Responsibility Assignment Matrix: Resources Tasks To Be Undertaken
Responsibility Assignment Matrix: Resources Tasks To Be Undertaken
Client advisor A consultant providing strategic or specialist advice particularly during the early project stages.
Project Lead or Project manager The party responsible for managing all aspects of the project and ensuring that the project is https://www.designingbuildings.co.uk/wiki/Project_manager
delivered in accordance with the Project Programme.
Lead Designer The party responsible for managing all aspects of the design, including the co-ordination of the https://www.designingbuildings.co.uk/wiki/Lead_designer
design and the integration of specialist subcontractors’ design, where applicable, into the
coordinated design.
Structural Engineer Responsible for carrying out the structural engineering design. On larger projects civil engineering https://www.designingbuildings.co.uk/wiki/Structural_engineer
aspects would be undertaken by this role.
Cost Consultant The party responsible for producing Cost Information as the design progresses. This information will https://www.designingbuildings.co.uk/wiki/Cost_consultant
vary depending on the project but may include the overall Project Budget, estimates of the
construction cost and life cycle cost analysis.
Construction Lead The party responsible for constructing the project and for providing construction advice in the early
design phases. The contractor would be the construction lead at phase 4 (Technical Design). This
role has been introduced to provide flexibility regarding who performs this role prior to work
commencing on site.
Contract Administrator The party responsible for the administration of the Building Contract, including issuing of additional https://www.designingbuildings.co.uk/wiki/Contract_administrator_for_construction_contracts
instructions and the various certificates required to allow the handover and occupation of a building,
until all of the defects have been rectified and the defect period concluded.
Health & Safety Advisor Responsible for health and safety aspects as defined by legislation and in line with other project https://www.designingbuildings.co.uk/wiki/Health_and_safety_for_building_design_and_construction
objectives and health and safety best practice.
Glossary
Many terms can be found at CIOB https://www.designingbuildings.co.uk/wiki/Home
Designing Buildings Wiki:
Term Website
Appointments of designers https://www.designingbuildings.co.uk/wiki/Appointing_consultants_for_building_design_and_construction
As built information https://www.designingbuildings.co.uk/wiki/As-built_drawings_and_record_drawings
Building regulations (submission) https://www.designingbuildings.co.uk/wiki/Building_regulations
Business case https://www.designingbuildings.co.uk/wiki/Business_case_for_construction_projects
Concept Design https://www.designingbuildings.co.uk/wiki/Concept_design
Concept structural design https://www.designingbuildings.co.uk/wiki/Concept_structural_design_of_buildings
Construction costs https://www.designingbuildings.co.uk/wiki/Construction_costs
Construction programme https://www.designingbuildings.co.uk/wiki/Programme_for_building_design_and_construction
Construction site inspection https://www.designingbuildings.co.uk/wiki/Construction_site_inspection
Design Programme https://www.designingbuildings.co.uk/wiki/Design_programme
Design Responsibility matrix https://www.designingbuildings.co.uk/wiki/Design_responsibility_matrix
Detailed structural design https://www.designingbuildings.co.uk/wiki/Detailed_structural_design
Feasibility Studies https://www.designingbuildings.co.uk/wiki/Feasibility_studies_for_construction_projects
Final account https://www.designingbuildings.co.uk/wiki/Final_account
Handover https://www.designingbuildings.co.uk/wiki/Handover_construction_site_to_the_client
Handover strategy http://www.imperial.ac.uk/estates-projects/project-procedures/processes/project-management/handover-strategy/
Health and Safety https://www.designingbuildings.co.uk/wiki/Health_and_safety_for_building_design_and_construction
Interim certificates (valuations) https://www.designingbuildings.co.uk/wiki/Interim_certificates_in_construction_contracts
Maintenance https://www.designingbuildings.co.uk/wiki/Maintenance
Operation and Maintenance https://www.designingbuildings.co.uk/wiki/Building_owner%27s_manual_-_O_and_M_manual
Planning application https://www.designingbuildings.co.uk/wiki/Detailed_planning_application
Planning Authority https://www.designingbuildings.co.uk/wiki/Planning_authority
Planning permission https://www.designingbuildings.co.uk/wiki/Planning_permission
Procurement route https://www.designingbuildings.co.uk/wiki/Procurement_route
Project Brief https://www.designingbuildings.co.uk/wiki/Project_brief_for_design_and_construction
Project Budget https://www.designingbuildings.co.uk/wiki/Budget_for_building_design_and_construction_projects
Project Execution Plan https://www.designingbuildings.co.uk/wiki/Project_execution_plan_PEP
Project programme https://www.designingbuildings.co.uk/wiki/Programme_for_building_design_and_construction
Project reporting (progress) http://www.imperial.ac.uk/estates-projects/project-procedures/processes/project-management/project-reporting/
Risk assesment https://www.designingbuildings.co.uk/wiki/Risk_assessment_for_construction
Risk management https://www.designingbuildings.co.uk/wiki/Risk_management
Site information (report) https://www.designingbuildings.co.uk/wiki/Site_information_for_design_and_construction
Strategic Brief https://www.designingbuildings.co.uk/wiki/Strategic_brief_for_construction_projects
Responsibility Assignment Matrix
Phase: Strategic definition
Resources Tasks to be undertaken
Provide Business Collate Discuss initial Establish Project Collate Contribute to Comment on Provide Contribute to Discuss project Provide Contribute to Contribute to Contribute Cost
Case and other comments and considerations Programme Feedback from preparation of project Feedback from preparation of with appropriate Feedback from preparation of preparation of Information to
core project facilitate for assembling previous Strategic Brief Programme previous Strategic Brief planning previous Strategic Brief Strategic Brief preparation of
requirements workshops to the project team projects projects authority projects Strategic Brief
and contribute discuss Business
to development Case and
of Strategic Brief develop
as required Strategic Brief
with project
team members