0% found this document useful (0 votes)
74 views33 pages

RYK Test Reports

This 3 sentence summary provides the high level information from the document: The document appears to be a report from NetraServ Pvt. Ltd. for their client RYK Sugar Mills in Rahim Yar Khan, Pakistan. The report contains test results for a 132/11.5 kV, 35/45 MVA generator step up transformer.

Uploaded by

Abdul Raqeeb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views33 pages

RYK Test Reports

This 3 sentence summary provides the high level information from the document: The document appears to be a report from NetraServ Pvt. Ltd. for their client RYK Sugar Mills in Rahim Yar Khan, Pakistan. The report contains test results for a 132/11.5 kV, 35/45 MVA generator step up transformer.

Uploaded by

Abdul Raqeeb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 33

 

CLIENT 
RYK Sugar Mills, Rahim 
Yar Khan 
Contractor 
NetraServ Pvt. Ltd.   
 

TRANSFORMER TEST 
REPORTS
132/11.5 kV, 35/45 MVA Generator Step Up 
Transformer 