Risk Assessment/Management Form

Ref:
Section / Dept: civil Activity: Risk Assessment for shifting of Location / Area :
Contractor :- M/S Simplex Infrastructures Truss by double hydra
Limited

bility
Sl Basic Job Potential Consequenc Current control measure Initial Addition Ri

Resid
bility

ual
Risk rating

risk
Proba

Proba
No. Steps Hazard e Risk al s
control k
P E A R measur raP E A R
e ti
Only skilled &experienced work men deployed in the n
job with safety shoe ,hand gloves ,safety helmet and g
Get Injury/ tested tools &tackles. Use guide rope during shifting
Fall of materials of materials and always keep away from swing 1 0 0 1 3 6
Fatality
area.Daily tool box talk before starting of job by crew
supervisor.

All the wire rope sling & D-shackle visually checked .


Failure of wire rope Tested sling are colour coaded by a specific colour
Get Injury .Daily tool box talk before starting of job by crew 2 0 0 1 2 4
sling/D-shackle
supervisor.
Skilled workmen shall be engaged for hooking of
material.Hook of hydra must be provided with hook
Hooking of material Get injury latchaily tool box talk before starting of job by crew 2 0 0 0 2 4
supervisor.
People should maintain safe distance from the load
while lifting and shifting.Guied rope to be fixed on both
ends of the material.Communication with the hydra
operator will be one to one talk and signal will be
issued by the signal man with blue helmet.

Shifting of Shifting of material by double hydra will be carried out


theGallery by during day time only and both the hydra operators,site
1 Get injury 1 0 0 0 2 2
Double Hydra engineer,safety officer and the Rigger will inspect the
up to max.5 MT shifting route first.
After the prior permission of area incharge and safety
Manager/Dy manager of LIPL the job will start

The weight of the lifting materials should not exceed


5MT
Shifting area should be of suitable for approach
People should not unhook the sling during tension.
Unhooking of
Injury to person Only skilled person will remove the sling from the 1 0 0 0 2 2
material hook.
Marking of SWL at different lifting hooks of hydra.
Toppling of Hydra Only Trained & experienced operator operate the
due to excess Injury / Fatality hydra.Material above the safe working load mentioned 2 0 0 1 2 4
loading at the lifting position shall not be lifted.
One signal man will communicate both the hydra
operators and minimum 8persons will be engaged for
the job by the contractor
Man/Materials
Traffic Control 1 0 0 1 2 2
loss The person includes-site engineer,2nos hydra
operators,1no.signal man,one rigger,Safety Manager
and 2nos.hydra helpers
EXTRA PRECAUTIONS FOR 1) During turning both hydra to be
SHIFTING OF 10MT GALLERY stopped,repositioned and make the gallery straight
& then proceed the shifting
2) During entire shifting both hydra & the gallery
should be in a straight line

Prepaired by Approved by Reviwed by


Contractor Contractor LPIL
Date Date Date

1of1