Pt. Duta Utama Tehnik Abadi: Daily Report

1. The document is a daily report from PT. DUTA UTAMA TEHNIK ABADI for the installation of scaffolding T-34. 2. Today's work status was 30% completed for mobilization of scaffolding T-34. Tomorrow's planned work is to install scaffolding T-34. 3. A total of 23 workers were on site today including managers, supervisors, foremen, and skilled/semi-skilled workers, accumulating 207 manhours of work.

Uploaded by

Ma'rifatullah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views45 pages

Pt. Duta Utama Tehnik Abadi: Daily Report

1. The document is a daily report from PT. DUTA UTAMA TEHNIK ABADI for the installation of scaffolding T-34. 2. Today's work status was 30% completed for mobilization of scaffolding T-34. Tomorrow's planned work is to install scaffolding T-34. 3. A total of 23 workers were on site today including managers, supervisors, foremen, and skilled/semi-skilled workers, accumulating 207 manhours of work.

Uploaded by

Ma'rifatullah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 45

` Doc No : FM-DUTA-REPT-01

PT. DUTA UTAMA TEHNIK ABADI Page :1


MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : March 11, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : March 11, 2019 TOMORROW : March 12, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Mobilization Scaffolding T-34 C 30% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 1 9
2 2 Supervisor 1 prs 1 9 1 9
3 3 Foreman 1 prs 1 9 1 9
4 4 Safety Man 1 prs 1 9 1 9
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 5 45
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 7 63
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 5 45
11 11 Mech./Elect. 1 prs 1 9 1 9
12 12 Tool Keeper 1 prs 1 9 1 9
13 Total 23 prs 23 207 23 207
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : March 13, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : March 13, 2019 TOMORROW : March 14, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 5% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 2 18
2 2 Supervisor 1 prs 1 9 2 18
3 3 Foreman 1 prs 1 9 2 18
4 4 Safety Man 1 prs 1 9 2 18
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 10 90
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 14 126
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 10 90
11 11 Mech./Elect. 1 prs 1 9 2 18
12 12 Tool Keeper 1 prs 1 9 2 18
13 Total 23 prs 23 207 46 414
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : March 14, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : March 14, 2019 TOMORROW : March 15, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 10% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 3 27
2 2 Supervisor 1 prs 1 9 3 27
3 3 Foreman 1 prs 1 9 3 27
4 4 Safety Man 1 prs 1 9 3 27
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 15 135
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 21 189
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 15 135
11 11 Mech./Elect. 1 prs 1 9 3 27
12 12 Tool Keeper 1 prs 1 9 3 27
13 Total 23 prs 23 207 69 621
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : March 15, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : March 15, 2019 TOMORROW : March 16, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 15% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 4 36
2 2 Supervisor 1 prs 1 9 4 36
3 3 Foreman 1 prs 1 9 4 36
4 4 Safety Man 1 prs 1 9 4 36
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 20 180
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 28 252
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 20 180
11 11 Mech./Elect. 1 prs 1 9 4 36
12 12 Tool Keeper 1 prs 1 9 4 36
13 Total 23 prs 23 207 92 828
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : March 18, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : March 18, 2019 TOMORROW : March 19, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 20% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 5 45
2 2 Supervisor 1 prs 1 9 5 45
3 3 Foreman 1 prs 1 9 5 45
4 4 Safety Man 1 prs 1 9 5 45
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 25 225
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 35 315
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 25 225
11 11 Mech./Elect. 1 prs 1 9 5 45
12 12 Tool Keeper 1 prs 1 9 5 45
13 Total 23 prs 23 207 115 1035
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 1, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 1, 2019 TOMORROW : April 2, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 35% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 6 54
2 2 Supervisor 1 prs 1 9 6 54
3 3 Foreman 1 prs 1 9 6 54
4 4 Safety Man 1 prs 1 9 6 54
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 30 270
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 42 378
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 30 270
11 11 Mech./Elect. 1 prs 1 9 6 54
12 12 Tool Keeper 1 prs 1 9 6 54
13 Total 23 prs 23 207 138 1242
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 2, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 2, 2019 TOMORROW : April 3, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 40% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 7 63
2 2 Supervisor 1 prs 1 9 7 63
3 3 Foreman 1 prs 1 9 7 63
4 4 Safety Man 1 prs 1 9 7 63
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 35 315
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 49 441
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 35 315
11 11 Mech./Elect. 1 prs 1 9 7 63
12 12 Tool Keeper 1 prs 1 9 7 63
13 Total 23 prs 23 207 161 1449
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 4, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 4, 2019 TOMORROW : April 5, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 45% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 8 72
2 2 Supervisor 1 prs 1 9 8 72
3 3 Foreman 1 prs 1 9 8 72
4 4 Safety Man 1 prs 1 9 8 72
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 40 360
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 56 504
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 40 360
11 11 Mech./Elect. 1 prs 1 9 8 72
12 12 Tool Keeper 1 prs 1 9 8 72
13 Total 23 prs 23 207 184 1656
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 5, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 5, 2019 TOMORROW : April 6, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 50% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 9 81
2 2 Supervisor 1 prs 1 9 9 81
3 3 Foreman 1 prs 1 9 9 81
4 4 Safety Man 1 prs 1 9 9 81
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 45 405
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 63 567
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 45 405
11 11 Mech./Elect. 1 prs 1 9 9 81
12 12 Tool Keeper 1 prs 1 9 9 81
13 Total 23 prs 23 207 207 1863
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 8, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 8, 2019 TOMORROW : April 9, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 55% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 10 90
2 2 Supervisor 1 prs 1 9 10 90
3 3 Foreman 1 prs 1 9 10 90
4 4 Safety Man 1 prs 1 9 10 90
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 50 450
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 70 630
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 50 450
11 11 Mech./Elect. 1 prs 1 9 10 90
12 12 Tool Keeper 1 prs 1 9 10 90
13 Total 23 prs 23 207 230 2070
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 9, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 9, 2019 TOMORROW : April 10, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 60% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 11 99
2 2 Supervisor 1 prs 1 9 11 99
3 3 Foreman 1 prs 1 9 11 99
4 4 Safety Man 1 prs 1 9 11 99
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 55 495
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 77 693
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 55 495
11 11 Mech./Elect. 1 prs 1 9 11 99
12 12 Tool Keeper 1 prs 1 9 11 99
13 Total 23 prs 23 207 253 2277
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 10, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 10, 2019 TOMORROW : April 11, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 65% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 12 108
2 2 Supervisor 1 prs 1 9 12 108
3 3 Foreman 1 prs 1 9 12 108
4 4 Safety Man 1 prs 1 9 12 108
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 60 540
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 84 756
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 60 540
11 11 Mech./Elect. 1 prs 1 9 12 108
12 12 Tool Keeper 1 prs 1 9 12 108
13 Total 23 prs 23 207 276 2484
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 11, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 11, 2019 TOMORROW : April 12, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 70% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 13 117
2 2 Supervisor 1 prs 1 9 13 117
3 3 Foreman 1 prs 1 9 13 117
4 4 Safety Man 1 prs 1 9 13 117
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 65 585
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 91 819
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 65 585
11 11 Mech./Elect. 1 prs 1 9 13 117
12 12 Tool Keeper 1 prs 1 9 13 117
13 Total 23 prs 23 207 299 2691
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 12, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 12, 2019 TOMORROW : April 13, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 75% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 14 126
2 2 Supervisor 1 prs 1 9 14 126
3 3 Foreman 1 prs 1 9 14 126
4 4 Safety Man 1 prs 1 9 14 126
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 70 630
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 98 882
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 70 630
11 11 Mech./Elect. 1 prs 1 9 14 126
12 12 Tool Keeper 1 prs 1 9 14 126
13 Total 23 prs 23 207 322 2898
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 15, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 15, 2019 TOMORROW : April 16, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 80% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 15 135
2 2 Supervisor 1 prs 1 9 15 135
3 3 Foreman 1 prs 1 9 15 135
4 4 Safety Man 1 prs 1 9 15 135
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 75 675
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 105 945
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 75 675
11 11 Mech./Elect. 1 prs 1 9 15 135
12 12 Tool Keeper 1 prs 1 9 15 135
13 Total 23 prs 23 207 345 3105
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 16, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 16, 2019 TOMORROW : April 17, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 85% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 16 144
2 2 Supervisor 1 prs 1 9 16 144
3 3 Foreman 1 prs 1 9 16 144
4 4 Safety Man 1 prs 1 9 16 144
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 80 720
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 112 1008
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 80 720
11 11 Mech./Elect. 1 prs 1 9 16 144
12 12 Tool Keeper 1 prs 1 9 16 144
13 Total 23 prs 23 207 368 3312
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 22, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 22, 2019 TOMORROW : April 23, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 87% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 17 153
2 2 Supervisor 1 prs 1 9 17 153
3 3 Foreman 1 prs 1 9 17 153
4 4 Safety Man 1 prs 1 9 17 153
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 85 765
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 119 1071
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 85 765
11 11 Mech./Elect. 1 prs 1 9 17 153
12 12 Tool Keeper 1 prs 1 9 17 153
13 Total 23 prs 23 207 391 3519
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 23, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 23, 2019 TOMORROW : April 24, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 90% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 18 162
2 2 Supervisor 1 prs 1 9 18 162
3 3 Foreman 1 prs 1 9 18 162
4 4 Safety Man 1 prs 1 9 18 162
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 90 810
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 126 1134
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 90 810
11 11 Mech./Elect. 1 prs 1 9 18 162
12 12 Tool Keeper 1 prs 1 9 18 162
13 Total 23 prs 23 207 414 3726
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 24, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 24, 2019 TOMORROW : April 25, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 93% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 19 171
2 2 Supervisor 1 prs 1 9 19 171
3 3 Foreman 1 prs 1 9 19 171
4 4 Safety Man 1 prs 1 9 19 171
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 95 855
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 133 1197
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 95 855
11 11 Mech./Elect. 1 prs 1 9 19 171
12 12 Tool Keeper 1 prs 1 9 19 171
13 Total 23 prs 23 207 437 3933
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 25, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 25, 2019 TOMORROW : April 26, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 95% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 20 180
2 2 Supervisor 1 prs 1 9 20 180
3 3 Foreman 1 prs 1 9 20 180
4 4 Safety Man 1 prs 1 9 20 180
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 100 900
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 140 1260
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 100 900
11 11 Mech./Elect. 1 prs 1 9 20 180
12 12 Tool Keeper 1 prs 1 9 20 180
13 Total 23 prs 23 207 460 4140
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : April 26, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : April 26, 2019 TOMORROW : April 27, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 C 97% 1 Install Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 21 189
2 2 Supervisor 1 prs 1 9 21 189
3 3 Foreman 1 prs 1 9 21 189
4 4 Safety Man 1 prs 1 9 21 189
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 105 945
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 147 1323
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 105 945
11 11 Mech./Elect. 1 prs 1 9 21 189
12 12 Tool Keeper 1 prs 1 9 21 189
13 Total 23 prs 23 207 483 4347
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area :
Client : PT. Vopak Terminal Merak Date : May 3, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : May 3, 2019 TOMORROW : May 4, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Install Scaffolding T-34 F 100%

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 22 198
2 2 Supervisor 1 prs 1 9 22 198
3 3 Foreman 1 prs 1 9 22 198
4 4 Safety Man 1 prs 1 9 22 198
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 5 prs 5 45 110 990
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 7 prs 7 63 154 1386
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 110 990
11 11 Mech./Elect. 1 prs 1 9 22 198
12 12 Tool Keeper 1 prs 1 9 22 198
13 Total 23 prs 23 207 506 4554
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : July 24, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : July 24, 2019 TOMORROW : July 25, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 10% 1 Remove Scaffolding T-34

Weather & Hour Notes : Stop Working Because tranfer PX to T-34 (24:00~14:00 WIB)
Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 23 207
2 2 Supervisor 1 prs 1 9 23 207
3 3 Foreman 1 prs 1 9 23 207
4 4 Safety Man 1 prs 1 9 23 207
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 112 1008
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 157 1413
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 115 1035
11 11 Mech./Elect. 1 prs 1 9 23 207
12 12 Tool Keeper 1 prs 1 9 23 207
13 Total 16 prs 16 144 522 4698
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : July 26, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : July 26, 2019 TOMORROW : July 27, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 15% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 24 216
2 2 Supervisor 1 prs 1 9 24 216
3 3 Foreman 1 prs 1 9 24 216
4 4 Safety Man 1 prs 1 9 24 216
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 114 1026
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 160 1440
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 120 1080
11 11 Mech./Elect. 1 prs 1 9 24 216
12 12 Tool Keeper 1 prs 1 9 24 216
13 Total 16 prs 16 144 538 4842
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : July 27, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : July 27, 2019 TOMORROW : July 28, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 20% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 25 225
2 2 Supervisor 1 prs 1 9 25 225
3 3 Foreman 1 prs 1 9 25 225
4 4 Safety Man 1 prs 1 9 25 225
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 116 1044
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 163 1467
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 125 1125
11 11 Mech./Elect. 1 prs 1 9 25 225
12 12 Tool Keeper 1 prs 1 9 25 225
13 Total 16 prs 16 144 554 4986
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : July 29, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : July 29, 2019 TOMORROW : July 30, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 25% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 26 234
2 2 Supervisor 1 prs 1 9 26 234
3 3 Foreman 1 prs 1 9 26 234
4 4 Safety Man 1 prs 1 9 26 234
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 118 1062
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 166 1494
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 130 1170
11 11 Mech./Elect. 1 prs 1 9 26 234
12 12 Tool Keeper 1 prs 1 9 26 234
13 Total 16 prs 16 144 570 5130
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : July 30, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : July 30, 2019 TOMORROW : July 31, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 30% 1 Remove Scaffolding T-34

Weather & Hour Notes : Stop Working Because tranfer PX to T-34 (13:00~17:00 WIB)
Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 27 243
2 2 Supervisor 1 prs 1 9 27 243
3 3 Foreman 1 prs 1 9 27 243
4 4 Safety Man 1 prs 1 9 27 243
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 120 1080
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 169 1521
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 135 1215
11 11 Mech./Elect. 1 prs 1 9 27 243
12 12 Tool Keeper 1 prs 1 9 27 243
13 Total 16 prs 16 144 586 5274
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : July 31, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : July 31, 2019 TOMORROW : August 1, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 35% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 28 252
2 2 Supervisor 1 prs 1 9 28 252
3 3 Foreman 1 prs 1 9 28 252
4 4 Safety Man 1 prs 1 9 28 252
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 122 1098
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 172 1548
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 140 1260
11 11 Mech./Elect. 1 prs 1 9 28 252
12 12 Tool Keeper 1 prs 1 9 28 252
13 Total 16 prs 16 144 602 5418
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 1, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 1, 2019 TOMORROW : August 2, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 38% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 29 261
2 2 Supervisor 1 prs 1 9 29 261
3 3 Foreman 1 prs 1 9 29 261
4 4 Safety Man 1 prs 1 9 29 261
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 124 1116
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 175 1575
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 145 1305
11 11 Mech./Elect. 1 prs 1 9 29 261
12 12 Tool Keeper 1 prs 1 9 29 261
13 Total 16 prs 16 144 618 5562
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 2, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 2, 2019 TOMORROW : August 3, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 43% 1 Remove Scaffolding T-34

Weather & Hour Notes : Stop Working Because tranfer PX to T-34 (08:00~24:00 WIB)
Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 30 270
2 2 Supervisor 1 prs 1 9 30 270
3 3 Foreman 1 prs 1 9 30 270
4 4 Safety Man 1 prs 1 9 30 270
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 126 1134
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 178 1602
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 150 1350
11 11 Mech./Elect. 1 prs 1 9 30 270
12 12 Tool Keeper 1 prs 1 9 30 270
13 Total 16 prs 16 144 634 5706
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 3, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 3, 2019 TOMORROW : August 4, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 48% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 31 279
2 2 Supervisor 1 prs 1 9 31 279
3 3 Foreman 1 prs 1 9 31 279
4 4 Safety Man 1 prs 1 9 31 279
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 128 1152
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 181 1629
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 155 1395
11 11 Mech./Elect. 1 prs 1 9 31 279
12 12 Tool Keeper 1 prs 1 9 31 279
13 Total 16 prs 16 144 650 5850
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 5, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 5, 2019 TOMORROW : August 6, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 50% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 32 288
2 2 Supervisor 1 prs 1 9 32 288
3 3 Foreman 1 prs 1 9 32 288
4 4 Safety Man 1 prs 1 9 32 288
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 130 1170
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 184 1656
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 160 1440
11 11 Mech./Elect. 1 prs 1 9 32 288
12 12 Tool Keeper 1 prs 1 9 32 288
13 Total 16 prs 16 144 666 5994
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 6, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 6, 2019 TOMORROW : August 7, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 54% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 33 297
2 2 Supervisor 1 prs 1 9 33 297
3 3 Foreman 1 prs 1 9 33 297
4 4 Safety Man 1 prs 1 9 33 297
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 132 1188
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 187 1683
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 165 1485
11 11 Mech./Elect. 1 prs 1 9 33 297
12 12 Tool Keeper 1 prs 1 9 33 297
13 Total 16 prs 16 144 682 6138
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 7, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 7, 2019 TOMORROW : August 8, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 57% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 34 306
2 2 Supervisor 1 prs 1 9 34 306
3 3 Foreman 1 prs 1 9 34 306
4 4 Safety Man 1 prs 1 9 34 306
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 134 1206
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 190 1710
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 170 1530
11 11 Mech./Elect. 1 prs 1 9 34 306
12 12 Tool Keeper 1 prs 1 9 34 306
13 Total 16 prs 16 144 698 6282
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 8, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 8, 2019 TOMORROW : August 9, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 60% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 35 315
2 2 Supervisor 1 prs 1 9 35 315
3 3 Foreman 1 prs 1 9 35 315
4 4 Safety Man 1 prs 1 9 35 315
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 136 1224
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 193 1737
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 175 1575
11 11 Mech./Elect. 1 prs 1 9 35 315
12 12 Tool Keeper 1 prs 1 9 35 315
13 Total 16 prs 16 144 714 6426
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 9, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 9, 2019 TOMORROW : August 10, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 62% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 36 324
2 2 Supervisor 1 prs 1 9 36 324
3 3 Foreman 1 prs 1 9 36 324
4 4 Safety Man 1 prs 1 9 36 324
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 138 1242
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 196 1764
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 180 1620
11 11 Mech./Elect. 1 prs 1 9 36 324
12 12 Tool Keeper 1 prs 1 9 36 324
13 Total 16 prs 16 144 730 6570
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 10, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 10, 2019 TOMORROW : August 11, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 68% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 37 333
2 2 Supervisor 1 prs 1 9 37 333
3 3 Foreman 1 prs 1 9 37 333
4 4 Safety Man 1 prs 1 9 37 333
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 140 1260
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 199 1791
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 185 1665
11 11 Mech./Elect. 1 prs 1 9 37 333
12 12 Tool Keeper 1 prs 1 9 37 333
13 Total 16 prs 16 144 746 6714
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 12, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 12, 2019 TOMORROW : August 13, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 72% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 38 342
2 2 Supervisor 1 prs 1 9 38 342
3 3 Foreman 1 prs 1 9 38 342
4 4 Safety Man 1 prs 1 9 38 342
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 142 1278
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 202 1818
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 190 1710
11 11 Mech./Elect. 1 prs 1 9 38 342
12 12 Tool Keeper 1 prs 1 9 38 342
13 Total 16 prs 16 144 762 6858
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 13, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 13, 2019 TOMORROW : August 14, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 87% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 39 351
2 2 Supervisor 1 prs 1 9 39 351
3 3 Foreman 1 prs 1 9 39 351
4 4 Safety Man 1 prs 1 9 39 351
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 144 1296
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 205 1845
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 195 1755
11 11 Mech./Elect. 1 prs 1 9 39 351
12 12 Tool Keeper 1 prs 1 9 39 351
13 Total 16 prs 16 144 778 7002
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 14, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 14, 2019 TOMORROW : August 15, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 89% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 40 360
2 2 Supervisor 1 prs 1 9 40 360
3 3 Foreman 1 prs 1 9 40 360
4 4 Safety Man 1 prs 1 9 40 360
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 146 1314
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 208 1872
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 200 1800
11 11 Mech./Elect. 1 prs 1 9 40 360
12 12 Tool Keeper 1 prs 1 9 40 360
13 Total 16 prs 16 144 794 7146
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 15, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 15, 2019 TOMORROW : August 16, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 92% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 41 369
2 2 Supervisor 1 prs 1 9 41 369
3 3 Foreman 1 prs 1 9 41 369
4 4 Safety Man 1 prs 1 9 41 369
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 148 1332
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 211 1899
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 205 1845
11 11 Mech./Elect. 1 prs 1 9 41 369
12 12 Tool Keeper 1 prs 1 9 41 369
13 Total 16 prs 16 144 810 7290
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 16, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 16, 2019 TOMORROW : August 17, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 95% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 42 378
2 2 Supervisor 1 prs 1 9 42 378
3 3 Foreman 1 prs 1 9 42 378
4 4 Safety Man 1 prs 1 9 42 378
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 150 1350
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 214 1926
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 210 1890
11 11 Mech./Elect. 1 prs 1 9 42 378
12 12 Tool Keeper 1 prs 1 9 42 378
13 Total 16 prs 16 144 826 7434
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 19, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 19, 2019 TOMORROW : August 20, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 C 96% 1 Remove Scaffolding T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 43 387
2 2 Supervisor 1 prs 1 9 43 387
3 3 Foreman 1 prs 1 9 43 387
4 4 Safety Man 1 prs 1 9 43 387
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 152 1368
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 217 1953
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 215 1935
11 11 Mech./Elect. 1 prs 1 9 43 387
12 12 Tool Keeper 1 prs 1 9 43 387
13 Total 16 prs 16 144 842 7578
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 20, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 20, 2019 TOMORROW : August 21, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Remove Scaffolding T-34 F 100% 1 Cleaning area T-34

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 44 396
2 2 Supervisor 1 prs 1 9 44 396
3 3 Foreman 1 prs 1 9 44 396
4 4 Safety Man 1 prs 1 9 44 396
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 154 1386
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 220 1980
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 220 1980
11 11 Mech./Elect. 1 prs 1 9 44 396
12 12 Tool Keeper 1 prs 1 9 44 396
13 Total 16 prs 16 144 858 7722
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :
` Doc No : FM-DUTA-REPT-01
PT. DUTA UTAMA TEHNIK ABADI Page :1
MECHANICAL -ELECTRICAL - CONSTRUCTION
DAILY REPORT Date : 1 Nov 2013
Rev No :0

Project Name : Install Scaffolding T-34 Location : Jln. Raya Merak Km-3, Merak-Banten
Working Area : T-34
Client : PT. Vopak Terminal Merak Date : August 21, 2019
Owner : PT. Vopak Terminal Merak Working Time : 08.00 - 18.00 WIB 9 hour

TO DAY : August 21, 2019 TOMORROW : August 22, 2019


No. DESCRIPTION STATUS PROG'S REMARKS No. DESCRIPTION REMARKS

1 Cleaning area T-34 F 100%

Weather & Hour Notes :


Shinny Hour Till : F= Finish
Cloudly Hour Till : C= Continue
Rainy Hour Till : UP = Under Progress
P= Postpone
Realization Up to date Cumm ED
No. Qt'y No. Manpower Today No EQUIPMENT
Material Request Manday Manhour Manday Manhour up todate today cumm.
1 1 Site Manager 1 prs 1 9 45 405
2 2 Supervisor 1 prs 1 9 45 405
3 3 Foreman 1 prs 1 9 45 405
4 4 Safety Man 1 prs 1 9 45 405
5 5 Administration 0 prs 0 0 0 0
6 6 Skill Worker 2 prs 2 18 156 1404
7 7 QC NDT 0 prs 0 0 0 0
8 8 Semi Skill Worker 3 prs 3 27 223 2007
9 9 Welder 0 prs 0 0 0 0
10 10 Helper 5 prs 5 45 225 2025
11 11 Mech./Elect. 1 prs 1 9 45 405
12 12 Tool Keeper 1 prs 1 9 45 405
13 Total 16 prs 16 144 874 7866
Prepared by : Approved by :
PT. DUTA UTAMA TEHNIK ABADI

Name : Ade Hendrik Name :


Position : Supervisor Position :