33kV CT Test Report

Download as docx, pdf, or txt
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 2

33kV CT Test Report Page 1 of 2

Customer Bangladesh Power Development Board (BPDB)


Project DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF
33/11KV NEW 2X10/13.33MVA AT SANTAHAR AT BOGRA AIS SUB
STATION, RAJSHAHI ZONE. (PACKAGE NO-AIS-3)
Contract Contract No-10349,DTD-28.12 2017
Substation Shantahar 33/11kV Substation
Location/Feeder T2 Transformer

Equipment Data

Manufacturer Mehru Electrical & Mechanical


Serials
Engineers (P) Ltd., India
Type Live Tank R OC-8644/6/1/19
Standard IEC 61869 Y OC-8879/6/2/19
Rated Current 400-200/5/5/5A B OC-8879/6/1/19
Insulation Level 70/170kV
Short Time Current 25kA 3s

Core 1 Core 2 Core 3


Ratio 200-400/5A 200-400/5A 200-400/5A
Burden VA 30 30
Output Class 0.2 5P20 PS

Primary injection Test


1S1 – 1S3 = 400/5A
2S1 – 2S3 = 400/5A
3S1 – 3S3 = 400/5A

Primary Current Secondary Actual


Core CT Ratio Error
Phase Current Current Current
R 400 A 4.86 5 0.14
1S1 – 1S3 Y 400 A 4.88 5 0.12
B 400 A 4.86 5 0.14
80
R 400 A 4.87 5 0.13
2S1 – 2S3 Y 400 A 4.84 5 0.16
B 400 A 4.88 5 0.12

Core Allocation Test

Core Allocation Setting core Star point


Core
Phase Status
R OK 1S1-1S3 1S3
1S1 – 1S3 Y OK For
B OK METERING
R OK 2S1-2S3 2S3
2S1 – 2S3 Y OK For
For SEA/AKES B For SWPLOK For BPDB/NESCO
Protection Date:
30/01/2020
3S1-3S3 SPARE
33kV CT Test Report Page 2 of 2

Customer Bangladesh Power Development Board (BPDB)


Project DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF
33/11KV NEW 2X10/13.33MVA AT SANTAHAR AT BOGRA AIS SUB
STATION, RAJSHAHI ZONE. (PACKAGE NO-AIS-3)
Contract Contract No-10349,DTD-28.12 2017
Substation Shantahar 33/11kV Substation
Location/Feeder T2 Transformer

CT winding resistance test

Core Ratio Phase Resistance(Ω)


R .25
1S1 – 1S2 200 Y .25
B .26
R .5
1S1 – 1S3 400 Y .5
B .5
R .26
2S1 – 2S2 200 Y .25
B .25
R .80
2S1 – 2S3 400 Y .80
B .80

For SEA/AKES For SWPL For BPDB/NESCO Date:


30/01/2020