel Consumption Abuse Monitoring
Fuel Level Percentage Flexible Events
Scheduled Reporting Distributed Trends
Event Chronological List Flexible Trends
Event Active List Flexible Data Logging
Totals-Configurable Flexible Snapshots
VIMS Histograms Tire Monitoring – TMPH/TKPH
Standard Data Logger Road Analysis Control – RAC
Distributed Totals Payload Control System – PCS
Resettable Totals Truck Payload Mgt. System
Distributed Histograms Haulage Optimization
Machine Start/Stop Time Predictive Analysis Service
VIMS 3G Features
g e 3 Location Flexible Histograms
a
Pack Hours Standard Snapshots
Geo-Fencing Continuous Data Logger
Events VIMS Trends
Total Fuel Consumption Abuse Monitoring
Fuel Level Percentage Flexible Events
Scheduled Reporting Distributed Trends
Event Chronological List Flexible Trends
Event Active List Flexible Data Logging
Totals-Configurable Flexible Snapshots
VIMS Histograms Tire Monitoring – TMPH/TKPH
Standard Data Logger Road Analysis Control – RAC
Distributed Totals Payload Control System – PCS
Resettable Totals Truck Payload Mgt. System
Distributed Histograms Haulage Optimization
Machine Start/Stop Time Predictive Analysis Service
VIMS 3G Features
g e 4 Location Flexible Histograms
a
Pack Hours Standard Snapshots
Geo-Fencing Continuous Data Logger
Events VIMS Trends
Total Fuel Consumption Abuse Monitoring
Fuel Level Percentage Flexible Events
Scheduled Reporting Distributed Trends
Event Chronological List Flexible Trends
Event Active List Flexible Data Logging
Totals-Configurable Flexible Snapshots
VIMS Histograms Tire Monitoring – TMPH/TKPH
Standard Data Logger Road Analysis Control – RAC
Distributed Totals Payload Control System – PCS
Resettable Totals Truck Payload Mgt. System
Distributed Histograms Haulage Optimization
Machine Start/Stop Time Predictive Analysis Service
VIMS 3G Features
g e 5 Location Flexible Histograms
a
Pack Hours Standard Snapshots
Geo-Fencing Continuous Data Logger
Events VIMS Trends
Total Fuel Consumption Abuse Monitoring
Fuel Level Percentage Flexible Events
Scheduled Reporting Distributed Trends
Event Chronological List Flexible Trends
Event Active List Flexible Data Logging
Totals-Configurable Flexible Snapshots
VIMS Histograms Tire Monitoring – TMPH/TKPH
Standard Data Logger Road Analysis Control – RAC
Distributed Totals Payload Control System – PCS
Resettable Totals Truck Payload Mgt. System
Distributed Histograms Haulage Optimization
Machine Start/Stop Time Predictive Analysis Service
VIMS 3G Features
g e 6 Location Flexible Histograms
a
Pack Hours Standard Snapshots
Geo-Fencing Continuous Data Logger
Events VIMS Trends
Total Fuel Consumption Abuse Monitoring
Fuel Level Percentage Flexible Events
Scheduled Reporting Distributed Trends
Event Chronological List Flexible Trends
Event Active List Flexible Data Logging
Totals-Configurable Flexible Snapshots
VIMS Histograms Tire Monitoring – TMPH/TKPH
Standard Data Logger Road Analysis Control – RAC
Distributed Totals Payload Control System – PCS
Resettable Totals Truck Payload Mgt. System
Distributed Histograms Haulage Optimization
Machine Start/Stop Time Predictive Analysis Service
VIMS 3G Features
Location Flexible Histograms
Hours Standard Snapshots
Geo-Fencing Continuous Data Logger
Events VIMS Trends
Total Fuel Consumption Abuse Monitoring
Fuel Level Percentage Flexible Events
Scheduled Reporting Distributed Trends
Event Chronological List Flexible Trends
Event Active List Flexible Data Logging
Totals-Configurable Flexible Snapshots
VIMS Histograms Tire Monitoring – TMPH/TKPH
Standard Data Logger Road Analysis Control – RAC
Distributed Totals Payload Control System – PCS
Resettable Totals Truck Payload Mgt. System
D V A N CED
Distributed Histograms Haulage Optimization A ERVICES
S
Machine Start/Stop Time Predictive Analysis Service
VIMS 3G Connectivity
MineStar Fleet Satellite
Commander/Health
Cellular Radios
Third Party Back
Office Systems Broadband Radios
– Modular Mining
Systems Communicator
Functionality
Electronic
Technician – ET – File Push
Create a model
Real-time Gather actual data
Sensor Data Boost
Run data against model Statistical
EGT
Identify anomalies Deviation
RPM
Detection
Analyze results
Oil Determine repair Determines
recommendations
Pressure
If Operation
Is Abnormal
Predictive Analysis
Module (A4:N2)
Haulage
Optimization
What is Haulage Optimization?
GPS
Embedded technology