Calculation: Fire Water Demand - Sapmt/Sepco Site Office: Saudi Arabian Oil Company
Calculation: Fire Water Demand - Sapmt/Sepco Site Office: Saudi Arabian Oil Company
Calculation: Fire Water Demand - Sapmt/Sepco Site Office: Saudi Arabian Oil Company
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
RCJ
FDB
DESCRIPTION
00
DISCIPLINE
ENGINEER
JJLM
15-Jun-15
DATE:
PROJECT
ENGINEER
ISSUED FOR CONSTRUCTION
FDB
15-Jun-15
DATE:
CERTIFIED
RCJ
DATE:
15-Jun-15 June 15, 2015
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
PREPARED BY:
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FIRE WATER DEMAND CALCULATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
RCJ
TABLE OF CONTENTS
FDB
1.0 INTRODUCTION ............................................................................................................... 3
2.0 OBJECTIVE ........................................................................................................................ 3
Fire Water Distribution System ................................................................................... 3
Fire Water Demand for SAPMT/SEPCO SITE OFFICE ............................................ 3
DESCRIPTION
00
DISCIPLINE
ENGINEER
JJLM
15-Jun-15
DATE:
PROJECT
ENGINEER
FDB
15-Jun-15
DATE:
CERTIFIED
RCJ
15-Jun-15
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FIRE WATER DEMAND CALCULATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0 INTRODUCTION
ENGG CERT
RCJ
This Construction Facility, with all included tools and equipment, is considered property of the Contractor
throughout the period of the contract.
FDB
2.0 OBJECTIVE
The scope of this document is to calculate and evaluate the fire water demand for the SAPMT/SEPCO Site
Office Facilities located at Pump Station No.5.
The design basis for the estimation of fire water demand is based on applicable Saudi Aramco Standards
(SAES-S-040, Saudi Aramco Water System, SAES-B-017, Fire Water System Design and SAES-M-100, Saudi
DESCRIPTION
The fire water supply will be designed to meet the total demand requirements of the office facility which
includes personnel from SAPMT & SEPCO.
Demand of the system will have a requirement based on the sprinkler system of 475 GPM capacity and
JO/EWO
two fire hydrant at 125 GPM capacity each. Total fire water demand of the system shall be 725 GPM.
15-Jun-15
Fire protection systems shall have the piping downstream of the fire pumps continuously maintained at a
DATE
00
NFPA 13 Table 11.2.3.1.2 – Hose Allowance and Water Supply Duration Requirements for
DISCIPLINE Hydraulically Calculated System requires a storage capacity which will be sufficient to provide fire water
ENGINEER
JJLM
for 30 minutes.
15-Jun-15
DATE:
PROJECT
Therefore, 725 GPM (45.74 L/s) = 825 gallons/minutes X 0.5 hours x 60 minutes/hour = 24,750 gallons
ENGINEER (82,332 L) of dedicated water supply for fire water shall be provided.
FDB
15-Jun-15
DATE: The demand figure generally includes allowances for leakages, hydrant flushing and other unaccounted
CERTIFIED losses.
RCJ
15-Jun-15
DATE: Fire Water Tank Sizing
CONSTRUCTION
AGENCY
The selected Fire Water Tank will be approximately 3.46m in diameter and 4.08m high, having a
DATE: nominal capacity of 32000 L.
OPERATIONS
Three (3) tank will be provided.
DATE:
The nominal capacity of the three tanks will be 96,000 L.
CONTROL NUMBER
VERIFICATION
EDSD
As per the calculation, the three (3) tank for SAPMT/SEPCO camp will be sufficient to supply
the fire water demand for 35 minutes.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FIRE WATER DEMAND CALCULATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Fire Water System Summary
ENGG CERT
RCJ
The scope of this analysis is to provide the pump size required to supply the SAPMT/SEPCO office having a
continuously maintained pressure of 125 psig. Jockey pump shall be rated at 300 gpm operating at 125
15-Jun-15
maintaining pressure.
DATE
MODEL
NO.
REV
00
FH-01
DATE: P25
SO-02 J20
CONTROL NUMBER
VERIFICATION
P16 P15
P22 P10J11
EDSD
P24
DATE:
X J17 FH-04
BY:
P13 P14
P9
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
P23
(DCC) NO. _____________________
FIRE WATER DEMAND CALCULATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Jockey Pump Operating
ENGG CERT
RCJ
X Main Pump
P30 P32
FDB
Water
Tanks
P29 P34
Jockey P49
Pump
P44
X J46 P40
X J42
DESCRIPTION
P54
ISSUED FOR CONSTRUCTION
FH-01
P53
SO-02 J35
P36 P38
P50 P42J43
P52
X J48 FH-04
P37 P39
JO/EWO
P35
P51
15-Jun-15
DATE
OUTPUT REPORT
Main Pump
NO.
REV
00
DISCIPLINE
ENGINEER
JJLM
15-Jun-15
DATE:
PROJECT
ENGINEER
FDB
15-Jun-15
DATE:
CERTIFIED Jockey Pump
RCJ
15-Jun-15
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
SUMMARY
DATE:
CONTROL NUMBER
Pump Data
VERIFICATION
Main 1 Operating
BGCS-5 725 725 725 92.30 8.896 73.29
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Pump 1 Standby
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Site
OF THIS DRAWING IS COVERED, FOR ALL
Jockey 1 Operating
Office 300 300 300 89.10 9.341 29.28
(DCC) NO. _____________________
Pump 1 Standby
FIRE WATER DEMAND CALCULATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION