EPC Contract Package of Dhaulasidh HEP Covering Design & Engineering Services, Civil and HM Works 4.6 Slope Stabilisation

The document discusses instrumentation requirements for the slope stabilization and drainage works at a dam complex. It lists 33 types of instruments that shall be installed at the dam structure, dam slopes, powerhouse, penstock, and tailrace channel. These include devices for measuring uplift, cracks, stress, strain, pore pressure, water levels, seismic activity, temperature, tilt, and displacement. Calibration reports and monthly instrumentation data analysis reports must be provided to the employer's representative.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views2 pages

EPC Contract Package of Dhaulasidh HEP Covering Design & Engineering Services, Civil and HM Works 4.6 Slope Stabilisation

The document discusses instrumentation requirements for the slope stabilization and drainage works at a dam complex. It lists 33 types of instruments that shall be installed at the dam structure, dam slopes, powerhouse, penstock, and tailrace channel. These include devices for measuring uplift, cracks, stress, strain, pore pressure, water levels, seismic activity, temperature, tilt, and displacement. Calibration reports and monthly instrumentation data analysis reports must be provided to the employer's representative.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

EPC Contract Package of Dhaulasidh HEP Covering Design & Engineering Services,

Civil and HM Works

4.6 Slope Stabilisation


The stability of cut slopes in and around dam complex including, powerhouse
complex and dam complex needs to be ensured by providing adequate support system
as per Indian/International best practice.
Surface drainage of all cut slopes shall be ensured by channelizing the surface water
into river/reservoir.

4.7 Instrumentation
Permanent instrumentation for Dam, power House and cut slopes shall be done as per
the codal provisions of Indian Standards and following data should be provided to
Employer‟s Representative:
 Calibration curves and test report of instruments before installation.
 Report on analysis of instrumentation data should be submitted on monthly
basis.
 In addition, analysis report should be submitted as & when required.
Sr.
Instruments Numbers
No.
DAM STRUCTURE

1. UPLIFT MEASURING DEVICE (UP) 11

2. 3-D CRACK METER 11

3. STRESS METER 29

4. STRAIN METER ROSSETTES (Group of Five) 29

5. NO STRESS-STRAIN METER 29

6. JOINT METER (JM) 26

7. JOINT METER (For Vertical Foundation Displacement 12


Measurement)

8. INCLINOMETER 2

9. TILT METER 3

10. VW-PIEZOMETER 23

11. MPBX (upto 30-35 m) 4

12. STRONG MOTION ACCELEROGRAPHS 3

13. AUTOMATIC WEATHER STATION 1

14. DATA ACQUISITION SYSTEM 1

Page | 1
15. AUTOMATIC WATER LEVEL INDICATOR 2

16. MICRO-SEISMIC RECORDER 5

17. TEMPERATURE METER 91

18. DIRECT PENDULUM 2

19. INDIRECT PENDULUM 2

20. ROBOTIC TOTAL STATION 1

21. SINGLE PRISM TARGET 20-24

22. PORTABLE READ-OUT UNIT 1

23. INCLINOMETER PROBE 1

DAM SLOPES

24 INCLINOMETER 5 to 7

25 PORE PRESSURE CELL (V-W Type) 5 to 7

26 STAND PIPE PIEZOMETER 3 to 5

27 SINGLE PRISM TARGET 10

POWER HOUSE

28 PORTABLE READ-OUT UNIT (for Magnetic Ring 1


Borehole Extensometer)

29 PROBE FOR MAGNETIC RING BOREHOLE 1


EXTENSOMETER
30 MAGNETIC RING BOREHOLE EXTENSOMETER 6 to 8

31 PIEZOMETER (V-W Type) 6 to 8

PENSTOCK

32 STRAIN METER (Unidirectional) 24

TAIL RACE CHANNEL

33 STAND PIPE PIEZOMETER 5 to 8

34 SOUNDER FOR STANDPIPE PIEZOMETER 1

The specifications of the instruments mentioned above is as per Appendix-E