Design Acceptance Report Format

This design acceptance report documents the acceptance of an equipment design between a supplier and Valeo. It includes sections to assess the mechanics, energy, documentation, and environmental impact of the design. Representatives from the supplier, Valeo project management, and other Valeo departments attended and reviewed the design based on predefined criteria. Any reserves or issues to be corrected were documented along with responsibilities and due dates. The design was either accepted, accepted with reserves, or refused based on the outcome of the review.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
195 views3 pages

Design Acceptance Report Format

This design acceptance report documents the acceptance of an equipment design between a supplier and Valeo. It includes sections to assess the mechanics, energy, documentation, and environmental impact of the design. Representatives from the supplier, Valeo project management, and other Valeo departments attended and reviewed the design based on predefined criteria. Any reserves or issues to be corrected were documented along with responsibilities and due dates. The design was either accepted, accepted with reserves, or refused based on the outcome of the review.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

DESIGN ACCEPTANCE REPORT

N° cP1-3-070-PR1-01 – Indice -

DESIGN ACCEPTANCE REPORT

Planned date for Acceptance : .............................................................................

Actual date of Acceptance : .................................................................................

Place : ......................................................................................................................

Equipment Designation : .......................................................................................

Supplier : ................................................................................................................

Purchase Order Number :.....................................................................................

Attendees

SUPPLIER VALEO
Name Function/Title Name Function/Title

Supplier Project Manager Other attendees


VALEO APU, Process, Maintenance

Page : 1/3
DESIGN ACCEPTANCE REPORT
N° cP1-3-070-PR1-01 – Indice -

DESIGN ACCEPTANCE REPORT

Target Assessment N/A A T/C R Remarks


A1 – Mechanics
General Layout
Assembly drawings of equipment
Assembly drawings of tooling
Accessibility of each function
Access for operators
Feeding of components
Safety for people
Safety for equipment
B1 – Energy
Safety for people
Safety for equipment
Electrical drawings and schematics
Pneumatic drawings and schematics
Hydraulic drawings and schematics
Management of emergency stops
Management of the access doors
Electrical consomption
Air consomption
Other consomption
C1 – Documentation
Ergonomics analysis
Machine Times studies
Operators Times studies (Direct Labor)
Operators motions studies
Flow analysis for components
Functional analysis
Organic analysis
Equipment/machine FMEA
Risk and Safety analysis
VPS checklist
D1 – Environment
Discharges and waste generated
Products used on the equipment
Potential environmental accident
Administrative authorization needed

N/A Not Applicable A Accepted T/C To Correct R Refused

Supplier Project Manager Other attendees


VALEO APU, Process, Maintenance

Page : 2/3
DESIGN ACCEPTANCE REPORT
N° cP1-3-070-PR1-01 – Indice -

DESIGN ACCEPTANCE REPORT

Equipment Designation: .......................................................................................

Supplier: .................................................................................................................

Purchase Order Number: ....................................................................................

RESERVES for ACCEPTANCE

RESERVES ACTIONS PILOT DUE OBSERVATIONS


DATE

Design Acceptance ACCEPTED


Authorization to launch manufacturing on: ../../..
Design Acceptance accepted WITH EXPRESS RESERVES to be corrected as listed above
Authorization to launch manufacturing on: ../../..
Design Acceptance REFUSED
Other review for Acceptance planned on : ../../..

Fournisseur Chef de Projet Process Autre intervenant


VALEO TRANSMISSIONS UAP, Méthodes, Maintenance

Page : 3/3