(1) This material approval sheet is for the dualization of the Barka-Nakhal Road project under Contract 3/2014 with Contractor Galfar Engineering & Contracting SAOG. (2) It provides details of a material for use on the project such as the manufacturer, specifications, and place of origin to obtain approval from the Engineer and Employer. (3) Upon signature, the Engineer and Employer can approve, approve with comments, or reject the material.

Uploaded by

muneerpmh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
210 views1 page

Material Approval Request - Final

(1) This material approval sheet is for the dualization of the Barka-Nakhal Road project under Contract 3/2014 with Contractor Galfar Engineering & Contracting SAOG. (2) It provides details of a material for use on the project such as the manufacturer, specifications, and place of origin to obtain approval from the Engineer and Employer. (3) Upon signature, the Engineer and Employer can approve, approve with comments, or reject the material.

Uploaded by

muneerpmh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MATERIAL APPROVAL SHEET (MAS)

MAS No. :
PROJECT: Dualization of Barka - Nakhal Road
CONTRACT No.: 3/2014
CONTRACTOR : Galfar Engineering & Contracting SAOG
Material Description :
BOQ Ref. :
Spec Ref. :
Drawing Ref. :
Location of Use :
Time required at site : Delivery Duration:
Specified Proposed
Manufacturer
Supplier
Place of Origin
Size / Capacity / Duty
IS Ref.
Finish / Colour
Enclosures Literature Drawing Sample Certificate BOQ Extract Other
Additional Information / Notice of Cost Variation

Signature: Date:

(IN CASE PRODUCT RECOMMENDED IS NON-OMANI) Give Reason


We confirm that there is no local manufacturer available for the proposed product, and no alternative local product can meet the
requirements specified in the Contract Documents.

For Galfar Engineering & Contracting SAOG

Signature: Date:

APPROVED BY COMMENTS
For Engineer
(Renardet SA & Partners)

Signature: Date:
STATUS (tick) Recommended for Approval Recommended with Comments Rejected

For Employer
MINISTRY OF TRANSPORT & COMMUNICATIONS
Directorate General of Roads and Land Transport

Signature: Date:
STATUS (tick) Approved Approved with comments Not Approved
The above approval is intended as verification of compliance of the proposed materials with the specification requirements only.
This approval will not relieve the Contractor of any of his contractual obligations.