0% found this document useful (0 votes)
34 views

Measured: 12.3 %: 12.3 % Initial Initial: 1.4 %: 1.4 %

This pie chart shows the stages of a Devops project. The majority, 69.9%, of the project is currently in the defined stage. Managed processes make up 16.4% while only 12.3% of the project has been measured and a tiny portion, 1.4%, is in the initial stage.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

Measured: 12.3 %: 12.3 % Initial Initial: 1.4 %: 1.4 %

This pie chart shows the stages of a Devops project. The majority, 69.9%, of the project is currently in the defined stage. Managed processes make up 16.4% while only 12.3% of the project has been measured and a tiny portion, 1.4%, is in the initial stage.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DevopsMeter Pie chart - project

Initial: 1.4 %

Measured: 12.3 % Initial: 1.4 %

Measured: 12.3 %

Managed: 16.4 %

Managed: 16.4 %

Defined: 69.9 %

Defined: 69.9 %

Highcharts.com

You might also like