Chapter-I of Draft EIA / EMP Report
Chapter-I of Draft EIA / EMP Report
Chapter-I of Draft EIA / EMP Report
CHAPTER-I
INTRODUCTION
Table - 1.1
Project proposal
S. No. Units Total Proposed Capacity
1. Grain based Distillery 125 KLPD
2. Malt Spirit Plant 25 KLPD
3. Co-generation Power Plant 4.5 MW
4. IMFL /CL bottling unit 12000 cases/day
B. Screening Category
As per EIA Notification dated 14th Sep., 2006 and its subsequent amendments; the project falls
in Category ‘A’, Project or Activity - 5(g)(ii)[All non-molasses based distillery ≥ 60 KLPD]
C. Status of the Proposed Project with respect to Environment Clearance
The chronology of the project activities undertaken so far with respect to the process of getting
EC is given in the table below:
Table: 1.2
Status of the Proposed Project with respect to Environment Clearance
Application submission in MoEFCC 16th February,2018
Tor Letter issued by the MoEFCC, New Delhi vide letter no 24th March, 2018
IA-J-11011/58/2018-IA II (I)
Baseline data collection study period Summer Season (March to May, 2018)
1.3 BRIEF DESCRIPTION OF NATURE, SIZE, LOCATION OF THE PROJECT AND ITS IMPORTANCE TO THE
COUNTRY, REGION
1.3.1 Brief Description of Nature, Size and Location of Project
Brief Description of Nature, Size and Location of the Project is given in Table below.
Table- 1.3
Brief Description of Nature, Size and Location of the Project
S. NO. PARTICULARS DETAILS
A. Proposed grain based distillery, malt spirit plant and co-generation
Nature of the Project
power plant
B. Units Proposed Capacity
Grain based Distillery 125 KLPD
Size of the Project Malt Spirit Plant 25 KLPD
Co- generation Power Plant 4.5 MW
IMFL/CL bottling unit 12000 cases per day
G. Location details
Village Chiraura
Tehsil Akbarpur
District Kanpur Dehat
State Uttar Pradesh
Latitude 26°25'07.05"N to 26°25'19.89"N
Longitude 80° 06'14.28"E to 80° 06'27.92"E
Topo sheet No. G 44I3 & G 44I2
Table-1.4
Scope of the study
Chapter Description
Chapter-1 Introduction
Chapter-2 Project Description
Chapter-3 Description of the Environment
Chapter-4 Anticipated Environmental Impacts and Mitigation Measures
Chapter-5 Analysis of Alternatives (Technology & Site)
Chapter-6 Environmental Monitoring Program
Chapter-7 Additional Studies
Chapter-8 Project Benefits
Chapter-9 Environment Cost Benefit Analysis
Chapter- Environmental Management Plan
10
Chapter-11 Summary & Conclusion
Chapter-12 Disclosure of Consultants Engaged