50% found this document useful (2 votes)
1K views

Sieve Analysis of Coarse Aggregates For Concrete

The document provides the results of a sieve analysis test conducted on coarse aggregates, fine aggregates, and an all-in aggregate sample from a source in Ulwe for a concrete mix. The test was conducted according to Indian Standards and evaluated the samples against the specification limits. The gradation of the coarse and fine aggregates and all-in aggregate mixture were found to be within the specified limits for use in concrete.

Uploaded by

ajit karandikar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
1K views

Sieve Analysis of Coarse Aggregates For Concrete

The document provides the results of a sieve analysis test conducted on coarse aggregates, fine aggregates, and an all-in aggregate sample from a source in Ulwe for a concrete mix. The test was conducted according to Indian Standards and evaluated the samples against the specification limits. The gradation of the coarse and fine aggregates and all-in aggregate mixture were found to be within the specified limits for use in concrete.

Uploaded by

ajit karandikar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

CITY INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LTD.

SIEVE ANALYSIS OF COARSE AGGREGATES FOR CONCRETE


(As per IS:2386 - Part 1)

Location/Source: Sampling date:

Description: Testing date :

Proposed use: Tested by:

Wt.of Sample = _____________gms

Specification Limits as per


IS Sieve Size in Wt. Retained % Cumulative IS : 383 - 1970
% Retained % passing
'mm' (gms) Retained
40 mm 20 mm 10 mm

63.00 100 100 100

40.00 85 - 100 100 100

20.00 0 - 20 85 - 100 100

12.50 - - 100

10.00 0-5 0 - 20 85 - 100

4.75 - 0-5 0 - 20

2.36 - - 0-5

Pan - - -

Remarks:
CITY INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LTD.

NAME OF WORK : Construction of 1X100m obligatory span crossing over C R tracks at Taloja Railway Station For
Navi Mumbai Metro Line- 1 Project.

CONTRACTOR : J Kumar Infraprojects Ltd.


GENERAL CONSULTANT : Louis Berger Group

SIEVE ANALYSIS OF COARSE AGGREGATES FOR CONCRETE


(As per IS:2386 - Part 1)

Location/Source: Ulwe-J Kumar Sampling date: 23-10-2019


Description: 20mm Testing date : 23-10-2019

Proposed use: Concrete Tested by: Jointly

Wt.of Sample = 5871 gms

Specification Limits as per


IS Sieve Size in Wt. Retained % Cumulative IS : 383 - 1970
% Retained % passing
'mm' (gms) Retained
40 mm 20 mm 10 mm

63.00 0 0 0 100 100 100 100

40.00 0 0 0 100 85 - 100 100 100

20.00 582 9.91 9.91 90.09 0 - 20 85 - 100 100

12.50 0 0.00 0.00 0 - - 100

10.00 5141 87.57 97.48 2.52 0-5 0 - 20 85 - 100

4.75 134 2.28 99.76 0.24 - 0-5 0 - 20

2.36 0 0.00 0.00 0.00 - - 0-5

Pan 14 0.24 100.00 0 - - -

Remarks:Gradation has been done at J Kumar HN3 RMC Plant , Jasai

Contractor's Representative GC Representative


CITY INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LTD.

NAME OF WORK : Construction of 1X100m obligatory span crossing over C R tracks at Taloja Railway Station For
Navi Mumbai Metro Line- 1 Project.

CONTRACTOR : J Kumar Infraprojects Ltd.


GENERAL CONSULTANT : Louis Berger Group

SIEVE ANALYSIS OF FINE AGGREGATES FOR CONCRETE


(As per IS:2386 - Part 1)

Location/Source: Ulwe-J Kumar Sampling date: 23-10-2019

Description: Crushed Sand Testing date : 23-10-2019

Proposed use: Concrete Tested by: Jointly

Wt.of Sample = _ 1278 gms

Specification Limits as per IS :


IS Sieve Size in Wt. Retained % Cumulative 383 - 1970
% Retained % passing
'mm' (gms) Retained
Zone I Zone II Zone III

10.00 0 0 0 100 100 100 100

4.75 87 6.81 6.81 93.19 90 - 100 90 - 100 90 - 100

2.36 116 9.08 15.88 84.12 60 - 95 75 - 100 85 - 100

1.18 167 13.07 28.95 71.05 30 - 70 55 - 90 75 - 100

0.600 328 25.67 54.62 45.38 15 - 34 35 - 59 60 - 79

0.300 271 21.21 75.82 24.18 5 - 20 8 - 30 12 - 40

0.150 154 12.05 87.87 12.13 0-20 0-20 0-20

0.075 90 7.04 94.91 5.09

Pan 65 5.09 100.00 0.00

Fineness Modulus : 2.70

Remarks:

Contractor's Representative GC's Representative


CITY INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LTD.

NAME OF WORK : Construction of 1x100m Obligatory span crossing over C R tracks at Taloja railway Station For Navi Mumbai Metro Line- 1
Project.

CONTRACTOR : J Kumar Infraprojects Ltd.


GENERAL CONSULTANT : Louis Berger Group

(AS PER IS - 383)

Location/Source: Ulwe-J Kumar Sampling Date: 23-10-2019

Description: All in Aggregate Testing Date : 23-10-2019


Proposed use: Concrete Tested By: Jointly

IS Sieve % PASSING CUM %


LIMITS
PASSING
size in ALL IN
20 MM 10 MM R/SAND C/SAND 20 MM 10 MM R/SAND C/SAND
'mm' AGG.
100% 100% 0% 100% 28.00% 28.00% 0.00% 44.00% LOWER UPPER

40 100.00 100.00 0.00 100.00 28.00 28.00 0.00 44.00 100.00 100 100
20 90.09 0.00 0.00 100.00 25.22 0.00 0.00 44.00 69.22 95 100
4.75 0.24 0.00 0.00 93.19 0.07 0.00 0.00 41.00 41.07 30 50
0.6 0.00 0.00 0.00 45.38 0.00 0.00 0.00 19.97 19.97 10 35
0.15 0.00 0.00 0.00 12.13 0.00 0.00 0.00 5.34 5.34 0 6

COMBINED GRADATION OF CA &FA


100

90

80

70 Column J
Column K
%PASSING

60
Column L
50

40

30

20

10

0
0.1 1 SIEVE SIZE 10 100

REMARKS: Maximum nominal size of aggregate is 20mm.

Contractor's Representative GC Representative

You might also like