Proposed Three-Storey Building: General Structural / Construction Notes and Specifications

The document provides general structural notes and specifications for a construction project. It outlines 10 requirements for structural materials, construction details, concrete curing, and form stripping. Key points include that all structural work must conform to the National Structural Code of the Philippines (NSCP 2001), dimensions must be verified before starting, and concrete must be kept moist for a minimum of 7 days after pouring.

Uploaded by

Angelo Amar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
334 views1 page

Proposed Three-Storey Building: General Structural / Construction Notes and Specifications

The document provides general structural notes and specifications for a construction project. It outlines 10 requirements for structural materials, construction details, concrete curing, and form stripping. Key points include that all structural work must conform to the National Structural Code of the Philippines (NSCP 2001), dimensions must be verified before starting, and concrete must be kept moist for a minimum of 7 days after pouring.

Uploaded by

Angelo Amar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL STRUCTURAL / CONSTRUCTION NOTES AND SPECIFICATIONS REPUBLIC OF THE PHILIPPINES

(A) GENERAL REQUIREMENTS OFFICE OF THE BUILDING


1. ALL STRUCTURAL MATERIALS AND WORK SHALL CONFORM TO THE REQUIREMENTS DOWEL BARS TO MATCH OFFICIAL
OF THE LATEST EDITION OF THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES 7. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP AT LEAST 40 TIMES HORIZONTAL REINFORCEMENT CONSOLACION, CEBU
(NSCP 2001). DIAMETER OR 600MM WHICHEVER IS GREATER. STAGGER BOTTOM AT LEAST 1.50M FROM
SPLICES IN OTHER BOTTOM REINFORCEMENT. STAGGER SPLICES FOR TOP REINFORCEMENT 400 400 400 RECOMMENDING APPROVAL :
CHB WALL
2. VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE STARTING SIMILARLY. 100 100
WORK. NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES.

200
8. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITION AND

CHB "t"
HEAD STRUCTURAL SECTION DATE
3. NOTES AND DETAILS ON THE DRAWINGS TAKE PRECEDENCE OVER THE GENERAL SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.

100
NOTES AND TYPICAL DETAILS IN CASE OF CONFLICT. 1 - 16mm Ø VERT. BARS
CHB VERT. REINF.

200
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF 7 CONSECUTIVE DAYS APPROVED BY :
(SEE SCHED. OF REINF.)
4. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, IMMEDIATELY AFTER POURING BY THE USE OF CURING COMPOUNDS, OR OTHER APPROVED 1 - 16mm Ø VERT. BARS CHB HOR. REINF.

100
SUCH DETAILS SHALL BE THE SAME AS FOR SIMILAR WORKS SHOWN ON THE DRAWINGS. METHODS. CHB VERT. REINF. (SEE SCHED. OF REINF.)
(SEE SCHED. OF REINF.)
DOWEL BARS TO MATCH BUILDING OFFICIAL DATE
5. PIPES, DUCTS, SLEEVES, CHASES, ETC. SHALL NOT BE PLACED IN SLABS, BEAMS, OR WALLS 10. STRIPPING OF FORMS AND SHORES: HORIZONTAL
CHB HOR. REINF.
UNLESS SPECIFICALLY SHOWN OR NOTED NOR SHALL ANY STRUCTURAL MEMBER BE CUT REINFORCEMENT
(SEE SCHED. OF REINF.)
FOR PIPES, DUCTS, ETC. UNLESS SPECIFICALLY SHOWN. OBTAIN PRIOR WRITTEN APPROVAL FOUNDATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24 HRS.
FROM THE ENGINEER FOR INSTALLATION OF ANY ADDITIONAL PIPES, DUCTS,ETC. LOCATE
AND PROTECT UNDERGROUND OR CONCEALED CONDUIT, PLUMBING OR OTHER UTILITIES SUSPENDED SLAB EXCEPT WHEN
WHERE NEW WORK IS BEING PERFORMED. ADDITIONAL LOADS ARE IMPOSED. . . . . . . . . . . . . . . . . .8 DAYS
CHB "t"
6. LOCATE AND PROTECT UNDERGROUND OR CONCEALED CONDUIT, PLUMBING OR OTHER BEAMS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 DAYS
UTILITIES WHERE NEW WORK IS BEING PERFORMED.
CHB "t"
(E) CAMBER REQUIREMENTS
WALL REINFORCING AT
7. TAKE NECESSARY PRECAUTIONS TO MAINTAIN AND INSURE THE INTEGRITY OF THE WALL REINFORCING AT INTERSECTION
STRUCTURE DURING CONSTRUCTION. NEITHER THE OWNER NOR ARCHITECT/ENGINEER WILL 1. UNLESS OTHERWISE NOTED THE PLAN OR SPECIFICATION CAMERA ALL RC BEAMS AT LEAST END / DOOR OPENING
ENFORCE SAFETY MEASURES OR REGULATIONS. IT SHALL BE THE CONTRACTORS 10mm FOR EVERY 4000mm OF CLEAR SPAN EXCEPT CANTILEVERS WHICH SHALL BE 50mm
RESPONSIBILITY TO PROVIDE ADEQUATE SHORING AND BRACING OF THE STRUCTURE FOR FOR EVERY 300mm OF CLEAR SPAN.
ALL THE LOADS THAT MAYBE IMPOSED DURING CONSTRUCTION. FURTHER, THE CONTRACTOR
SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES AND SHALL BE SOLELY 2. UNLESS OTHERWISE NOTED ON THE PLANS OR SPECIFICATIONS CAMBER ALLSLABS 8mm PER
400 LAP SPLICE
RESPONSIBLE FOR CONFORMING TO ALL SAFETY AND HEALTH STANDARDS, LAWS AND 3000mm OF SHORTER SPAN AND 14mm FOR EVERY 2000mm OF SLABS CANTILEVER SPAN. CHB WALL
300
REGULATIONS.
(F) MASONRY AND CONCRETE BLOCKS
VARIES

CHB "t"
8. OBTAIN PRIOR WRITTEN APPROVAL FROM THE ENGINEER IN CASE OF CHANGES TO THE
WORKING DRAWINGS. 1. CONCRETE HOLLOW BLOCKS, UNLESS OTHERWISE SPECIFIED SHALL BE 150MM THICK LOAD

300

VARIES
BEARING BLOCKS SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 750 PSI (5.175 MPa) CHB VERT. REINF. CHB WALL

(B) DESIGN CRITERIA WHILE NON-LOAD BEARING SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 400 PSI (SEE SCHED. OF REINF.)
CHB VERT. REINF.

400 LAP SPLICE


(2.76 MPa). 16mm Ø VERTICAL CHB WALL
REINFORCEMENT (SEE SCHED. OF REINF.)
---REFER TO STRUCTURAL COMPUTATIONS

DOWEL TO MATCH
CHB VERT. BARS

DOWEL TO MATCH
CHB VERT. REINF.

CHB VERT. BARS


2. PROVIDE 1-16MMØ VERTICAL BARS AT CORNERS, INTERSECTIONS, END OF WALLS, EACH SIDE CHB VERT. REINF. DOWELS (SEE SCHED. OF REINF.)
DOWEL BARS TO MATCH
(C) FOUNDATION OF OPENINGS. (TO MATCH VERT. REINF.)
HORIZONTAL REINFORCEMENT
CHB VERT. REINF. DOWELS
1. FOOTINGS SHALL BEAR ON SOLID UNDISTURBED EARTH (CONTROLLED, COMPACTED 3. LINTEL BEAMS SHALL BEAR AT LEAST 200MM (8") ON EACH SIDE OF MASONRY WALL CHB HOR. REINF.
(TO MATCH VERT. REINF.)

STRUCTURAL FILL OR BOTH) AT LEAST 450MM BELOW LOWEST ADJACENT FINISHED GRADE. OPENING. (SEE SCHED. OF REINF.) SUSPENDED SLAB

2. FOOTING IS DESIGNED FOR ASSUMED ALLOWABLE SOIL/FOUNDATION PRESSURE OF 4. WALL REINFORCEMENT SHALL BE AS FOLLOWS:
150KPA(3,132 psf). WALL THICKNESS VERTICAL BARS HORIZONTAL BARS CHB "t"
WALL BASE REINFORCEMENT
AT FLAT FLOOR
3. SUB-GRADE PREPARATION INCLUDING DRAINAGE, EXCAVATION,COMPACTION, AND FILLING 6 IN. (150mm). . . . . . . . . . . . . . . 10MMØ @ 400 mm 10MMØ @ 600 mm TOP OF CHB AT PARAPET/
WALL REINFORCING AT CORNER
REQUIREMENTS, SHALL CONFORM STRICTLY WITH THE RECOMMENDATIONS GIVEN IN THE GRD. FLR. RAILING &
SOILS REPORT OR AS DIRECTED BY THE SOILS ENGINEER. 4 IN. (100mm). . . . . . . . . . . . . . . 10MMØ @ 400 mm 10MMØ @ 600 mm PLANT BOX
4. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING EXCAVATION HAVE BEEN 5. BLOCK WALL REINFORCEMENT BARS SHALL BE LAPPED OF 30 BARS DIAMETERS WHERE
COMPLETED AND PRIOR TO CONCRETING TO CONFIRM THE DESIGN FOUNDATION CAPACITY. SPLICED, HORIZONTAL/VERTICAL DOWELS FROM FOOTING, COLUMNS/WALLS OR SLABS
SHALL EXTEND INTO THE BLOCK WALL A MINIMUM OF 30 BAR DIAMETERS OR A MINIMUM OF
5. ROOF AND AREA DRAINAGE SHALL BE DIRECTED AWAY FROM THE FOUNDATIONS. 4OOMM WHICHEVER IS LONGER AND DOWELS TO MATCH VERTICAL REINFORCEMENTS OF
WALL.
6. EXCAVATIONS SHALL BE PROPERLY BACKFILLED. BACKFILL FOR WALLS SHALL BE PERVIOUS
MATERIAL ACCEPTABLE TO THE GEOTECHNICAL ENGINEER. DO NOT PLACE BACKFILL BEHIND (G) STRUCTURAL STEEL
WALLS BEFORE THEY HAVE ATTAINED THEIR DESIGN STRENGTH. SHORE AND PROTECT
WALLS FROM LATERAL LOADS UNTIL THE SUPPORTING MEMBERS ARE IN PLACE AND HAVE 1. ALL STRUCTURAL, STEELS SUCH AS ANGLES, WIDE FLANGE SECTIONS, PIPES STIFFENER
DEVELOPED SPECIFIED STRENGTHS. PLATES, BASE PLATES, ETC. SHALL CONFORM TO ASTM- A-36. SEE CONSTRUCTION NOTES
FOR MASONRY WALL REIN-
(D) REINFORCED CONCRETE 2. ALL STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED BASED ON THE FORCEMENT (TYPICAL)
SPECIFICATION FOR DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL GIVEN BY
1. CONCRETE SHALL BE MIXED, PROPORTIONED, CONVEYED AND PLACED IN ACCORDANCE WITH THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (NCSP).
FIN. FLR. LVL.
THE PROVISIONS SET BY THE NSCP 2015. DOWEL BARS TO MATCH
DOWEL BARS TO MATCH
3. (34
CONNECTION BOLTS ROUND, UNLESS SHOWN OTHERWISE) SHALL CONFORM TO ASTM- CHB VERT. BARS DOWEL BARS TO MATCH CHB VERT. BARS
2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS WITH A-325. ANCHOR BOLTS (EMBEDDED IN MASONRY OR CONCRETE) SHALL CONFORM TO ASTM- CHB VERT. BARS

VARIES
WHERE SLAB
CORRESPONDING MAXIMUM SLUMP AND MAXIMUM SIZE AGGREGATES AS FOLLOWS: A307 UNLESS NOTED OTHERWISE ON THE DRAWINGS. DEPRESSION OCCURS
STRUCTURAL MEMBER 28 DAY STRENGTH MAX. SLUMP MMAX.SIZE AGG.
A. SLAB ON GRADE 20.7 MPa (3,000 PSI) 100MM(4") 25MM(1") 4. ALL STRUCTURAL STEEL SHALL BE CLEAN, RUST FREE AND SHOP COATED WITH THE

30 BAR DIAMETER
30 BAR DIAMETER

30 BAR DIAMETER
B. FOOTINGS & RETAINING WALLS 20.7 MPa (3,000 PSI) 100MM(4") 19MM(3/4) N.G.L.
APPROPRIATE PAINT. STRUCTURAL STEEL AND ANCHOR BOLTS SHALL BE MINIMUM ASTM

DOWELS
300

DOWELS

DOWELS
C. COLUMNS/ SHEARWALLS 20.7 MPa (3,000 PSI) 100MM(4") 19MM(3/4) A-36 DOMESTIC, LATEST REVISION. 300 (TYP.)
(TYP.)
D. BEAMS & SLABS 20.7 MPa (3,000 PSI) 100MM(4") 19MM(3/4)

600 (MIN.)
5. NON- SHRINK GROUT- PRE-MIXED, NON METALLIC, CEMENT-BASED GROUT, MEETING THE
3. ALL REINFORCING STEEL BARS SHALL CONFORM TO ASTM A615 GRADE 40 FOR 12MMØ AND REQUIREMENT OF ASTM C827, ASTM C109 & CRD-C621, WITH A MINIMUM COMPRESSIVE FIN. FLR. LVL. FIN. FLR. LVL.
SMALLER BARS WHILE BARS 16MMØ AND LARGER SHALL BE GRADE 40. STRENGTH OF 7000psi AT 28 DAYS.

250
250
3 - 10mm Ø BOT.

250
4. ALL FABRICATION, DETAILING AND PLACING SHALL CONFORM TO THE PROVISIONS SET BY 6. PROVIDE MISCELLANEOUS PLATES, ANGLES AND ANCHORS AS SHOWN OR NOTED ON BARS
THE NSCP 2015 EDITION. DRAWINGS.
10mm Ø BOT. BARS 6 - 10mmØ BARS (AS 6 - 10mmØ BARS (AS
@ 300 O.C. SHOWN) SHOWN)
5. CLEAR DISTANCE SPACING BETWEEN PARALLED BARS IN A LAYER SHALL NOT BE LESS THAN 7. ALL CUTTING AND BLOCKING OF STEEL SHALL BE SHOWN ON SHOP DRAWINGS AND
1.50 TIMES THE NOMINAL DIAMETER OF THE BAR, OR 1.33 TIMES MAXIMUM SIZE AGGREAGATE, PERFORMED IN SHOP. 10mm Ø BOT. BARS 10mm Ø BOT. BARS 400
400 400 @ 300 O.C. @ 300 O.C.
NOR LESS THAN 38MM (1 1/2").
8. PROVIDE TEMPORARY BRACING AS REQUIRED FOR A SAFE STRUCTURE UNTIL ALL FINAL
6. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS: AT INTERIOR WALLS WITH
CONNECTIONS ARE MADE. AT EDGE / PERIMETER CHB WALL AT INTERIOR CHB WALLS
FOOTINGS (CAST AGAINST & EXPOSED TO EARTH) . . . . 75MM(3") SLAB ELEVATION DIFFERENCE
WF-1 WF-2
WHERE CONCRETE IS EXPOSED TO EARTH
BUT POURED AGAINST FORMS. . . . . . . . . . . . . . . . . . . . . . . 50MM (2")

SLAB ON GRADE. . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . 40MM (1 1/2")

COLUMN TIES OR SPIRALS AND BEAM STIRRUPS. . . . . . . 40MM (1 1/2")

SUSPENDED SLABS. . . . . . .. . . . . . . . . . . . . .. . . . . . . .. . . . . 20MM (3/4")


WALL FOOTING DETAILS (WHERE APPLICABLE)

S E A L PROJECT TITLE : APPROVED BY SHEET CONTENT: SHEET NO.:


STEVE RESTTY JAYME AS SHOWN
CIVIL/STRUCTURAL ENGINEER

PROPOSED THREE-STOREY BUILDING ALICIA SALVACION M. TERARIRAY 01


PRC NO.: 178436
REG. DATE: 11-25-2019
TIN NO.: 770637368
PTR NO.: 1036982
DATE: 11-19-2020
PLACE: MANDAUE CITY LOCATION: NANGKA, CONSOLACION, CEBU ADDRESS: JAGOBIAO, MANDAUE CITY
OWNER
S 06

You might also like