The following item of Building SoR w,e,f, 1,11212020 is ammended as under, This amendment shall be applicable with effect from the date
of issue of this order i.e. 29/0L/2O21,
Page 1 of 5
SOR ITEM EXISTING AMMENDMENT
NO. ITEM NAME DESCRIPTION UNIT RATE
DESCRIPTION UNIT RATE
/
)--*<' Project Director
PWD PIU Bhopal
Page 2 of 5
EXISTING
Chamfered
840.00 Providing and laying factory
edge cement chamfered edge Cement
chamfered edge Cement Concre
concrete paver paver blocks of required colour
blocks over
paver blocks in footpath, parks,
thickness pattern.
texture (smooth/ drive ways or light
and size/ shape, conforming ng etc, of required colour,
15658-2006 tS marked made by strength, thickness,
table vibratory method using pU surface texture (smooth/
laid in required colour size/shape conforming to
over 50mm thic 15558-2006 made by table
of stone dust,
compacted bed
vibratory method using pU
compacting and proper
laid in required colour & pattern
laying of inter locki
blocks into the bedding 50mm thick compacted bed
through vibratory compaction sand, compacting and proper
using plate vibrator, filling the embedding/laying of inter
with sand and cutting blocks into the sand
blocks as per required layer through vibratory
pattern. finishing compaction by using plate vibrator,
sweeping extra sand incl
filling the joints with sand and
edges in 0.30 mm
porch with of paver blocks as
M I
cement concrete in foot path, uired size and pattern, finishing
parks, lawns, drive ways or light and sweeping extra sand i
traffic parking etc. complete as per locking edges with Mj.5 cement
in foot path, parks, lawns,
of Engineer-inCharge. drive ways or light traffic parki
etc. complete as
manufacturer's specifications and
Page 3 of 5
SOR ITEM EXISTING AMMENDMENT
NO. ITEM NAME DESCRIPT!ON UNIT RATE DESCRIPTION UNIT RATE
/* Project Director
PWD PIU Bhopal
Page 4 of 5
SOR ITEM EXISTING AMMENDMENT
NO. ITEM NAME DESCRIPTION UNIT RATE DESCRIPTION UNIT RATE
PROJECT DIRECTOR
PWD PIU BHOPAL
Page 5 of 5
OFFICE OF THE PROJECT DIRECTOR
MPPWD (PIU) NIRMAN BHAWAN,BHOPAL
SCHEDULE OF RATES FOR BUILDING WORKS (w.e.f.0r.12.2020 )
( ERRATA/AMM EN DM ENT/ADDENDUM NO. 01")
The following SOR item of Building SOR w.e.f. l/72/2O2O is Addendum as under and shall be applicable with
effective from the date of issue of the order i.e, 29 101,/2027
t 2 3 4 5 6
4.26 RCC for Providing and laying cement concrete in Sunken cum 31.41
sunken floors of WC, Toilets, Wash Areas etc with
floor 1;5:10 (1 cement : 5 coarse sand (zone-lll) : 10
graded stone aggregate 40 mm nominal size). ,
excluding the cost of centering and shuttering.