Bar Bending Schedule For Office Building

This document provides a bar bending schedule for a district technical office building project located in Doti, Nepal. It lists the rebar requirements for various structural elements including foundations, columns, and footings. The schedule specifies the diameter, number of bars, length, and weight of rebar needed for each part of the building. A total of 3,874.59 kg of 16 mm rebar is required for foundations. The column schedule then breaks down the rebar specifications for three sample columns, including bar sizes, quantities, and lengths required at different heights of each column.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
313 views26 pages

Bar Bending Schedule For Office Building

This document provides a bar bending schedule for a district technical office building project located in Doti, Nepal. It lists the rebar requirements for various structural elements including foundations, columns, and footings. The schedule specifies the diameter, number of bars, length, and weight of rebar needed for each part of the building. A total of 3,874.59 kg of 16 mm rebar is required for foundations. The column schedule then breaks down the rebar specifications for three sample columns, including bar sizes, quantities, and lengths required at different heights of each column.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 26

Project: Building of District Technical Office

Beam Consultant Pvt. Ltd. Page No: 1 of 1


Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
A Foundation pad rebar
Footing F1 16 2 38 76 9.91 - - - 362.34 - -
Footing F2 16 2 33 66 8.66 - - - 274.98 - -
Footing F3 16 4 35 140 9.16 - - - 616.96 - -
Footing F4 16 2 28 56 9.66 - - - 260.25 - -
Footing F5 16 2 26 52 8.91 - - - 222.90 - -
Footing F6 16 6 25 150 8.66 - - - 624.95 - -
Footing F7 16 6 23 138 7.91 - - - 525.16 - -
Footing F8 16 2 13 26 6.91 - - - 86.43 - -
Footing F9 16 4 12 48 39.00 - - - 900.61 - -

A FOUNDATION REBAR 0.00 0.00 0.00 3874.59 0.00 0.00 3874.59

B Column
1 Col C1 5 nos - - - - - - -
Bar 1 upto First Floor 25 5 4 20 25.00 - - - - - 587.35
Bar 1 upto Third Floor 20 5 4 20 27.00 - - - - 405.99 -
Bar 1 terminated 20 5 4 20 12.50 - - - - 187.96 -
Bar 2 upto Ground Floor 25 5 4 20 14.50 - - - - - 340.66
Bar 2 upto Second Floor 20 5 4 20 27.00 - - - - 405.99 -
Bar 2 terminated 16 5 4 20 22.00 - - - 211.68 - -
Bar 3 upto First Floor 20 5 2 10 25.00 - - - - 187.96 -
Bar 3 upto Third Floor 20 5 2 10 25.00 - - - - 187.96 -
Bar 3 terminated 16 5 2 10 11.50 - - - 55.33 - -
Bar 4 upto Ground Floor 20 5 2 10 14.50 - - - - 109.02 -
Bar 4 upto Second Floor 20 5 2 10 25.00 - - - - 187.96 -
Bar 4 terminated 16 5 2 10 22.00 - - - 105.84 - -
stirrup 1 8 5 123 615 4.99 369.57 - - - - -
stirrup 2 8 5 123 615 3.83 283.66 - - - - -
stirrup 3 8 5 123 615 3.83 283.66 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 2 of 2
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

2 Col C2 5 nos - - - - - - -
Bar 1 upto Ground Floor 25 5 4 20 19.00 - - - - - 446.38
Bar 1 upto Second Floor 20 5 4 20 26.00 - - - - 390.95 -
Bar 1 terminated 16 5 4 20 19.50 - - - 187.63 - -
Bar 2 upto First Floor 20 5 4 20 25.00 - - - - 375.91 -
Bar 2 upto Third Floor 16 5 4 20 25.00 - - - 240.55 - -
Bar 2 terminated 16 5 4 20 11.50 - - - 110.65 - -
Bar 3 upto Ground Floor 20 5 4 20 14.50 - - - - 218.03 -
Bar 3 upto Second Floor 20 5 4 20 25.00 - - - - 375.91 -
Bar 3 terminated 16 5 4 20 22.00 - - - 211.68 - -
stirrup 1 8 5 123 615 4.99 369.57 - - - - -
stirrup 2 8 5 123 615 3.83 283.66 - - - - -
stirrup 3 8 5 123 615 3.83 283.66 - - - - -

3 Col C3 2 nos - - - - - - -
Bar 1 upto First Floor 20 2 4 8 25.00 - - - - 150.37 -
Bar 1 upto Third Floor 16 2 4 8 24.00 - - - 92.37 - -
Bar 1 terminated 16 2 4 8 11.50 - - - 44.26 - -
Bar 2 upto Ground Floor 20 2 8 16 14.50 - - - - 174.42 -
Bar 2 upto Second Floor 16 2 8 16 24.00 - - - 184.74 - -
Bar 2 terminated 12 2 8 16 22.00 - - 95.30 - - -
stirrup 1 8 2 123 246 4.99 147.83 - - - - -
stirrup 2 8 2 123 246 3.83 113.46 - - - - -
stirrup 3 8 2 123 246 3.83 113.46 - - - - -

4 Col C3 3 nos - - - - - - -
Bar 1 upto First Floor 20 3 4 12 25.00 - - - - 225.55 -
Bar 1 terminated 16 3 4 12 22.00 - - - 127.01 - -
Bar 2 upto Ground Floor 20 3 8 24 14.50 - - - - 261.64 -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 3 of 3
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Bar 2 upto Second Floor 16 3 8 24 24.00 - - - 277.11 - -
Bar 2 terminated 12 3 8 24 11.50 - - 74.72 - - -
stirrup 1 8 3 97 291 4.99 174.87 - - - - -
stirrup 2 8 3 97 291 3.83 134.22 - - - - -
stirrup 3 8 3 97 291 3.83 134.22 - - - - -

B TOTAL COLUMN REBAR 2691.85 0.00 170.02 1848.86 3845.61 1374.39 9930.72

C STAIRCASE
C1 StairCase at Ground Floor
1 Flight 1
main bar 12 1 9 9 22.41 - - 54.60 - - -
12 1 9 9 9.41 - - 22.93 - - -
12 1 9 9 10.66 - - 25.97 - - -
distribution bar 8 1 24 24 4.50 13.01 - - - - -
distribution bar 8 1 14 14 4.50 7.59 - - - - -
distribution bar 8 1 6 6 4.50 3.25 - - - - -
nosing bar 10 1 9 9 4.50 - 7.62 - - - -
step bars 8 9 4 36 2.66 11.53 - - - - -

2 Landing - - - - - - - -
main bar at gap 12 2 2 4 6.91 - - 7.48 - - -
distribution bar 10 2 13 26 12.41 - 60.70 - - - -

3 Flight 2
main bar 12 1 9 9 23.66 - - 57.65 - - -
12 1 9 9 10.66 - - 25.97 - - -
12 1 9 9 10.66 - - 25.97 - - -
distribution bar 8 1 25 25 4.50 13.55 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 4 of 4
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
distribution bar 8 1 6 6 4.50 3.25 - - - - -
distribution bar 8 1 15 15 4.50 8.13 - - - - -
nosing bar 10 1 9 9 4.50 - 7.62 - - - -
step bars 8 9 4 36 2.66 11.53 - - - - -

Sub Total for Staircase at Ground Floor 71.84 75.93 220.59 0.00 0.00 0.00

Staircase for first and second floor 2 143.67 151.86 441.17 0.00 0.00 0.00
C TOTAL for STAIRCASE 215.51 227.80 661.76 0.00 0.00 0.00 1105.07
- - - - - - - -
D BEAMS
D.1 Tie Bam( 9"x6") - - - - - - - -
1 at A-A - - - - - - - -
Bottom bars 12 1 4 4 257.00 - - 278.31 - - -
Top Bars - - -
Stirrups 8 1 505 505 3.58 217.72 - - - - -

2 at B-B, C-C & D-D - - - - - - - -


Bottom bars 12 6 2 12 42.50 - - 138.07 - - -
ld 16 6 2 12 2.25 - - - 12.99 - -
Top Bars 12 6 2 12 42.50 - - 138.07 - - -
ld 12 6 2 12 2.25 - - 7.31 - - -
Stirrups 8 6 72 432 2.99 155.55 - - - - -

3 at 1-1 - - - - - - - -
Bottom bars 12 2 2 4 30.50 - - 33.03 - - -
Top Bars 12 2 2 4 30.50 - - 33.03 - - -
Stirrups 8 2 48 96 2.99 34.57 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 5 of 5
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
4 at 2-2,3-3 & 4-4 - - - - - - - -
Bottom bars 12 6 2 12 46.50 - - 151.07 - - -
ld 16 6 2 12 2.25 - - - 12.99 - -
Top Bars 12 6 2 12 46.50 - - 151.07 - - -
ld 12 6 2 12 2.25 - - 7.31 - - -
Stirrups 8 6 80 480 2.99 172.84 - - - - -

D.2 BEAM at GF lvl +10'-0" - - - - - - - -


1 Grid A-A - - - - - - - -
Bottom bars 20 1 2 2 35.50 - - - - 53.38 -
Top Bars 20 1 2 2 35.50 - - - - 53.38 -
extra top bars at 4 20 1 1 1 7.25 - - - - 5.45 -
at 3 20 1 1 1 11.49 - - - - 8.64 -
at 2 20 1 1 1 9.25 - - - - 6.95 -
Stirrups 8 1 70 70 4.99 42.07 - - - - -

2 Beam B-B - - - - - - - -
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 6 of 6
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

3 Beam C-C - - - - - - - -
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

4 Beam D-D - - - - - - - -
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 25 1 2 2 8.75 - - - - - 20.56
at B 25 1 2 2 10.33 - - - - - 24.27
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 7 of 7
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

5 Grid 1-1 - - - - - - - -
Bottom bars 20 1 2 2 33.50 - - - - 50.37 -
Top Bars 20 1 2 2 33.50 - - - - 50.37 -
extra top bars at B 20 1 1 1 6.91 - - - - 5.20 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 9.25 - - - - 6.95 -
Stirrups 8 1 66 66 4.99 39.66 - - - - -

6 Beam 2-2/4-4 - - - - - - - -
Bottom bars 16 2 3 6 48.00 - - - 138.56 - -
ld 16 2 3 6 3.00 - - - 8.66 - -
Top Bars 20 2 2 4 49.50 - - - - 148.86 -
ld 20 2 2 4 3.75 - - - - 11.28 -
extra top bars at A 20 2 1 2 8.91 - - - - 13.40 -
at B 20 2 2 4 9.49 - - - - 28.54 -
at C 20 2 1 2 9.49 - - - - 14.27 -
at D 20 2 2 4 8.91 - - - - 26.80 -
Stirrups 8 2 101 202 4.17 101.44 - - - - -

7 Beam 3-3 - - - - - - - -
Bottom bars 16 1 3 3 48.00 - - - 69.28 - -
ld 16 1 3 3 3.00 - - - 4.33 - -
Top Bars 20 1 2 2 49.50 - - - - 74.43 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra top bars at A 20 1 1 1 8.91 - - - - 6.70 -
at B 20 1 2 2 9.49 - - - - 14.27 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 8.91 - - - - 13.40 -
Stirrups 8 1 101 101 4.17 50.72 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 8 of 8
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

D.3 Lintel and sill Beam at lvl +10'-0" - - - - - - - -


1 at A-A - - - - - - - -
Bottom bars 10 2 2 4 32.50 - 24.45 - - - -
Stirrups 8 2 52 104 1.24 15.53 - - - - -

2 at B-B & C-C - - - - - - - -


Bottom bars 10 4 2 8 32.50 - 48.91 - - - -
ld 10 4 2 8 2.25 - 3.39 - - - -
Stirrups 8 4 52 208 1.24 31.06 - - - - -

3 at D-D - - - - - - - -
Bottom bars 10 2 2 4 42.50 - 31.98 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 72 144 1.24 21.50 - - - - -

4 at 1-1 - - - - - - - -
Bottom bars 10 2 2 4 20.50 - 15.43 - - - -
Stirrups 8 2 28 56 1.24 8.36 - - - - -

5 at 2-2 - - - - - - - -
Bottom bars 10 2 2 4 46.50 - 34.99 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 80 160 1.24 23.89 - - - - -

6 at 3-3 - - - - - - - -
Bottom bars 10 2 2 4 20.50 - 15.43 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 28 56 0.99 6.68 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 9 of 9
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
7 at 4-4 - - - - - - - -
Bottom bars 10 2 2 4 52.50 - 39.50 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 92 184 1.24 27.48 - - - - -

D.4 BEAM at GF lvl +21'-0" - - - - - - - -


1 Grid A-A - - - - - - - -
Bottom bars 20 1 2 2 35.50 - - - - 53.38 -
Top Bars 20 1 2 2 35.50 - - - - 53.38 -
extra top bars at 4 20 1 1 1 7.25 - - - - 5.45 -
at 3 20 1 1 1 11.49 - - - - 8.64 -
at 2 20 1 1 1 9.25 - - - - 6.95 -
Stirrups 8 1 70 70 4.99 42.07 - - - - -

2 Beam B-B - - - - - - - -
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

3 Beam C-C - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 10 of 10
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 1 1 7.75 - - - - 5.83 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

4 Beam D-D - - - - - - - -
Bottom bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Top Bars 20 1 2 2 45.50 - - - - 68.42 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra bot bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 7.91 - - - - 5.95 -
extra top bars at A 25 1 2 2 8.75 - - - - - 20.56
at B 25 1 2 2 10.33 - - - - - 24.27
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

5 Grid 1-1 - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 11 of 11
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Bottom bars 20 1 2 2 33.50 - - - - 50.37 -
Top Bars 20 1 2 2 33.50 - - - - 50.37 -
extra top bars at B 20 1 1 1 6.91 - - - - 5.20 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 1 1 9.25 - - - - 6.95 -
Stirrups 8 1 66 66 4.99 39.66 - - - - -

6 Beam 2-2/4-4 - - - - - - - -
Bottom bars 16 2 3 6 48.00 - - - 138.56 - -
ld 16 2 3 6 3.00 - - - 8.66 - -
Top Bars 20 2 2 4 49.50 - - - - 148.86 -
ld 20 2 2 4 3.75 - - - - 11.28 -
extra top bars at A 20 2 1 2 8.91 - - - - 13.40 -
at B 20 2 2 4 9.49 - - - - 28.54 -
at C 20 2 1 2 9.49 - - - - 14.27 -
at D 20 2 2 4 8.91 - - - - 26.80 -
Stirrups 8 2 101 202 4.17 101.44 - - - - -

7 Beam 3-3 - - - - - - - -
Bottom bars 16 1 3 3 52.00 - - - 75.05 - -
ld 16 1 3 3 3.00 - - - 4.33 - -
Top Bars 20 1 2 2 53.50 - - - - 80.45 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra top bars at A 20 1 1 1 10.33 - - - - 7.77 -
at B 20 1 2 2 9.49 - - - - 14.27 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 8.91 - - - - 13.40 -
Stirrups 8 1 101 101 4.17 50.72 - - - - -

D.5 Lintel and sill Beam at lvl +21'-0" - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 12 of 12
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
1 at A-A - - - - - - - -
Bottom bars 10 2 2 4 32.50 - 24.45 - - - -
Stirrups 8 2 52 104 1.24 15.53 - - - - -

2 at B-B & C-C - - - - - - - -


Bottom bars 10 4 2 8 32.50 - 48.91 - - - -
ld 10 4 2 8 2.25 - 3.39 - - - -
Stirrups 8 4 52 208 1.24 31.06 - - - - -

3 at D-D - - - - - - - -
Bottom bars 10 2 2 4 42.50 - 31.98 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 72 144 1.24 21.50 - - - - -

4 at 1-1 - - - - - - - -
Bottom bars 10 2 2 4 20.50 - 15.43 - - - -
Stirrups 8 2 28 56 1.24 8.36 - - - - -

5 at 2-2 - - - - - - - -
Bottom bars 10 2 2 4 46.50 - 34.99 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 80 160 1.24 23.89 - - - - -

6 at 3-3 - - - - - - - -
Bottom bars 10 2 2 4 14.50 - 10.91 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 16 32 0.99 3.82 - - - - -

7 at 4-4 - - - - - - - -
Bottom bars 10 2 2 4 52.50 - 39.50 - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 13 of 13
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 92 184 1.24 27.48 - - - - -

D.6 BEAM at GF lvl +31'-6" - - - - - - - -


1 Grid A-A - - - - - - - -
Bottom bars 16 1 2 2 34.00 - - - 32.71 - -
Bottom bars 12 1 1 1 33.00 - - 8.93 - - -
Top Bars 16 1 2 2 34.00 - - - 32.71 - -
extra top bars at 4 20 1 1 1 7.25 - - - - 5.45 -
at 3 20 1 1 1 11.49 - - - - 8.64 -
at 2 20 1 1 1 9.25 - - - - 6.95 -
Stirrups 8 1 70 70 4.99 42.07 - - - - -

2 Beam B-B - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 1 1 43.00 - - 11.64 - - -
ld 12 1 1 1 2.50 - - 0.68 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 16 1 1 1 7.00 - - - 3.37 - -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 16 1 1 1 7.16 - - - 3.44 - -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

3 Beam C-C - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 2 2 43.00 - - 23.28 - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 14 of 14
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
ld 12 1 2 2 2.50 - - 1.35 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 16 1 2 2 7.00 - - - 6.74 - -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 16 1 2 2 7.16 - - - 6.89 - -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

4 Beam D-D - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 2 2 43.00 - - 23.28 - - -
ld 12 1 2 2 2.50 - - 1.35 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

5 Grid 1-1 - - - - - - - -
Bottom bars 16 1 2 2 32.00 - - - 30.79 - -
Bottom bars 12 1 1 1 31.00 - - 8.39 - - -
Top Bars 16 1 2 2 32.00 - - - 30.79 - -
extra top bars at B 20 1 1 1 6.91 - - - - 5.20 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 9.25 - - - - 13.91 -
Stirrups 8 1 66 66 4.99 39.66 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 15 of 15
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

6 Beam 2-2/4-4 - - - - - - - -
Bottom bars 16 2 2 4 48.00 - - - 92.37 - -
ld 16 2 2 4 3.00 - - - 5.77 - -
Bottom bars 12 2 1 2 47.00 - - 25.45 - - -
ld 12 2 1 2 2.50 - - 1.35 - - -
Top Bars 16 2 2 4 48.00 - - - 92.37 - -
ld 16 2 2 4 3.00 - - - 5.77 - -
extra top bars at A 16 2 1 2 8.16 - - - 7.85 - -
at B 20 2 1 2 9.49 - - - - 14.27 -
at C 20 2 1 2 9.49 - - - - 14.27 -
at D 20 2 2 4 8.91 - - - - 26.80 -
Stirrups 8 2 101 202 4.17 101.44 - - - - -

7 Beam 3-3 - - - - - - - -
Bottom bars 16 1 2 2 52.00 - - - 50.03 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 1 1 51.50 - - 13.94 - - -
ld 12 1 1 1 2.50 - - 0.68 - - -
Top Bars 16 1 2 2 52.00 - - - 50.03 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 16 1 1 1 10.33 - - - 4.97 - -
at B 20 1 1 1 9.49 - - - - 7.13 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 8.91 - - - - 13.40 -
Stirrups 8 1 101 101 4.17 50.72 - - - - -

D.7 Lintel and sill Beam at lvl +31'-6" - - - - - - - -


1 at A-A - - - - - - - -
Bottom bars 10 2 2 4 32.50 - 24.45 - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 16 of 16
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Stirrups 8 2 52 104 1.24 15.53 - - - - -

2 at B-B & C-C - - - - - - - -


Bottom bars 10 4 2 8 32.50 - 48.91 - - - -
ld 10 4 2 8 2.25 - 3.39 - - - -
Stirrups 8 4 52 208 1.24 31.06 - - - - -

3 at D-D - - - - - - - -
Bottom bars 10 2 2 4 42.50 - 31.98 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 72 144 1.24 21.50 - - - - -

4 at 1-1 - - - - - - - -
Bottom bars 10 2 2 4 20.50 - 15.43 - - - -
Stirrups 8 2 28 56 1.24 8.36 - - - - -

5 at 2-2 - - - - - - - -
Bottom bars 10 2 2 4 46.50 - 34.99 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 80 160 1.24 23.89 - - - - -

6 at 4-4 - - - - - - - -
Bottom bars 10 2 2 4 52.50 - 39.50 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 92 184 1.24 27.48 - - - - -

D.8 BEAM at GF lvl +42'-0" - - - - - - - -


1 Beam B-B - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 17 of 17
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Bottom bars 12 1 1 1 43.00 - - 11.64 - - -
ld 12 1 1 1 2.50 - - 0.68 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 16 1 1 1 7.00 - - - 3.37 - -
at B 20 1 1 1 10.33 - - - - 7.77 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 16 1 1 1 7.16 - - - 3.44 - -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

2 Beam C-C - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 2 2 43.00 - - 23.28 - - -
ld 12 1 2 2 2.50 - - 1.35 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
extra top bars at A 16 1 2 2 7.00 - - - 6.74 - -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 16 1 2 2 7.16 - - - 6.89 - -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

3 Beam D-D - - - - - - - -
Bottom bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -
Bottom bars 12 1 2 2 43.00 - - 23.28 - - -
ld 12 1 2 2 2.50 - - 1.35 - - -
Top Bars 16 1 2 2 44.00 - - - 42.34 - -
ld 16 1 2 2 3.00 - - - 2.89 - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 18 of 18
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
extra top bars at A 20 1 2 2 7.75 - - - - 11.65 -
at B 20 1 2 2 10.33 - - - - 15.53 -
at C 20 1 2 2 9.49 - - - - 14.27 -
at D 20 1 2 2 7.91 - - - - 11.89 -
Stirrups 8 1 91 91 4.17 45.70 - - - - -

4 Grid 1-1 - - - - - - - -
Bottom bars 16 1 2 2 32.00 - - - 30.79 - -
Bottom bars 12 1 1 1 31.00 - - 8.39 - - -
Top Bars 16 1 2 2 32.00 - - - 30.79 - -
extra top bars at B 20 1 1 1 6.91 - - - - 5.20 -
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 9.25 - - - - 13.91 -
Stirrups 8 1 66 66 4.99 39.66 - - - - -

5 Beam 2-2/4-4 - - - - - - - -
Bottom bars 16 2 2 4 32.00 - - - 61.58 - -
Bottom bars 12 2 1 2 31.00 - - 16.79 - - -
Top Bars 16 2 2 4 32.00 - - - 61.58 - -
ld 16 2 2 4 3.00 - - - 5.77 - -
extra top bars at B 20 2 1 2 8.91 - - - - 13.40 -
at C 20 2 1 2 9.49 - - - - 14.27 -
at D 20 2 2 4 8.91 - - - - 26.80 -
Stirrups 8 2 59 118 4.17 59.26 - - - - -

6 Beam 3-3 - - - - - - - -
Bottom bars 16 1 2 2 32.00 - - - 30.79 - -
Bottom bars 12 1 1 1 31.50 - - 8.53 - - -
Top Bars 16 1 2 2 32.00 - - - 30.79 - -
extra top bars at A 20 1 1 1 8.91 - - - - 6.70 -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 19 of 19
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
at C 20 1 1 1 9.49 - - - - 7.13 -
at D 20 1 2 2 8.91 - - - - 13.40 -
Stirrups 8 1 59 59 4.17 29.63 - - - - -

D.9 Lintel and sill Beam at lvl +42'-0" - - - - - - - -


1 at B-B & C-C - - - - - - - -
Bottom bars 10 4 2 8 32.50 - 48.91 - - - -
ld 10 4 2 8 2.25 - 3.39 - - - -
Stirrups 8 4 52 208 1.24 31.06 - - - - -

2 at D-D - - - - - - - -
Bottom bars 10 2 2 4 42.50 - 31.98 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 72 144 1.24 21.50 - - - - -

3 at 1-1 - - - - - - - -
Bottom bars 10 2 2 4 20.50 - 15.43 - - - -
Stirrups 8 2 28 56 1.24 8.36 - - - - -

4 at 2-2 - - - - - - - -
Bottom bars 10 2 2 4 30.50 - 22.95 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 48 96 1.24 14.34 - - - - -

5 at 4-4 - - - - - - - -
Bottom bars 10 2 2 4 36.50 - 27.46 - - - -
ld 10 2 2 4 2.25 - 1.69 - - - -
Stirrups 8 2 60 120 1.24 17.92 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 20 of 20
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
D TOTAL for BEAM 2446.42 796.08 1152.91 1751.01 2939.24 89.65 9175.31

E SLABS
E1 SLAB at level 10'-0" - - - - - - - -
1 S1 16'x12' 2 nos - - - - - - -
main bars 10 2 20 40 26.57 - 199.92 - - - -
10 2 20 40 17.42 - 131.07 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
distribution bars 10 2 19 38 26.74 - 191.14 - - - -
10 2 19 38 21.42 - 153.11 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
extra bars 8 4 8 32 16.00 61.66 - - - - -

2 S1 16'x16' 2 nos - - - - - - -
main bars 10 2 20 40 30.57 - 230.02 - - - -
10 2 20 40 21.42 - 161.17 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
distribution bars 10 2 25 50 26.74 - 251.50 - - - -
10 2 25 50 21.42 - 201.47 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
extra bars 8 4 8 32 16.00 61.66 - - - - -

3 S1 10'x16' 3 nos - - - - - - -
main bars 10 3 12 36 30.57 - 207.02 - - - -
10 3 12 36 21.42 - 145.06 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
distribution bars 10 3 25 75 20.74 - 292.60 - - - -
10 3 25 75 15.42 - 217.55 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
extra bars 8 6 8 48 10.00 57.80 - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 21 of 21
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

E2 SLAB at level 21'-0" - - - - - - - -


1 S1 16'x12' 2 nos - - - - - - -
main bars 10 2 20 40 26.57 - 199.92 - - - -
10 2 20 40 17.42 - 131.07 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
distribution bars 10 2 19 38 26.74 - 191.14 - - - -
10 2 19 38 21.42 - 153.11 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
extra bars 8 4 8 32 16.00 61.66 - - - - -

2 S1 16'x16' 2 nos - - - - - - -
main bars 10 2 20 40 30.57 - 230.02 - - - -
10 2 20 40 21.42 - 161.17 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
distribution bars 10 2 25 50 26.74 - 251.50 - - - -
10 2 25 50 21.42 - 201.47 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
extra bars 8 4 8 32 16.00 61.66 - - - - -

3 S1 10'x16' 3 nos - - - - - - -
main bars 10 3 12 36 30.57 - 207.02 - - - -
10 3 12 36 21.42 - 145.06 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
distribution bars 10 3 25 75 20.74 - 292.60 - - - -
10 3 25 75 15.42 - 217.55 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
extra bars 8 6 8 48 10.00 57.80 - - - - -

E3 SLAB at level 31'-6" - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 22 of 22
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
1 S1 16'x12' 2 nos - - - - - - -
main bars 10 2 20 40 26.57 - 199.92 - - - -
10 2 20 40 17.42 - 131.07 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
distribution bars 10 2 19 38 26.74 - 191.14 - - - -
10 2 19 38 21.42 - 153.11 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
extra bars 8 4 8 32 16.00 61.66 - - - - -

2 S1 16'x16' 2 nos - - - - - - -
main bars 10 2 20 40 30.57 - 230.02 - - - -
10 2 20 40 21.42 - 161.17 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
distribution bars 10 2 25 50 26.74 - 251.50 - - - -
10 2 25 50 21.42 - 201.47 - - - -
binders 8 4 6 24 8.00 23.12 - - - - -
extra bars 8 4 8 32 16.00 61.66 - - - - -

3 S1 10'x16' 3 nos - - - - - - -
main bars 10 3 12 36 30.57 - 207.02 - - - -
10 3 12 36 21.42 - 145.06 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
distribution bars 10 3 25 75 20.74 - 292.60 - - - -
10 3 25 75 15.42 - 217.55 - - - -
binders 8 6 6 36 8.00 34.68 - - - - -
extra bars 8 6 8 48 10.00 57.80 - - - - -

E4 SLAB at level 42'-0" - - - - - - - -


1 S1 16'x12' 1 nos - - - - - - -
main bars 10 1 20 20 26.57 - 99.96 - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 23 of 23
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
10 1 20 20 17.42 - 65.54 - - - -
binders 8 2 6 12 8.00 11.56 - - - - -
distribution bars 10 1 19 19 26.74 - 95.57 - - - -
10 1 19 19 21.42 - 76.56 - - - -
binders 8 2 6 12 8.00 11.56 - - - - -
extra bars 8 2 8 16 16.00 30.83 - - - - -

2 S1 16'x16' 1 nos - - - - - - -
main bars 10 1 20 20 30.57 - 115.01 - - - -
10 1 20 20 21.42 - 80.59 - - - -
binders 8 2 6 12 8.00 11.56 - - - - -
distribution bars 10 1 25 25 26.74 - 125.75 - - - -
10 1 25 25 21.42 - 100.73 - - - -
binders 8 2 6 12 8.00 11.56 - - - - -
extra bars 8 2 8 16 16.00 30.83 - - - - -

3 S1 10'x16' 4 nos - - - - - - -
main bars 10 4 12 48 30.57 - 276.02 - - - -
10 4 12 48 21.42 - 193.41 - - - -
binders 8 8 6 48 8.00 46.24 - - - - -
distribution bars 10 4 25 100 20.74 - 390.14 - - - -
10 4 25 100 15.42 - 290.07 - - - -
binders 8 8 6 48 8.00 46.24 - - - - -
extra bars 8 8 8 64 10.00 77.07 - - - - -

E TOTAL for SLAB 1306.39 9054.27 0.00 0.00 0.00 0.00 10360.66

TOTAL REBAR (A+B+C+D+E) 6.66 10.08 1.98 7.47 6.78 1.46 34.45

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Building of District Technical Office
Beam Consultant Pvt. Ltd. Page No: 24 of 24
Location: Doti Sanepa Date: 10 th Feb 2015

BAR BENDING SCHEDULE FOR OFFICE BUILDING


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
tonn

10 % wastage and contingencies shall be added ????? 37.89 mt

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 25 of 25
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION B


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
A Water Tank of Capacity 20000 ltrs
Base
1 Bottom Bars along long wall 10 1 32 32 15.00 - 90.29 - - - -
along short wall 10 1 22 22 20.00 - 82.77 - - - -

1 Top Bars along long wall 10 1 24 24 15.00 - 67.72 - - - -


along short wall 10 1 17 17 20.00 - 63.96 - - - -

3 Vertical Bars along long wall 10 4 32 128 9.00 - 216.70 - - - -


along short wall 10 4 22 88 9.00 - 148.98 - - - -
Binders 8 2 11 22 112.00 296.73 - - - - -

Slab
1 Bottom Bars along long wall 10 2 32 64 15.00 - 180.59 - - - -
along short wall 10 2 22 44 20.00 - 165.54 - - - -

E TOTAL for SLAB 296.73 1016.55 0.00 0.00 0.00 0.00 1313.28

Septic tank slab


1 Bottom Bars along long wall 10 2 24 48 12.00 - 108.35 - - - -
along short wall 10 2 16 32 16.00 - 96.31 - - - -

E TOTAL for SLAB 0.00 204.66 0.00 0.00 0.00 0.00 204.66

10 % contingencies shall be added

Prepared By: Checked/ Forwarded By: Approved By: .


Weight in kg.
8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Total
block A 6.66 10.08 1.98 7.47 6.78 1.46 34.45
block B #REF! #REF! #REF! #REF! #REF! #REF! #REF!
block C #REF! #REF! #REF! #REF! #REF! #REF! #REF!
block D #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Grand Total #REF! mts.

#REF! kgs