Udpfi Guidlines For Housing
Udpfi Guidlines For Housing
The use, coverage, FAR set backs, open space, height, number of dwelling units, parking
standards for residential premises on plotted development, group housing, resettlement and
Jhuggi Jhonpri insitu upgradation and non-residential premises shall be as per the provisions
contained in Master Plan/Zonal Plan/Development Code or as per simplified Development
Promotion Regulations of the Urban Development Plan Formulation and Implementation
Guidelines and where these are silent on such issues or which require interpretation the norms
as decided by the Authority, shall apply.
The permission of uses/use activities in use premises shall permitted in accordance with
provisions of Master Plan/Zonal Plan/Layout Plan.
The object of these regulations is to provide control for building/buildings within use premises
excluding the internal arrangement, which is covered and controlled by Building Bye-Laws.
General Notes
The premises for which building regulations have not been given shall be examined by the
Authority on the basis of actual requirements and other relevant factors.
SPECIFIC PREMISES
Plotted Development
The layout plans for residential scheme are formulated keeping in view (1) that there would be
sufficient light and air in the buildings when constructed (2) that there would be protection
against noise, dust and local hazards (3) that there would be sufficient open space for various
family needs (4) that the circulation and access is easy and is safe from accident point of view
(5) that, as far as possible, the plots are of regular shape and size and (6) these are logically
arranged in a systematic manner so as to give a regular pattern of development in the form of
row houses, detached and semi-detached houses and if necessary the regular bungalow type
plots.
Group Housing
The number of dwelling units are calculated on the basis of the density pattern given in the
development plan, taking into consideration a population of 4.5 persons per dwelling unit.
125 (higher FAR may be given depending on the pattern of development and should not
exceed 150)
15 m. (for plot sixes upto 4000 sq m.) and 26 m. for plots above 4000 sq m.
15 m. for all size of plots.
To be calculated on the basis of the net plot area of a particular neighbourhood. This may vary
between 50 DUs. to 124 DUs. per ha.
Residential Density:
Dwelling Density:
The number of dwelling units per acre of net residential land. (land devoted to residential
buildings and accessory uses on the same lots, such as informal open spaces, drives, service
areas, excluding land for streets, public parking, playgrounds and non residential buildings.
Neighbourhood density:
The number of dwelling units per acre of total neighborhood land (new residential
land plus streets and land used for schools recreation and other community purpose.)
3.Net dwelling density for one and two family dwelling units:
Dwelling type Lot size or equivalent ,ft Net residential area per
family ,Sq.ft
One -family detached 60 x 80 6000
One -family semidetached 80 x 100 for 2 families 4000
Two - family detached 80 x 100 for two families 4000
One - family attached 20 x 100 plus 40-ft side yard 2400
between each ten units
Open space(OS):
Open space is the sum of the uncovered open space and one half of the covered open
space.
Uncovered open space:
The horizontal area of the site not covered by building area
Is the uncovered open space.
OSR = OS/LA
LSR = LS/LA
Recreational space(RS):
It is the private or public exterior area improved for recreation of all residents , having the least
dimension of 50 ft and a minimum area of 10,000 Sq.ft.
STANDARD VALUES FOR THE ABOVE RATIOS FOR RESPECTIVE LAND USE INTENSITY:
Children’s Recreation
Minimum Distance of (5-13Years) Play 1300ft
Area From Dwelling
Minimum Walking Distance To ¼ - ½ mile
Playground
Adult Recreation
Minimum Walking Distance To Athletic 1-1/4mile
Play Field
Minimum Walking Distance To Park ¼-1/2mile
Infant Recreation
Preschool Children’s Play Area
From Dwelling. Adjacent
Play Areas (2-6Yrs) From face of Buildings.
300-400ft
COMMUNITY FACILITIES:
1.Educational facilities:
Nursery school:
Number of children – 3.25 / household
Additional facilities:
Play lot.
Accessible by footpaths from dwelling units without crossing streets.
Elementary school:
Additional facilities:
High school
Radius of area to be served: ½ mile – ¾ mile
3.RECREATIONAL FACILITIES:-
Infant Recreation
Preschool Children’s Play Area Per
100 Dwellings 2500sq.ft
Preschool Children’s Play Area Per
Bedroom 10sq.ft
Play Areas (2-6Years) Per Child 50sq.ft
Play Areas (2-6Years) Per Family 12-15sq.ft
Children’s Recreation
Minimum Size For Playground Areas 3.25acres
For 2000 Population
Minimum Size For Playground Areas 4.00acres
For 3000 Population
Minimum Size For Playground Areas 5.00acres
For 4000 Population
Minimum Size For Playground Areas 6.00acres
For 5000 Population
Minimum Play Area For 30 Children 1500sq.ft
Minimum Play Area For 100 Children 5000sq.ft
Adult Recreation
Maximum For Each Bedroom For School 2000sq.ft
age And Adult Recreation
For Projects Over 100 Bedrooms Add 50sq.ft
HOUSING CODES
The housing code generally defines the precise conditions for legal
occupancy of dwelling units and, in most but not all cases, prescribes the manner in which
compliance with locally adopted requirements is to be obtained.
Similarly to building codes, four basic model housing codes have been
developed. They are:
The southern standard housing code, The southern standard housing code
conference ( S S B C C )
In general there is a reasonable uniformity among most of the codes relative to occupancy
requirements.
Dwelling unit occupancy requirements, four national model housing codes(floor area in sq.ft)
There is a great discrepancy in the current standards for the total floor area requirements.
Minimum total floor area ( sq.ft )
For 1 person 400
For 2 persons 750
For 3 persons 1000
For 4 persons 1150
For 5 persons 1400
For 6 persons 1550
1 2 3 4 5
CODE PERSONS PERSONS PERSONS PERSONS PERSONS
APHA-PHS 150 250 350 450 550
BOCA 150 250 350 450 550
ICBO 200 200 290 330 380
SSBCC 150 250 350 450 525
The amount of floor space required in habitable rooms is 150 sq.ft for the first
person and 100 sq.ft more for each additional person.
If no of occupants five or more the additional space required for each occupant is
75 sq.ft.
The minimum amount of habitable space in the dwelling unit can be determined
that 200 sq.ft. for one or two person occupancy of a dwelling unit.
Two persons may occupy a two-room dwelling unit with 200 sq.ft of habitable
space distributed as follows:
Three persons may occupy a two-room dwelling unit with 290 sq.ft of habitable space
distributed as follows:
Four persons may occupy a three-room dwelling unit with 330 sq.ft of habitable space
distributed as follows:
Kitchen & living 150 sq.ft
Bed room (double occupancy) 90 sq.ft
Bed room (double occupancy) 90 sq.ft
330 sq.ft
Five persons may occupy a three-room dwelling unit with 380 sq.ft of habitable space
distributed as follows:
The APHA-PHS, BOCA, & SBCC Says Sleeping room requires 70 sq.ft of habitable
floor space to be occupied by one person.
The ICBO requires that a room used for sleeping should have not less than 90
sq.ft. of floor space and may be occupied by two persons.
The APHA-PHS housing code requires at least 120 sq.ft for two persons.
The BOCA & SBCC requires only 100 sq.ft. SBCC code allows two persons
under 12 years to occupy a sleeping room with but 70 sq.ft requiring only 35 sq.ft per child.
If the bed room is occupied by three persons the APHA-PHS Requires 170 sq.ft
of habitable floor space, the BOCA & SBCC codes 150sq.ft if occupants are older than 12.
The ICBO code permits three persons to occupy a sleeping room with 140
sq.ft of floor space.
BATHROOM FACILITIES
The substantive provision that shows the greatest uniformity in the codes is
the bathroom facilities requirement. All the housing codes require a private flush toilet, a
lavatory sink, and a bath tub or shower with hot and cold running water under pressure. These
facilities, located inside the dwelling unit, constitute minimum requirements for sanitary housing.
ELECTRICAL SERVICE AND FACILITIES
The requirement that dwelling units be provided with electrical service if the connection is
available within a reasonable or specified distance(usually 300ft) from the dwelling unit is
basic.
The APHA-PHS housing code requires an electrical service,outlets and or fixtures capable of
providing 3w of electrical power per square foor\t of the total area.
Each dwelling unit must have atleast one 15-A and such circuit should not be shared
with another dwelling unit.
Temporary wiring or extension cords should not be used as permanent wiring.
Every habitable room including toilets and bathrooms should be provided with either
a ceiling or wall type electric light fixture.
All electric lights and fixtures provided in the bathrooms should be controlled by
switches which are designed to minimize electric shock.
Every habitable rooms must have atleast two wall type electric convenience duplex
outlets.
LIGHTING
Day lighting for habitable rooms is minimum requirements of code. most codes require need at
least one window per habitable room and stipulate the number of minimum area to be
provided .
Most housing codes require artificial lighting to all habitable rooms, and areas such as
bathrooms hallways etc.this specification is usually represented in the percent of floor areas of
the rooms to be day lighted. the minimum total widow or skylight area measured between the
stops for every habitable rooms should be atleast 10% of the total floor area.
VENTILATION
All housing codes require natural ventilation for all habitable rooms and bathrooms. But some
permit mechanical ventilation. The most common specification is that 45%of window area must
be openable.
Exit should be remote from each other. The distance between two exits should not
be greater than 60m.
Two interior staircase such as the scissors staircase can be used when arrangement of
the corridor system is similar to the design shown. since the Stair and wall construction separates
the two stairs, the construction should not allow the passage of smoke from one to other.
Dead end corridors can be used when the length of the corridors is small.
CENTRAL STAIR
The central stair is an undesirable escape strategy because the corridors become smoke filled.
REMOTE STAIRS
Stairway located at the ends of corridor can offer alternate escape routes and shorter travel
distance to most occupants.
EXTERIOR ESCAPES
Protected outdoor stairway exit can provide smoke free escape routes.
There are alternate routes to remotely located stairs.
Maximum distance of travel from the door of any dwelling unit to the door opening to any exit
in the same storey should be 50ft.
The basic fire safety principles that has to be used in the design of an single family
home are
Two ways out should be provided from all living and sleeping rooms, the second
means of escape may be the suitable window
The spatial arrangement should minimize the spread of smoke, particularly from living
and other utility space to the sleeping room.
The construction should minimize the the development for spread of fire.
Automatic smoke detectors must be used to safeguard the means of escape from
bedrooms.
SITE SECURITY
Symbolic barriers define areas or relate them to particular building without physical preventing
intrusions. the success of symbolic versus real barriers in restricting entry rests on four conditions
The capacity of the inhabitants or their agents to maintain controls and reinforce the
space definition as symbolically expressed.
The capacity of the defined space to require the intruder to make obvious his or her
intentions.
The capacity of the inhabitants or their agents to challenge the presence of the
intruder and to take subsequent action.
Normally the first priority in the multi family housing is the protection of the individual dwelling
unit against burglary.
In any systems doors windows and other and other means of possible access should be
analyzed as total systems, comprised of their frames locks and other accessories.
EXTERIOR DOORS
All outdoor doors including the back door should be able to withstand the degree of attack
anticipated.
Where security problems are very serious doors with glass panels should not be used. All exterior
solid core construction with a minimum thickness of 1¾ inches.
If panel doors are desired the panel thickness should be minimum of ½ inch thickness.
Door hinges should be of heavy duty construction and located inner side of the doors so that
burglars cannot remove the entire door.
Door locks are the one element in the entire security picture about which a standard
recommendation can most validly be made for every multiple housing project. Every exterior
dwelling unit should be equipped with a dead bolt mortise lock with a throw of atleast 1inch.
Door frame is often overlooked as a component of the security of the complete door systems.
All frames shall be of heavy duty construction. Metal covered wooden frames provided
optimum cost effectiveness.
WINDOWS
The dwelling unit windows are vulnerable to attack are those situated in the first floor
or accessible from the ground.
The only reliable window locks are those key operated variety. However such locks
provide problems of fire safety.
Gates locks and grilles afford reliable protection for vulnerable windows where
security problems are great. such fixtures should be of heavy duty construction should be
securely attached with machines are round headed bolts which cannot be easily removed.
ELECTRONIC ALARM SYSTEMS
The above said measures can be reinforced with electronic alarm systems.
Types of alarm systems
Alarm devices can be divided into two categories contact devices and motion devices. in
simple terms contact devices are mechanical switches which detect the movement of doors
or windows. Foil strips are related to a mechanism to detect breakage of door and window
glass.
Motion detecting systems include seismographic devices, photoelectric cells, and ultrasonic
detectors.
The fire department is severely hampered if it cannot gain rapid access to the building in which
fire is there. The follo0wing are guidelines for streets and access to buildings.
The developed areas should be accessible from atleast two separate connecting
points or one connecting roadway of divided design.
Streets should be paved and be capable of supporting heaviest load permitted.
Total street width should provide a 22ft. clear excluding of the parking.
Intersection should have minimum curb radius of 20ft.
Grades should not exceed 10% grades of 15%are permitted for distance less than
600ft.
Fences should have gates to provide access to the rear side buildings.
WATER SUPPLY CRITERIA
An inadequate water supply for fire fighting may result in loss of life and property. The
following minimum fire flow should be available at a residual pressure of 20lb/insq.
Piping should be lined as required to resist corrosion and tuberculation.
Water mains should be less than 8in nominal inside diameter.
dead end mains should not exceed 600ftin length.
hydrant should be located at each street intersection.
Hydrant should be located 5ft-10ft of street or driveway pavement.
Hydrants shall not be provided 50ft close to the building to be protected.
QUANTITY OF WATER
With quality water supplies becoming more difficult to find and water demands increasing. This
limited source must be conserved.
Total 100%
FLOOR AREA
Floor area is the sum of the gross area of the several floors of a building, measured from the
exterior face of the exterior walls .it generally includes
Basement space
Elevator shafts or stairwells at each floor
Floor space in pent house
Attic space providing structural headroom of 8ft or more
Floor space in interior balconies or mezzanines
Any floor space used for dwelling.
The floor area of a building should not include
Cellar space except that cellar space used for retailing should be included for the
purpose of calculating requirements for accessory.
Uncovered steps
Accessory water tanks
Floor space used for mechanical equipments
Elevator or stair bulk heads
6. As with all other projections, there always the danger that estimates of housing
need and demand can be quite off the ark particularity if the base data are unrealistic
or inadequate or 1f the rejections are made too far ahead in time. Yet the degree of
accuracy required in forecasting housing needs is not very-high.. An indication of the
order of the magnitude will suffice in most of the cases. ·-