Calculation: Fire Water Demand - Sapmt/Sepco Site Office: Saudi Arabian Oil Company

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 5

Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

RCJ
FDB
DESCRIPTION

ISSUED FOR CONSTRUCTION

CALCULATION: FIRE WATER DEMAND –


SAPMT/SEPCO SITE OFFICE
JO/EWO

SAPMT & SEPCO RESIDENTIAL CAMP


AND PROJ. SUPPORT BLDG (BGCS-5)
15-Jun-15
NO. DATE
REV

00

DISCIPLINE
ENGINEER
JJLM
15-Jun-15
DATE:
PROJECT
ENGINEER
ISSUED FOR CONSTRUCTION
FDB
15-Jun-15
DATE:
CERTIFIED
RCJ

DATE:
15-Jun-15 June 15, 2015
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

PREPARED BY:
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

FIRE WATER DEMAND CALCULATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SAPMT/SEPCO SITE OFFICE (BGCS-5) CAL


K53 SK-5-A-018 1
SAPMT & SEPCO RESIDENTIAL CAMP AND PROJECT SUPPORT BUILDING A OF 00
YANBU SAUDI ARABIA JO / EWO: 10-01282-003 5
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

RCJ

TABLE OF CONTENTS
FDB

1.0  INTRODUCTION ............................................................................................................... 3 
2.0  OBJECTIVE ........................................................................................................................ 3 
  Fire Water Distribution System ................................................................................... 3 
  Fire Water Demand for SAPMT/SEPCO SITE OFFICE ............................................ 3 
DESCRIPTION

  Fire Water Tank Sizing ................................................................................................ 3 


ISSUED FOR CONSTRUCTION

  Fire Water System Summary ....................................................................................... 4 


3.0  HYDRAULIC ANALYSIS ................................................................................................. 4 
JO/EWO
15-Jun-15
NO. DATE
REV

00

DISCIPLINE
ENGINEER
JJLM
15-Jun-15
DATE:
PROJECT
ENGINEER
FDB
15-Jun-15
DATE:
CERTIFIED
RCJ

15-Jun-15
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

FIRE WATER DEMAND CALCULATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SAPMT/SEPCO SITE OFFICE (BGCS-5) CAL


K53 SK-5-A-018 2
SAPMT & SEPCO RESIDENTIAL CAMP AND PROJECT SUPPORT BUILDING A OF 00
YANBU SAUDI ARABIA JO / EWO: 10-01282-003 5
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0 INTRODUCTION
ENGG CERT

RCJ

This Construction Facility, with all included tools and equipment, is considered property of the Contractor
throughout the period of the contract.
FDB

2.0 OBJECTIVE

The scope of this document is to calculate and evaluate the fire water demand for the SAPMT/SEPCO Site
Office Facilities located at Pump Station No.5.

The design basis for the estimation of fire water demand is based on applicable Saudi Aramco Standards
(SAES-S-040, Saudi Aramco Water System, SAES-B-017, Fire Water System Design and SAES-M-100, Saudi
DESCRIPTION

Aramco Building Code).


ISSUED FOR CONSTRUCTION

 Fire Water Distribution System

The fire water supply will be designed to meet the total demand requirements of the office facility which
includes personnel from SAPMT & SEPCO.

 Fire Water Demand for SAPMT/SEPCO SITE OFFICE

Demand of the system will have a requirement based on the sprinkler system of 475 GPM capacity and
JO/EWO

two fire hydrant at 125 GPM capacity each. Total fire water demand of the system shall be 725 GPM.
15-Jun-15

Fire protection systems shall have the piping downstream of the fire pumps continuously maintained at a
DATE

minimum of 875 kPag (125 psig).


NO.
REV

00

NFPA 13 Table 11.2.3.1.2 – Hose Allowance and Water Supply Duration Requirements for
DISCIPLINE Hydraulically Calculated System requires a storage capacity which will be sufficient to provide fire water
ENGINEER
JJLM
for 30 minutes.
15-Jun-15
DATE:
PROJECT
Therefore, 725 GPM (45.74 L/s) = 825 gallons/minutes X 0.5 hours x 60 minutes/hour = 24,750 gallons
ENGINEER (82,332 L) of dedicated water supply for fire water shall be provided.
FDB
15-Jun-15
DATE: The demand figure generally includes allowances for leakages, hydrant flushing and other unaccounted
CERTIFIED losses.
RCJ

15-Jun-15
DATE:  Fire Water Tank Sizing
CONSTRUCTION
AGENCY
The selected Fire Water Tank will be approximately 3.46m in diameter and 4.08m high, having a
DATE: nominal capacity of 32000 L.
OPERATIONS
 Three (3) tank will be provided.
DATE:
 The nominal capacity of the three tanks will be 96,000 L.
CONTROL NUMBER
VERIFICATION


EDSD

As per the calculation, the three (3) tank for SAPMT/SEPCO camp will be sufficient to supply
the fire water demand for 35 minutes.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

FIRE WATER DEMAND CALCULATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SAPMT/SEPCO SITE OFFICE (BGCS-5) CAL


K53 SK-5-A-018 3
SAPMT & SEPCO RESIDENTIAL CAMP AND PROJECT SUPPORT BUILDING A OF 00
YANBU SAUDI ARABIA JO / EWO: 10-01282-003 5
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 Fire Water System Summary
ENGG CERT

RCJ

No. Description Result


FDB

1 Total Firewater Demand 82,232 liters


2 Storage Tank Nominal Capacity 96,000 liters
3 Storage Tank Working Capacity 86,877 liters
4 Number of Tanks Required (3) Three tank
5 Tank Dimensions 3.46m dia. x 4.08m high
Water Transmission Line and Pumping
6 725 gallons per minute
DESCRIPTION

Capacity (See Note-1)


ISSUED FOR CONSTRUCTION

Material Class: 1LC0U


7 Pipeline (Pump Facility)
Pipe Material: Cement Lined CS
Pipeline (Distribution Network) Material Class: 1FE0U
8
Pipe Material: RTR
9 Pipeline Size 8-inch

3.0 HYDRAULIC ANALYSIS


JO/EWO

The scope of this analysis is to provide the pump size required to supply the SAPMT/SEPCO office having a
continuously maintained pressure of 125 psig. Jockey pump shall be rated at 300 gpm operating at 125
15-Jun-15

maintaining pressure.
DATE

MODEL
NO.
REV

00

DISCIPLINE Main Pump Operating


ENGINEER
JJLM
Main Pump
15-Jun-15 P2 P3
DATE:
PROJECT
ENGINEER Water
Tanks
FDB P1 P6
15-Jun-15
DATE: X Jockey P21
CERTIFIED Pump
RCJ
J26 X J27 FH-04 SO-01 FH-02
P4 P5
15-Jun-15 P27 P28
DATE:
CONSTRUCTION
AGENCY P12
X J14 P8
X J8
P26
DATE: P11 P7
J23 J22
OPERATIONS P20 P19 P18 P17

FH-01
DATE: P25
SO-02 J20
CONTROL NUMBER
VERIFICATION

P16 P15
P22 P10J11
EDSD

P24
DATE:

X J17 FH-04
BY:

P13 P14
P9
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

P23
(DCC) NO. _____________________

FIRE WATER DEMAND CALCULATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SAPMT/SEPCO SITE OFFICE (BGCS-5) CAL


K53 SK-5-A-018 4
SAPMT & SEPCO RESIDENTIAL CAMP AND PROJECT SUPPORT BUILDING A OF 00
YANBU SAUDI ARABIA JO / EWO: 10-01282-003 5
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Jockey Pump Operating
ENGG CERT

RCJ

X Main Pump
P30 P32
FDB

Water
Tanks
P29 P34

Jockey P49
Pump

J52 X J53 FH-04 SO-01 FH-02


P31 P33
P55 P56

P44
X J46 P40
X J42
DESCRIPTION

P54
ISSUED FOR CONSTRUCTION

J51 P43 P41 J50


P48 P47 P46 P45

FH-01
P53
SO-02 J35
P36 P38
P50 P42J43

P52
X J48 FH-04
P37 P39
JO/EWO

P35

P51
15-Jun-15
DATE

OUTPUT REPORT

Main Pump
NO.
REV

00

DISCIPLINE
ENGINEER
JJLM
15-Jun-15
DATE:
PROJECT
ENGINEER
FDB
15-Jun-15
DATE:
CERTIFIED Jockey Pump
RCJ

15-Jun-15
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

SUMMARY
DATE:
CONTROL NUMBER

Pump Data
VERIFICATION

No. of Total Selected GPM Diff Power


EDSD

Description Pump NPSHA


Pumps Capacity Head Rating
Operating Standby (m)
DATE:

Required (m) (HP)


BY:

Main 1 Operating
BGCS-5 725 725 725 92.30 8.896 73.29
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Pump 1 Standby
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Site
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Jockey 1 Operating
Office 300 300 300 89.10 9.341 29.28
(DCC) NO. _____________________

Pump 1 Standby

FIRE WATER DEMAND CALCULATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SAPMT/SEPCO SITE OFFICE (BGCS-5) CAL


K53 SK-5-A-018 5
SAPMT & SEPCO RESIDENTIAL CAMP AND PROJECT SUPPORT BUILDING A OF 00
YANBU SAUDI ARABIA JO / EWO: 10-01282-003 5
EDSD/2616-0399.doc