LABORATORIUM ILMU UKUR TANAH

PROGRAM STUDI TEKNIK SIPIL


FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3. Perhitungan / Pengolahan Data Theodolite

4.3.1. Perhitungan Patok Utama Theodolite

4.3.1.1. Perhitungan Besar Sudut Datar

P0 - P1 = 320⁰ 35' 25'' - 0⁰ 0' 0'' = 320⁰ 35' 25''


P1 - P2 = 177⁰ 28' 30'' - 0⁰ 0' 0'' = 177⁰ 28' 30''
P2 - P3 = 141⁰ 0' 45'' - 0⁰ 0' 0'' = 141⁰ 0' 45''
P3 - P4 = 155⁰ 59' 25'' - 0⁰ 0' 0'' = 155⁰ 59' 25''
P4 - P5 = 158⁰ 45' 55'' - 0⁰ 0' 0'' = 158⁰ 45' 55''
P5 - P6 = 171⁰ 65' 10'' - 0⁰ 0' 0'' = 171⁰ 65' 10''
P6 - P7 = 143⁰ 3' 40'' - 0⁰ 0' 0'' = 143⁰ 3' 40''
P7 - P8 = 168⁰ 1' 30'' - 0⁰ 0' 0'' = 168⁰ 1' 30''
P8 - P9 = 159⁰ 32' 35'' - 0⁰ 0' 0'' = 159⁰ 32' 35''
P9 - P10 = 167⁰ 21' 55'' - 0⁰ 0' 0'' = 167⁰ 21' 55''
P10 - P11 = 173⁰ 57' 5'' - 0⁰ 0' 0'' = 173⁰ 57' 5''
P11 - P12 = 155⁰ 57' 20'' - 0⁰ 0' 0'' = 155⁰ 57' 20''
P12 - P13 = 166⁰ 10' 45'' - 0⁰ 0' 0'' = 166⁰ 10' 45''
P13 - P14 = 165⁰ 29' 20'' - 0⁰ 0' 0'' = 165⁰ 29' 20''
P14 - P15 = 155⁰ 24' 40'' - 0⁰ 0' 0'' = 155⁰ 24' 40''
P15 - P16 = 145⁰ 42' 55'' - 0⁰ 0' 0'' = 145⁰ 42' 55''
P16 - P0 = 206⁰ 30' 55'' - 0⁰ 0' 0'' = 206⁰ 30' 55''
2933⁰ 7' 50''
4.3.1.2. Perhitungan Koreksi Tiap Sudut

Rumus :
da = (- (∑a - (n ± 2) x 180⁰))
n
= (- ( 2933⁰ 7' 50'' - ( 17 + 2 ) x 180 ))
17
= -13.7135620915033
= -14⁰ 17' 11''

61
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P0 - P1 = 320⁰ 35⁰ 25⁰ + -14⁰ 17' 11'' = 306⁰ 52' 36''


P1 - P2 = 177⁰ 28' 30'' + -14⁰ 17' 11'' = 163⁰ 45' 41''
P2 - P3 = 141⁰ 0' 45'' + -14⁰ 17' 11'' = 127⁰ 17' 56''
P3 - P4 = 155⁰ 59' 25'' + -14⁰ 17' 11'' = 142⁰ 16' 36''
P4 - P5 = 158⁰ 45' 55'' + -14⁰ 17' 11'' = 145⁰ 3' 6''
P5 - P6 = 171⁰ 65' 10'' + -14⁰ 17' 11'' = 158⁰ 22' 21''
P6 - P7 = 143⁰ 3' 40'' + -14⁰ 17' 11'' = 129⁰ 20' 51''
P7 - P8 = 168⁰ 1' 30'' + -14⁰ 17' 11'' = 154⁰ 18' 41''
P8 - P9 = 159⁰ 32' 35'' + -14⁰ 17' 11'' = 145⁰ 49' 46''
P9 - P10 = 167⁰ 21' 55'' + -14⁰ 17' 11'' = 153⁰ 39' 6''
P10 - P11 = 173⁰ 57' 5'' + -14⁰ 17' 11'' = 160⁰ 14' 16''
P11 - P12 = 155⁰ 57' 20'' + -14⁰ 17' 11'' = 142⁰ 14' 31''
P12 - P13 = 166⁰ 10' 45'' + -14⁰ 17' 11'' = 152⁰ 27' 56''
P13 - P14 = 165⁰ 29' 20'' + -14⁰ 17' 11'' = 151⁰ 46' 31''
P14 - P15 = 155⁰ 24' 40'' + -14⁰ 17' 11'' = 141⁰ 41' 51''
P15 - P16 = 145⁰ 42' 55'' + -14⁰ 17' 11'' = 132⁰ 0' 6''
P16 - P0 = 206⁰ 30' 55'' + -14⁰ 17' 11'' = 192⁰ 48' 6''

4..3.1.3 Perhitungan Azimuth Benar Patok Utama


Rumus :
αn = ( αawal + βn + 1 ) -180◦
+
aawal / P0 = 320⁰ 35' 25''
P0 - P1 = 320⁰ 35' 25'' + 163⁰ 45' 41'' - 180⁰ = 304⁰ 21' 6''
P1 - P2 = 304⁰ 21' 6'' + 127⁰ 17' 56'' - 180⁰ = 251⁰ 39' 2''
P2 - P3 = 251⁰ 39' 2'' + 142⁰ 16' 36'' - 180⁰ = 213⁰ 55' 39''
P3 - P4 = 213⁰ 55' 39'' + 145⁰ 3' 6'' - 180⁰ = 178⁰ 58' 45''
P4 - P5 = 178⁰ 58' 45'' + 158⁰ 22' 21'' - 180⁰ = 157⁰ 21' 6''
P5 - P6 = 157⁰ 21' 6'' + 129⁰ 20' 51'' - 180⁰ = 106⁰ 41' 57''
P6 - P7 = 106⁰ 41' ### + 154⁰ 18' 41'' - 180⁰ = 81⁰ 0' 38''
P7 - P8 = 81⁰ 0' 38'' + 145⁰ 49' 46'' - 180⁰ = 46⁰ 50' 24''
P8 - P9 = 46⁰ 50' 24'' + 153⁰ 39' 6'' - 180⁰ = 20⁰ 29' 31''
P9 - P10 = 20⁰ 29' 31'' + 160⁰ 14' 16'' - 180⁰ = 0⁰ 43' 47''
P10 - P11 = 0⁰ 43' 47'' + 142⁰ 14' 31'' - 180⁰ = -38⁰ 58' 18''
= 322⁰ 58' 18''
P11 - P12 = 322⁰ 58' ### + 152⁰ 27' 56'' - 180⁰ = 295⁰ 26' 14''
P12 - P13 = 295⁰ 26' 14'' + 151⁰ 46' 31'' - 180⁰ = 267⁰ 12' 45''
P13 - P14 = 267⁰ 12' 45'' + 141⁰ 41' 51'' - 180⁰ = 228⁰ 54' 36''
P14 - P15 = 228⁰ 54' 36'' + 132⁰ 0' 6'' - 180⁰ = 180⁰ 54' 43''
P15 - P16 = 180⁰ 54' 43'' + 192⁰ 48' 6'' - 180⁰ = 193⁰ 42' 49''
P16 - P0 = 193⁰ 42' 49'' + 306⁰ 52' 36'' - 180⁰ = 320⁰ 35' 25''

61
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
e Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3.1.4. Menghitung Sudut Miring

36'' Rumus :
41'' m = 90◦ - V
56''
36'' P0 - P1 = 90⁰ - 82⁰ 20' 0'' = 7⁰ 40'
6'' P1 - P2 = 90⁰ - 80⁰ 4' 55'' = 9⁰ 55'
21'' P2 - P3 = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26'
51'' P3 - P4 = 90⁰ - 95⁰ 19⁰ 35⁰ = -6⁰ 40'
41'' P4 - P5 = 90⁰ - 90⁰ 31' 0'' = -1⁰ 29'
46'' P5 - P6 = 90⁰ - 93⁰ 28' 15'' = -4⁰ 31'
6'' P6 - P7 = 90⁰ - 96⁰ 11' 40'' = -7⁰ 48'
16'' P7 - P8 = 90⁰ - 104⁰ 56' 5'' = -15⁰ 3'
31'' P8 - P9 = 90⁰ - 101⁰ 46' 25'' = -12⁰ 13'
56'' P9 - P10 = 90⁰ - 105⁰ 55' 25'' = -16⁰ 4'
31'' P10 - P11 = 90⁰ - 94⁰ 9' 40'' = -5⁰ 50'
51'' P11 - P12 = 90⁰ - 89⁰ 21' 50'' = 0⁰ 38'
6'' P12 - P13 = 90⁰ - 96⁰ 11' 40'' = -7⁰ 48'
6'' P13 - P14 = 90⁰ - 99⁰ 36' 0'' = -10⁰ 24'
P14 - P15 = 90⁰ - 92⁰ 53' 5'' = -3⁰ 6'
P15 - P16 = 90⁰ - 90⁰ 22' 0'' = -1⁰ 38'
P16 - P0 = 91⁰ - 98⁰ 42' 55'' = -8⁰ 17'
4.3.1.5. Perhitungan Jarak Optis

Rumus :
Dopt = (Ba - Bb) x 100

P0 - P1 = ( 1.895 - 1.601 ) x 100 = 29.4


P1 - P2 = ( 1.600 - 1.360 ) x 100 = 24
P2 - P3 = ( 0.820 - 0.788 ) x 100 = 3.2
P3 - P4 = ( 0.915 - 0.873 ) x 100 = 4.2
P4 - P5 = ( 1.034 - 0.748 ) x 100 = 28.6
P5 - P6 = ( 0.704 - 0.672 ) x 100 = 3.2
P6 - P7 = ( 1.333 - 1.293 ) x 100 = 4
P7 - P8 = ( 0.873 - 0.847 ) x 100 = 2.6
P8 - P9 = ( 0.665 - 0.365 ) x 100 = 30
+ 360⁰ P9 - P10 = ( 1.738 - 1.440 ) x 100 = 29.8
P10 - P11 = ( 1.430 - 1.178 ) x 100 = 25.2
P11 - P12 = ( 1.548 - 1.508 ) x 100 = 4
P12 - P13 = ( 1.124 - 1.086 ) x 100 = 3.8
P13 - P14 = ( 0.901 - 0.861 ) x 100 = 4
P14 - P15 = ( 0.595 - 0.315 ) x 100 = 28
OK! P15 - P0 = ( 2.308 - 1.882 ) x 100 = 42.6
P16 - P1 = ( 0.985 - 0.697 ) x 100 = 28.8

61
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
ate Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3.1.6. Perhitungan Jarak Datar Patok Utama


Rumus :
D = Doptis . Cos2 . m

P0 - P1 = 29.4 . Cos2 7⁰ 40' 0'' =


0'' P1 - P2 = 24 . Cos2 9⁰ 55' 5'' =
5'' P2 - P3 = 3.2 . Cos2 -3⁰ 26' 0'' =
0'' P3 - P4 = 4.2 . Cos2 -6⁰ 40' 25'' =
25'' P4 - P5 = 28.6 . Cos2 -1⁰ 29' 0'' =
0'' P5 - P6 = 3.2 . Cos2 -4⁰ 31' 45'' =
45'' P6 - P7 = 4 . Cos2 -7⁰ 48' 20'' =
20'' P7 - P8 = 2.6 . Cos2 -15⁰ 3' 55'' =
55'' P8 - P9 = 30 . Cos2 -12⁰ 13' 35'' =
35'' P9 - P10 = 29.8 . Cos2 -16⁰ 4' 35'' =
35'' P10 - P11 = 25.2 . Cos2 -5⁰ 50' 20'' =
20'' P11 - P12 = 4 . Cos2 0⁰ 38' 10'' =
10'' P12 - P13 = 3.8 . Cos2 -7⁰ 48' 20'' =
20'' P13 - P14 = 4 . Cos2 -10⁰ 24' 0'' =
0'' P14 - P15 = 28 . Cos2 -3⁰ 6' 55'' =
55'' P15 - P16 = 42.6 . Cos2 -1⁰ 38' 0'' =
0'' P16 - P0 = 28.8 . Cos3 -8⁰ 17' 5'' =
5'' 4.3.1.7. Perhitungan Dsin dan Dcos Patok Utama (Dx dan Dy) ∑D =
A. Menghitung Dx
Rumus :
Dx = D sin a
P0 - P1 = 28.9 Sin 320⁰ 35' 25'' =
P1 - P2 = 23.3 Sin 304⁰ 21' 6'' =
m P2 - P3 = 3.2 Sin 251⁰ 39' 2'' =
m P3 - P4 = 4.2 Sin 213⁰ 55' 39'' =
m P4 - P5 = 28.6 Sin 178⁰ 58' 45'' =
m P5 - P6 = 3.2 Sin 157⁰ 21' 6'' =
m P6 - P7 = 4.0 Sin 106⁰ 41' 57'' =
m P7 - P8 = 2.4 Sin 81⁰ 0' 38'' =
m P8 - P9 = 28.8 Sin 46⁰ 50' 24'' =
m P9 - P10 = 27.6 Sin 20⁰ 29' 31'' =
m P10 - P11 = 25.1 Sin 0⁰ 43' 47'' =
m P11 - P12 = 4.0 Sin -38⁰ 58' 18'' =
m P12 - P13 = 3.8 Sin 295⁰ 26' 14'' =
m P13 - P14 = 3.9 Sin 267⁰ 12' 45'' =
m P14 - P15 = 27.9 Sin 228⁰ 54' 36'' =
m P15 - P16 = 42.6 Sin 180⁰ 54' 43'' =
m P16 - P0 = 28.3 Sin 193⁰ 42' 49'' =
m ∑ =
m

61
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
nate Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

B. Menghitung Dy
Rumus :
Dy = D cos a
P0 - P1 = 29 Cos 320⁰ 35' 25'' =
28.9 m P1 - P2 = 23 Cos 304⁰ 21' 6'' =
23.3 m P2 - P3 = 3 Cos 251⁰ 39' 2'' =
3.2 m P3 - P4 = 4 Cos 213⁰ 55' 39'' =
4.2 m P4 - P5 = 29 Cos 178⁰ 58' 45'' =
28.6 m P5 - P6 = 3 Cos 157⁰ 21' 6'' =
3.2 m P6 - P7 = 4 Cos 106⁰ 41' 57'' =
4.0 m P7 - P8 = 2 Cos 81⁰ 0' 38'' =
2.4 m P8 - P9 = 29 Cos 46⁰ 50' 24'' =
28.8 m P9 - P10 = 28 Cos 20⁰ 29' 31'' =
27.6 m P10 - P11 = 25 Cos 0⁰ 43' 47'' =
25.1 m P11 - P12 = 4 Cos -38⁰ 58' 18'' =
4.0 m P12 - P13 = 4 Cos 295⁰ 26' 14'' =
3.8 m P13 - P14 = 4 Cos 267⁰ 12' 45'' =
3.9 m P14 - P15 = 28 Cos 228⁰ 54' 36'' =
27.9 m P15 - P16 = 43 Cos 180⁰ 54' 43'' =
42.6 m P16 - P0 = 28 Cos 193⁰ 42' 49'' =
28.3 m ∑ =
290 m 4.3.1.8. Perhitungan Koreksi Tiap Titik
Rumus :
Dx = k = ( D/∑D ) x ( -∑D sin α )
A. Menghitung Dx
-18.79 m P0 - P1 = ( 28.9 / 290 ) x 42.63 =
-19.23 m P1 - P2 = ( 23.3 / 290 ) x 42.63 =
-3.03 m P2 - P3 = ( 3.2 / 290 ) x 42.63 =
-2.32 m P3 - P4 = ( 4.2 / 290 ) x 42.63 =
0.51 m P4 - P5 = ( 28.6 / 290 ) x 42.63 =
1.23 m P5 - P6 = ( 3.2 / 290 ) x 42.63 =
3.79 m P6 - P7 = ( 4.0 / 290 ) x 42.63 =
2.40 m P7 - P8 = ( 2.4 / 290 ) x 42.63 =
20.97 m P8 - P9 = ( 28.8 / 290 ) x 42.63 =
9.65 m P9 - P10 = ( 27.6 / 290 ) x 42.63 =
0.32 m P10 - P11 = ( 25.1 / 290 ) x 42.63 =
-2.41 m P11 - P12 = ( 4.0 / 290 ) x 42.63 =
-3.39 m P12 - P13 = ( 3.8 / 290 ) x 42.63 =
-3.88 m P13 - P14 = ( 3.9 / 290 ) x 42.63 =
-21.05 m P14 - P15 = ( 27.9 / 290 ) x 42.63 =
-0.68 m P15 - P16 = ( 42.6 / 290 ) x 42.63 =
-6.70 m P16 - P0 = ( 28.3 / 290 ) x 42.63 =
-42.63 m ∑ =

61
NAH LABORATORIUM ILMU UKUR TANAH
L PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Ternate Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

B. Menghitung Dy
Dy = k = ( D/∑D ) x ( -∑D cos α )
P0 - P1 = ( 28.9 / 290 ) x 14.56
22.31 m P1 - P2 = ( 23.3 / 290 ) x 14.56
13.14 m P2 - P3 = ( 3.2 / 290 ) x 14.56
-1.01 m P3 - P4 = ( 4.2 / 290 ) x 14.56
-3.45 m P4 - P5 = ( 28.6 / 290 ) x 14.56
-28.59 m P5 - P6 = ( 3.2 / 290 ) x 14.56
-2.94 m P6 - P7 = ( 4.0 / 290 ) x 14.56
-1.14 m P7 - P8 = ( 2.4 / 290 ) x 14.56
0.38 m P8 - P9 = ( 28.8 / 290 ) x 14.56
19.67 m P9 - P10 = ( 27.6 / 290 ) x 14.56
25.81 m P10 - P11 = ( 25.1 / 290 ) x 14.56
25.07 m P11 - P12 = ( 4.0 / 290 ) x 14.56
3.19 m P12 - P13 = ( 3.8 / 290 ) x 14.56
1.61 m P13 - P14 = ( 3.9 / 290 ) x 14.56
-0.19 m P14 - P15 = ( 27.9 / 290 ) x 14.56
-18.36 m P15 - P16 = ( 42.6 / 290 ) x 14.56
-42.59 m P16 - P0 = ( 28.3 / 290 ) x 14.56
-27.47 m Koreksi : ∑
+
-14.56 m D sin a = -42.63 + 42.63 = 0.000 m …
D cos a = -14.56 + 14.56 = 0.000 m …

4.3.1.9. Perhitungan Koordinat titik utama


Data Kordinat Awal :
4.25 m x P0 = 22 m
3.43 m y P0 = 35 m
0.47 m
0.61 m A. arah x
4.21 m Rumus :
0.47 m x = Xawal ± D sin α awal ± δD sin α awal
0.58 m P0 = = 22.0
0.36 m P1 = 22 + -19.23 + 3.43 = 6.2
4.23 m P2 = 6.202441 + -3.03 + 0.47 = 3.6
4.06 m P3 = 3.641438 + -2.32 + 0.61 = 1.9
3.69 m P4 = 1.930496 + 0.51 + 4.21 = 6.7
0.59 m P5 = 6.65056 + 1.23 + 0.47 = 8.3
0.55 m P6 = 8.347702 + 3.79 + 0.58 = 12.7
0.57 m P7 = 12.71648 + 2.40 + 0.36 = 15.5
4.11 m P8 = 15.47135 + 20.97 + 4.23 = 40.7
6.27 m P9 = 40.67678 + 9.65 + 4.06 = 54.4
4.16 m P10 = 54.38103 + 0.32 + 3.69 = 58.4
+
42.63 m

61
TANAH LABORATORIUM ILMU UKUR TANAH
IPIL PROGRAM STUDI TEKNIK SIPIL
AIR FAKULTAS TEKNIK UNKHAIR
besi, Ternate Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P11 = 58.391 + -2.41 + 0.59 = 56.6


P12 = 56.57132 + -3.39 + 0.55 = 53.7
= 1.45 m P13 = 53.73263 + -3.88 + 0.57 = 50.4
= 1.17 m P14 = 50.42103 + -21.05 + 4.11 = 33.5
= 0.16 m P15 = 33.48354 + -0.68 + 6.27 = 39.1
= 0.21 m P16 = 39.07751 + -6.70 + 4.16 = 36.5
= 1.44 m P0 = 36.5369 + -18.79 + 4.25 = 22.0
= 0.16 m B. arah y
= 0.20 m Rumus :
= 0.12 m y = Yawal ± D Cos α awal ± δDx Cos α awal
= 1.45 m
= 1.39 m
= 1.26 m P0 = =
= 0.20 m P1 = 35 + 13.14 + 1.17 =
= 0.19 m P2 = 49.31 + -1.01 + 0.16 =
= 0.20 m P3 = 48.47 + -3.45 + 0.21 =
= 1.40 m P4 = 45.22 + -28.59 + 1.44 =
= 2.14 m P5 = 18.07 + -2.94 + 0.16 =
= 1.42 m P6 = 15.29 + -1.14 + 0.20 =
= 14.56 m P7 = 14.35 + 0.38 + 0.12 =
OK! P8 = 14.85 + 19.67 + 1.45 =
OK! P9 = 35.96 + 25.81 + 1.39 =
P10 = 63.16 + 25.07 + 1.26 =
P11 = 89.49 + 3.19 + 0.20 =
P12 = 92.88 + 1.61 + 0.19 =
P13 = 94.68 + -0.19 + 0.20 =
P14 = 94.69 + -18.36 + 1.40 =
P15 = 77.74 + -42.59 + 2.14 =
P16 = 37.29 + -27.47 + 1.42 =
P0 = 11.24 + 22.31 + 1.45 =
awal
22.0 m
6.2 m
3.6 m
1.9 m
6.7 m
8.3 m
12.7 m
15.5 m
40.7 m
54.4 m
58.4 m

61
UR TANAH LABORATORIUM ILMU UKUR TANAH
K SIPIL PROGRAM STUDI TEKNIK SIPIL
KHAIR FAKULTAS TEKNIK UNKHAIR
Gambesi, Ternate Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

m 4.3.1.10. Perhitungan Beda Tinggi (AH) Titik Utama


m
m Rumus :
m ΔH = TPS + 50 (Ba - Bb) Sin 2ϴ - Bt -------> ϴ = 90◦ - V
m P0 - P1 = 1.51 + 50 (1.90 - 1.60) sin 2 7⁰ 40' 0''
m P1 - P2 = 1.44 + 50 (1.60 - 1.36) sin 2 9⁰ 55' 5''
m OK! P2 - P3 = 1.42 + 50 (0.82 - 0.79) sin 2 -3⁰ 26' 0''
P3 - P4 = 1.49 + 50 (0.92 - 0.87) sin 2 -6⁰ 40' 25''
P4 - P5 = 1.48 + 50 (1.03 - 0.75) sin 2 -1⁰ 29' 0''
x Cos α awal P5 - P6 = 1.48 + 50 (0.70 - 0.67) sin 2 -4⁰ 31' 45''
P6 - P7 = 0.41 + 50 (1.33 - 1.29) sin 2 -7⁰ 48' 20''
P7 - P8 = 1.41 + 50 (0.87 - 0.85) sin 2 -15⁰ 3' 55''
35.0 m P8 - P9 = 1.36 + 50 (0.67 - 0.37) sin 2 -12⁰ 13' 35''
49.3 m P9 - P10 = 1.32 + 50 (1.74 - 1.44) sin 2 -16⁰ 4' 35''
48.5 m P10 - P11 = 1.32 + 50 (1.43 - 1.18) sin 2 -5⁰ 50' 20''
45.2 m P11 - P12 = 1.32 + 50 (1.55 - 1.51) sin 2 0⁰ 38' 10''
18.1 m P12 - P13 = 1.375 + 50 (1.12 - 1.09) sin 2 -7⁰ 48' 20''
15.3 m P13 - P14 = 1.45 + 50 (0.90 - 0.86) sin 2 -10⁰ 24' 0''
14.3 m P14 - P15 = 1.53 + 50 (0.60 - 0.32) sin 2 -3⁰ 6' 55''
14.8 m P15 - P16 = 1.47 + 50 (2.31 - 1.88) sin 2 -1⁰ 38' 0''
36.0 m P16 - P0 = 1.52 + 51 (0.99 - 0.70) sin 3 -8⁰ 17' 5''
63.2 m
89.5 m 4.3.1.11. Perhitungan Koreksi tiap titik
92.9 m
94.7 m Rumus : ΔδH = ∑ΔH/n
94.7 m -12.50
ΔδH =
77.7 m 17
37.3 m ΔδH = -0.74 m
11.2 m
35.0 m OK!

61
KUR TANAH LABORATORIUM ILMU UKUR TANAH
IK SIPIL PROGRAM STUDI TEKNIK SIPIL
NKHAIR FAKULTAS TEKNIK UNKHAIR
Gambesi, Ternate Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3.1.12. Perhitungan tinggi titik patok utama

Rumus :
Hn = Hn - 1 ± ΔH - 1 + ( -DδH )
0'' - 1.748 = 3.68 m
5'' - 1.48 = 4.09 m P0 = = 43.0
0'' - 0.804 = 0.47 m P1 = 43 + 4.09 + 0.735 = 47.8
25'' - 0.894 = 0.21 m P2 = 47.829 + 0.47 + 0.735 = 49.0
0'' - 0.891 = 0.33 m P3 = 49.037 + 0.21 + 0.735 = 50.0
45'' - 0.688 = 0.60 m P4 = 49.979 + 0.33 + 0.735 = 51.0
20'' - 1.313 = -1.33 m P5 = 51.045 + 0.60 + 0.735 = 52.4
55'' - 0.86 = -0.12 m P6 = 52.379 + -1.33 + 0.735 = 51.8
35'' - 0.515 = -5.28 m P7 = 51.779 + -0.12 + 0.735 = 52.4
35'' - 1.589 = -8.44 m P8 = 52.394 + -5.28 + 0.735 = 47.9
20'' - 1.304 = -1.81 m P9 = 47.853 + -8.44 + 0.735 = 40.1
10'' - 1.528 = -0.16 m P10 = 40.144 + -1.81 + 0.735 = 39.1
20'' - 1.105 = -0.14 m P11 = 39.067 + -0.16 + 0.735 = 39.6
0'' - 0.881 = -0.10 m P12 = 39.638 + -0.14 + 0.735 = 40.2
55'' - 0.455 = -0.33 m P13 = 40.234 + -0.10 + 0.735 = 40.9
0'' - 2.095 = -0.90 m P14 = 40.871 + -0.33 + 0.735 = 41.3
5'' - 0.841 = -3.26 m P15 = 41.272 + -0.90 + 0.735 = 41.1
∑ = -12.50 m P16 = 41.110 + -3.26 + 0.735 = 38.6
P0 = 38.580 + 3.68 + 0.735 = 43.0

61
KUR TANAH
NIK SIPIL
NKHAIR
. Gambesi, Ternate

43.0 m 52
47.8 m 39
49.0 m
50.0 m
51.0 m
52.4 m
51.8 m
52.4 m
47.9 m
40.1 m
39.1 m
39.6 m
40.2 m
40.9 m
41.3 m
41.1 m
38.6 m
43.0 m OK!!

61
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3. Perhitungan / Pengolahan Data Theodolite


4.3.1. Perhitungan Patok Utama Theodolite
4.3.1.1. Perhitungan Besar Sudut Datar
P0 - P1 = 320⁰ 35' 25'' - 0⁰ 0' 0'' = 320⁰ 35' 25''
P1 - P2 = 177⁰ 28' 30'' - 0⁰ 0' 0'' = 177⁰ 28' 30''
P2 - P3 = 141⁰ 0' 45'' - 0⁰ 0' 0'' = 141⁰ 0' 45''
P3 - P4 = 155⁰ 59' 25'' - 0⁰ 0' 0'' = 155⁰ 59' 25''
P4 - P5 = 158⁰ 45' 55'' - 0⁰ 0' 0'' = 158⁰ 45' 55''
P5 - P6 = 171⁰ 65' 10'' - 0⁰ 0' 0'' = 171⁰ 65' 10''
P6 - P7 = 143⁰ 3' 40'' - 0⁰ 0' 0'' = 143⁰ 3' 40''
P7 - P8 = 168⁰ 1' 30'' - 0⁰ 0' 0'' = 168⁰ 1' 30''
P8 - P9 = 159⁰ 32' 35'' - 0⁰ 0' 0'' = 159⁰ 32' 35''
P9 - P10 = 167⁰ 21' 55'' - 0⁰ 0' 0'' = 167⁰ 21' 55''
P10 - P11 = 173⁰ 57' 5'' - 0⁰ 0' 0'' = 173⁰ 57' 5''
P11 - P12 = 155⁰ 57' 20'' - 0⁰ 0' 0'' = 155⁰ 57' 20''
P12 - P13 = 166⁰ 10' 45'' - 0⁰ 0' 0'' = 166⁰ 10' 45''
P13 - P14 = 165⁰ 29' 20'' - 0⁰ 0' 0'' = 165⁰ 29' 20''
P14 - P15 = 155⁰ 24' 40'' - 0⁰ 0' 0'' = 155⁰ 24' 40''
P15 - P16 = 145⁰ 42' 55'' - 0⁰ 0' 0'' = 145⁰ 42' 55''
P16 - P0 = 111⁰ 27' 45'' - 0⁰ 0' 0'' = 111⁰ 27' 45''
+
2838⁰ 4' 40''

4.3.1.2. Perhitungan Koreksi Tiap Sudut


Rumus :
da = (- (∑a - (n ± 2) x 180⁰))
n
0
= (- ( 2838⁰ 4' ### - ( 17 + 2 ) x 180 ))
17
= -8.122
= -9⁰ 52' 40''

P0 - P1 = 320⁰ 35' 25'' + -9⁰ 52' 40'' = 312⁰ 28' 5''


P1 - P2 = 177⁰ 28' 30'' + -9⁰ 52' 40'' = 169⁰ 21' 10''
P2 - P3 = 141⁰ 0' 45'' + -9⁰ 52' 40'' = 132⁰ 53' 25''
P3 - P4 = 155⁰ 59' 25'' + -9⁰ 52' 40'' = 147⁰ 52' 5''
P4 - P5 = 158⁰ 45' 55'' + -9⁰ 52' 40'' = 150⁰ 38' 35''
P5 - P6 = 171⁰ 65' 10'' + -9⁰ 52' 40'' = 163⁰ 57' 50''
P6 - P7 = 143⁰ 3' 40'' + -9⁰ 52' 40'' = 134⁰ 56' 20''
P7 - P8 = 168⁰ 1' 30'' + -9⁰ 52' 40'' = 159⁰ 54' 10''
P8 - P9 = 159⁰ 32' 35'' + -9⁰ 52' 40'' = 151⁰ 25' 15''
P9 - P10 = 167⁰ 21' 55'' + -9⁰ 52' 40'' = 159⁰ 14' 35''
P10 - P11 = 173⁰ 57' 5'' + -9⁰ 52' 40'' = 165⁰ 49' 45''
P11 - P12 = 155⁰ 57' 20'' + -9⁰ 52' 40'' = 147⁰ 49' 60''
P12 - P13 = 166⁰ 10' 45'' + -9⁰ 52' 40'' = 158⁰ 3' 25''
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P13 - P14 = 165⁰ 29' 20'' + -9⁰ 52' 40'' = 157⁰ 21' 60''
P14 - P15 = 155⁰ 24' 40'' + -9⁰ 52' 40'' = 147⁰ 17' 20''
P15 - P16 = 145⁰ 42' 55'' + -9⁰ 52' 40'' = 137⁰ 35' 35''
P16 - P0 = 111⁰ 27' 45'' + -9⁰ 52' 40'' = 103⁰ 20' 25''

4..3.1.3 Perhitungan Azimuth Benar Patok Utama


Rumus :
αn = ( αawal + βn + 1 ) -180◦
αawal / P0 = 320⁰ 35' 25''
P0 - P1 = 320⁰ 35' 25'' + 169⁰ 21' 10'' - 180⁰ = 309⁰ 56' 35''
P1 - P2 = 309⁰ 56' 35'' + 132⁰ 53' 25'' - 180⁰ = 262⁰ 49' 60''
P2 - P3 = 262⁰ 49' 60'' + 147⁰ 52' 5'' - 180⁰ = 230⁰ 42' 5''
P3 - P4 = 230⁰ 42' 5'' + 150⁰ 38' 35'' - 180⁰ = 201⁰ 20' 40''
P4 - P5 = 201⁰ 20' 40'' + 163⁰ 57' 50'' - 180⁰ = 185⁰ 18' 30''
P5 - P6 = 185⁰ 18' 30'' + 134⁰ 56' 20'' - 180⁰ = 140⁰ 14' 50''
P6 - P7 = 140⁰ 14' ### + 159⁰ 54' 10'' - 180⁰ = 120⁰ 8' 60''
P7 - P8 = 120⁰ 8' 60'' + 151⁰ 25' 15'' - 180⁰ = 91⁰ 34' 15''
P8 - P9 = 91⁰ 34' 15'' + 159⁰ 14' 35'' - 180⁰ = 70⁰ 48' 50''
P9 - P10 = 70⁰ 48' 50'' + 165⁰ 49' 45'' - 180⁰ = 56⁰ 38' 35''
P10 - P11 = 56⁰ 38' 35'' + 147⁰ 49' 60'' - 180⁰ = 24⁰ 28' 35''
P11 - P12 = 24⁰ 28' ### + 158⁰ 3' 25'' - 180⁰ = 2⁰ 31' 60''
P12 - P13 = 2⁰ 31' 60'' + 157⁰ 21' 60'' - 180⁰ = -21⁰ 53' 60'' + 360⁰
= 339⁰ 53' 60''
P13 - P14 = 339⁰ 53' 60'' + 147⁰ 17' 20'' - 180⁰ = 307⁰ 11' 20''
P14 - P15 = 307⁰ 11' 20'' + 137⁰ 35' 35'' - 180⁰ = 264⁰ 46' 55''
P15 - P16 = 264⁰ 46' 55'' + 103⁰ 20' 25'' - 180⁰ = 188⁰ 7' 20''
P16 - P0 = 188⁰ 7' 20'' + 312⁰ 28' 5'' - 180⁰ = 320⁰ 35' 25'' OK!

4.3.1.4. Menghitung Sudut Miring


Rumus :
m = 90◦ - V
P0 - P1 = 90⁰ - 82⁰ 20' 0'' = 7⁰ 40' 0''
P1 - P2 = 90⁰ - 80⁰ 4' 55'' = 9⁰ 55' 5''
P2 - P3 = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0''
P3 - P4 = 90⁰ - 95⁰ 19' 35'' = -6⁰ 40' 25''
P4 - P5 = 90⁰ - 90⁰ 31' 0'' = -1⁰ 29' 0''
P5 - P6 = 90⁰ - 93⁰ 28' 15'' = -4⁰ 31' 45''
P6 - P7 = 90⁰ - 96⁰ 11' 40'' = -7⁰ 48' 20''
P7 - P8 = 90⁰ - 104⁰ 56' 5'' = -15⁰ 3' 55''
P8 - P9 = 90⁰ - 101⁰ 46' 25'' = -12⁰ 13' 35''
P9 - P10 = 90⁰ - 105⁰ 55' 25'' = -16⁰ 4' 35''
P10 - P11 = 90⁰ - 94⁰ 9' 40'' = -5⁰ 50' 20''
P11 - P12 = 90⁰ - 89⁰ 21' 50'' = 0⁰ 38' 10''
P12 - P13 = 90⁰ - 96⁰ 11' 40'' = -7⁰ 48' 20''
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P13 - P14 = 90⁰ - 99⁰ 36' 0'' = -10⁰ 24' 0''


P14 - P15 = 90⁰ - 92⁰ 53' 5'' = -3⁰ 6' 55''
P15 - P16 = 90⁰ - 90⁰ 22' 0'' = -1⁰ 38' 0''
P16 - P0 = 91⁰ - 82⁰ 43' 0'' = 8⁰ 16' 60''

4.3.1.5. Perhitungan Jarak Optis


Rumus :
Dopt = (Ba - Bb) x 100
P0 - P1 = ( 1.895 - 1.601 ) x 100 = 29.4 m
P1 - P2 = ( 1.600 - 1.360 ) x 100 = 24 m
P2 - P3 = ( 0.820 - 0.788 ) x 100 = 3.2 m
P3 - P4 = ( 0.915 - 0.873 ) x 100 = 4.2 m
P4 - P5 = ( 1.034 - 0.748 ) x 100 = 28.6 m
P5 - P6 = ( 0.704 - 0.672 ) x 100 = 3.2 m
P6 - P7 = ( 1.333 - 1.293 ) x 100 = 4 m
P7 - P8 = ( 0.873 - 0.847 ) x 100 = ###
P8 - P9 = ( 0.665 - 0.365 ) x 100 = 30 m
P9 - P10 = ( 1.738 - 1.440 ) x 100 = 29.8 m
P10 - P11 = ( 1.430 - 1.178 ) x 100 = 25.2 m
P11 - P12 = ( 1.548 - 1.508 ) x 100 = 4 m
P12 - P13 = ( 1.124 - 1.086 ) x 100 = 3.8 m
P13 - P14 = ( 0.901 - 0.861 ) x 100 = ###
P14 - P15 = ( 0.595 - 0.315 ) x 100 = 28 m
P15 - P16 = ( 2.308 - 1.882 ) x 100 = 42.6 m
P16 - P0 = ( 0.985 - 0.697 ) x 100 = 28.8 m

4.3.1.6. Perhitungan Jarak Datar Patok Utama


Rumus :
D = Doptis . Cos2 . m
P0 - P1 = 29.4 . Cos2 . 7⁰ 40' 0'' = 28.9 m
P1 - P2 = 24 . Cos2 . 9⁰ 55' 5'' = 23.3 m
P2 - P3 = 3.2 . Cos2 . -3⁰ 26' 0'' = 3.2 m
P3 - P4 = 4.2 . Cos2 . -6⁰ 40' 25'' = 4.2 m
P4 - P5 = 28.6 . Cos2 . -1⁰ 29' 0'' = 28.6 m
P5 - P6 = 3.2 . Cos2 . -4⁰ 31' 45'' = 3.2 m
P6 - P7 = 4 . Cos2 . -7⁰ 48' 20'' = 4.0 m
P7 - P8 = 2.6 . Cos2 . -15⁰ 3' 55'' = 2.4 m
P8 - P9 = 30 . Cos2 . -12⁰ 13' 35'' = 28.8 m
P9 - P10 = 29.8 . Cos2 . -16⁰ 4' 35'' = 27.6 m
P10 - P11 = 25.2 . Cos2 . -5⁰ 50' 20'' = 25.1 m
P11 - P12 = 4 . Cos2 . 0⁰ 38' 10'' = 4.0 m
P12 - P13 = 3.8 . Cos2 . -7⁰ 48' 20'' = 3.8 m
P13 - P14 = 4 . Cos2 . -10⁰ 24' 0'' = 3.9 m
P14 - P15 = 28 . Cos2 . -3⁰ 6' 55'' = 27.9 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P15 - P16 = 42.6 . Cos2 .### 38' 0'' = 42.6 m


P16 - P0 = 28.8 . Cos2 . 8⁰ 16' 60'' = 28.2 m
∑D = 289.4 m

4.3.1.7. Perhitungan Dsin dan Dcos Patok Utama (Dx dan Dy)
A. Menghitung Dx
Rumus :
Dx = D . sin . a
P0 - P1 = 28.9 . Sin . 320⁰ 35' 25' = -18.33 m
P1 - P2 = 23.3 . Sin . 309⁰ 56' ### = -17.85 m
P2 - P3 = 3.2 . Sin . 262⁰ 49' ### = -3.17 m
P3 - P4 = 4.2 . Sin . 230⁰ 42' ### = -3.22 m
P4 - P5 = 28.6 . Sin . 201⁰ 20' ### = -10.41 m
P5 - P6 = 3.2 . Sin . 185⁰ 18' ### = -0.29 m
P6 - P7 = 4.0 . Sin . 140⁰ 14' ### = 2.53 m
P7 - P8 = 2.4 . Sin . 120⁰ 8' ### = 2.10 m
P8 - P9 = 28.8 . Sin . 91⁰ 34' ### = 28.74 m
P9 - P10 = 27.6 . Sin . 70⁰ 48' ### = 26.03 m
P10 - P11 = 25.1 . Sin . 56⁰ 38' ### = 20.94 m
P11 - P12 = 4.0 . Sin . 24⁰ 28' ### = 1.66 m
P12 - P13 = 3.8 . Sin . 2⁰ 31' ### = 0.17 m
P13 - P14 = 3.9 . Sin . 339⁰ 53' ### = -1.34 m
P14 - P15 = 27.9 . Sin . 307⁰ 53' ### = -22.04 m
P15 - P16 = 42.6 . Sin . 264⁰ 11' ### = -42.38 m
P16 - P0 = 28.2 . Sin . 188⁰ 46' ### = -4.31 m
∑D = -41.2 m

B. Menghitung Dy
Rumus :
Dy = D . cos . a
P0 - P1 = 28.9 . Cos . 320⁰ 35' 25' = 22.3 m
P1 - P2 = 23.3 . Cos . 309⁰ 56' ### = 15.0 m
P2 - P3 = 3.2 . Cos . 262⁰ 49' ### = -0.4 m
P3 - P4 = 4.2 . Cos . 230⁰ 42' ### = -2.6 m
P4 - P5 = 28.6 . Cos . 201⁰ 20' ### = -26.6 m
P5 - P6 = 3.2 . Cos . 185⁰ 18' ### = -3.2 m
P6 - P7 = 4.0 . Cos . 140⁰ 14' ### = -3.0 m
P7 - P8 = 2.4 . Cos . 120⁰ 8' ### = -1.2 m
P8 - P9 = 28.8 . Cos . 91⁰ 34' ### = -0.8 m
P9 - P10 = 27.6 . Cos . 70⁰ 48' ### = 9.1 m
P10 - P11 = 25.1 . Cos . 56⁰ 38' ### = 13.8 m
P11 - P12 = 4.0 . Cos . 24⁰ 28' ### = 3.6 m
P12 - P13 = 3.8 . Cos . 2⁰ 31' ### = 3.8 m
P13 - P14 = 3.9 . Cos . 339⁰ 53' ### = 3.7 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P14 - P15 = 27.9 . Cos . 307⁰ 53' ### = 17.2 m


P15 - P16 = 42.6 . Cos . 264⁰ 11' ### = -4.3 m
P16 - P0 = 28.2 . Cos . 188⁰ 46' ### = -27.9 m
∑D = 18.2 m

4.3.1.8. Perhitungan Koreksi Tiap Titik


Rumus :
A. Menghitung Dx
Dx = k = ( D/∑D ) x ( -∑D sin α )
P0 - P1 = ( 28.9 / 289.4 ) x 41.2 = 4.11 m
P1 - P2 = ( 23.3 / 289.4 ) x 41.2 = 3.31 m
P2 - P3 = ( 3.2 / 289.4 ) x 41.2 = 0.45 m
P3 - P4 = ( 4.2 / 289.4 ) x 41.2 = 0.59 m
P4 - P5 = ( 28.6 / 289.4 ) x 41.2 = 4.07 m
P5 - P6 = ( 3.2 / 289.4 ) x 41.2 = 0.45 m
P6 - P7 = ( 4.0 / 289.4 ) x 41.2 = 0.56 m
P7 - P8 = ( 2.4 / 289.4 ) x 41.2 = 0.35 m
P8 - P9 = ( 28.8 / 289.4 ) x 41.2 = 4.09 m
P9 - P10 = ( 27.6 / 289.4 ) x 41.2 = 3.92 m
P10 - P11 = ( 25.1 / 289.4 ) x 41.2 = 3.57 m
P11 - P12 = ( 4.0 / 289.4 ) x 41.2 = 0.57 m
P12 - P13 = ( 3.8 / 289.4 ) x 41.2 = 0.53 m
P13 - P14 = ( 3.9 / 289.4 ) x 41.2 = 0.55 m
P14 - P15 = ( 27.9 / 289.4 ) x 41.2 = 3.97 m
P15 - P16 = ( 42.6 / 289.4 ) x 41.2 = 6.06 m
P16 - P0 = ( 28.2 / 289.4 ) x 41.2 = 4.01 m
∑D = 41.2 m

B. Menghitung Dy
Dy = k = ( D/∑D ) x ( -∑D Cos α )
P0 - P1 = ( 28.9 / 289.4 ) x -18.2 = -1.82 m
P1 - P2 = ( 23.3 / 289.4 ) x -18.2 = -1.47 m
P2 - P3 = ( 3.2 / 289.4 ) x -18.2 = -0.20 m
P3 - P4 = ( 4.2 / 289.4 ) x -18.2 = -0.26 m
P4 - P5 = ( 28.6 / 289.4 ) x -18.2 = -1.80 m
P5 - P6 = ( 3.2 / 289.4 ) x -18.2 = -0.20 m
P6 - P7 = ( 4.0 / 289.4 ) x -18.2 = -0.25 m
P7 - P8 = ( 2.4 / 289.4 ) x -18.2 = -0.15 m
P8 - P9 = ( 28.8 / 289.4 ) x -18.2 = -1.81 m
P9 - P10 = ( 27.6 / 289.4 ) x -18.2 = -1.74 m
P10 - P11 = ( 25.1 / 289.4 ) x -18.2 = -1.58 m
P11 - P12 = ( 4.0 / 289.4 ) x -18.2 = -0.25 m
P12 - P13 = ( 3.8 / 289.4 ) x -18.2 = -0.24 m
P13 - P14 = ( 3.9 / 289.4 ) x -18.2 = -0.24 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P14 - P15 = ( 27.9 / 289.4 ) x -18.2 = -1.76 m


P15 - P16 = ( 42.6 / 289.4 ) x -18.2 = -2.68 m
P16 - P0 = ( 28.2 / 289.4 ) x -18.2 = -1.78 m
∑D = -18.2 m
Koreksi :
D sin a = -41.19 + 41.19 = 0 m .... OK!
D cos a = 18.22 + -18.22 = 0 m .... OK!

4.3.1.9. Perhitungan Koordinat titik utama


Data Kordinat Awal :
x P0 = 22 m
y P0 = 35 m X Y
A. arah x MIN -4 m 6 m
Rumus : -3.84 5.3775
x = Xawal ± D sin α awal ± δD sin α awal 110
P0 = = 22 m P0 23.8 26.4 35
P1 = 22 + -17.85 + 3.31 = 7.5 m P1 10.6 38.7 48
P2 = 7.5 + -3.17 + 0.45 = 4.7 m P2 8.2 38.2 48
P3 = 4.7 + -3.22 + 0.59 = 2.1 m P3 5.8 35.5 45
P4 = 2.1 + -10.41 + 4.07 = -4.2 m P4 0.0 9.7 17
P5 = -4.2 + -0.29 + 0.45 = -4.1 m P5 0.1 6.6 13
P6 = -4.1 + 2.53 + 0.56 = -1.0 m P6 3.0 3.6 10
P7 = -1.0 + 2.10 + 0.35 = 1.5 m P7 5.2 2.4 09
P8 = 1.5 + 28.74 + 4.09 = 34.3 m P8 35.0 0.0 06
P9 = 34.3 + 26.03 + 3.92 = 64.2 m P9 62.2 6.7 13
P10 = 64.2 + 20.94 + 3.57 = 88.8 m P10 84.5 17.8 25
P11 = 88.8 + 1.66 + 0.57 = 91.0 m P11 86.5 20.8 29
P12 = 91.0 + 0.17 + 0.53 = 91.7 m P12 87.2 24.0 32
P13 = 91.7 + -1.34 + 0.55 = 90.9 m P13 86.5 27.1 36
P14 = 90.9 + -22.04 + 3.97 = 72.8 m P14 70.1 41.1 51
P15 = 72.8 + -42.38 + 6.06 = 36.5 m P15 37.0 34.8 44
P16 = 36.5 + -4.31 + 4.01 = 36.2 m P16 36.8 7.8 15
P0 = 36.2 + -18.33 + 4.11 = 22 m .... OK! P0 23.8 26.4 35

B. arah y
Rumus :
y = Yawal ± D Cos α awal ± δDx Cos α awal
P0 = = 35 m
P1 = 35 + 15.0 + -1.47 = 48.5 m
P2 = 48.5 + -0.4 + -0.20 = 47.9 m
P3 = 47.9 + -2.6 + -0.26 = 45.0 m
P4 = 45.0 + -26.6 + -1.80 = 16.5 m
P5 = 16.5 + -3.2 + -0.20 = 13.2 m
P6 = 13.2 + -3.0 + -0.25 = 9.9 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P7 = 9.9 + -1.2 + -0.15 = 8.5 m


P8 = 8.5 + -0.8 + -1.81 = 5.9 m
P9 = 5.9 + 9.1 + -1.74 = 13.2 m
P10 = 13.2 + 13.8 + -1.58 = 25.4 m
P11 = 25.4 + 3.6 + -0.25 = 28.8 m
P12 = 28.8 + 3.8 + -0.24 = 32.3 m
P13 = 32.3 + 3.7 + -0.24 = 35.8 m
P14 = 35.8 + 17.2 + -1.76 = 51.2 m
P15 = 51.2 + -4.3 + -2.68 = 44.2 m
P16 = 44.2 + -27.9 + -1.78 = 14.5 m
P0 = 14.5 + 22.3 + -1.82 = 35 m .... OK!

4.3.1.10. Perhitungan Beda Tinggi (AH) Titik Utama


Rumus :
ΔH = TPS + 50 (Ba - Bb) Sin 2ϴ - Bt -------> ϴ = 90◦ - V
P0 - P1 = 1.510 + 50 (1.895 - 1.601) sin 2 7⁰ 40' 0'' - 1.748 = 3.684 m
P1 - P2 = 1.440 + 50 (1.600 - 1.360) sin 2 9⁰ 55' 5'' - 1.480 = 4.094 m
P2 - P3 = 1.420 + 50 (0.820 - 0.788) sin 2 -3⁰ 26' 0'' - 0.804 = 0.473 m
P3 - P4 = 1.490 + 50 (0.915 - 0.873) sin 2 -6⁰ 40' 25'' - 0.894 = 0.206 m
P4 - P5 = 1.480 + 50 (1.034 - 0.748) sin 2 -1⁰ 29' 0'' - 0.891 = 0.331 m
P5 - P6 = 1.480 + 50 (0.704 - 0.672) sin 2 -4⁰ 31' 45'' - 0.688 = 0.598 m
P6 - P7 = 0.410 + 50 (1.333 - 1.293) sin 2 -7⁰ 48' 20'' - 1.313 = -1.335 m
P7 - P8 = 1.410 + 50 (0.873 - 0.847) sin 2 -15⁰ 3' 55'' - 0.860 = -0.120 m
P8 - P9 = 1.360 + 50 (0.665 - 0.365) sin 2 -12⁰ 13' 35'' - 0.515 = -5.276 m
P9 - P10 = 1.320 + 50 (1.738 - 1.440) sin 2 -16⁰ 4' 35'' - 1.589 = -8.445 m
P10 - P11 = 1.320 + 50 (1.430 - 1.178) sin 2 -5⁰ 50' 20'' - 1.304 = -1.813 m
P11 - P12 = 1.320 + 50 (1.548 - 1.508) sin 2 0⁰ 38' 10'' - 1.528 = -0.164 m
P12 - P13 = 1.375 + 50 (1.124 - 1.086) sin 2 -7⁰ 48' 20'' - 1.105 = -0.140 m
P13 - P14 = 1.450 + 50 (0.901 - 0.861) sin 2 -10⁰ 24' 0'' - 0.881 = -0.098 m
P14 - P15 = 1.530 + 50 (0.595 - 0.315) sin 2 -3⁰ 6' 55'' - 0.455 = -0.334 m
P15 - P16 = 1.470 + 50 (2.308 - 1.882) sin 2 -1⁰ 38' 0'' - 2.095 = -0.898 m
P16 - P0 = 1.520 + 50 (0.985 - 0.697) sin 2 8⁰ 16' 60'' - 0.841 = 4.828 m
∑ΔH = -4.407 m

4.3.1.11. Perhitungan Koreksi tiap titik


Rumus :
ΔδH = ∑ΔH/n
-4.407
ΔδH =
17
ΔδH = -0.259 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3.1.12. Perhitungan tinggi titik patok utama


Rumus :
Hn = Hn - 1 ± ΔH - 1 + ( -ΔδH )
P0 = = 43 m
P1 = 43 + 4.09 + 0.259 = 47.4 m
P2 = 47.35 + 0.47 + 0.259 = 48.1 m
P3 = 48.08 + 0.21 + 0.259 = 48.6 m
P4 = 48.55 + 0.33 + 0.259 = 49.1 m
P5 = 49.14 + 0.60 + 0.259 = 50.0 m
P6 = 50.00 + -1.33 + 0.259 = 48.9 m
P7 = 48.92 + -0.12 + 0.259 = 49.1 m
P8 = 49.06 + -5.28 + 0.259 = 44.0 m
P9 = 44.05 + -8.44 + 0.259 = 35.9 m
P10 = 35.86 + -1.81 + 0.259 = 34.3 m
P11 = 34.31 + -0.16 + 0.259 = 34.4 m
P12 = 34.40 + -0.14 + 0.259 = 34.5 m
P13 = 34.52 + -0.10 + 0.259 = 34.7 m
P14 = 34.68 + -0.33 + 0.259 = 34.6 m
P15 = 34.61 + -0.90 + 0.259 = 34.0 m
P16 = 33.97 + 4.83 + 0.259 = 39.1 m
P0 = 39.06 + 3.68 + 0.259 = 43 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Tabel.3 Data Lapangan Theodolite


SOAL
Elevasi P0 : 43 Ket : BJ = Bahu Jalan
Koordinat awal : XP0 = 22 m
YP0 = 35 m
Bacaan Benang Bacaan Sudut
Patok Jarak Bacaan
Patok
Detail B. Atas B.tengah B. Bawah Ukur Horisontal Vertikal Azimut

U (m) ˚ ' " ˚ ' " 320 35 25


P0 P1 1.895 1.748 1.601 29.40 321 59 20 82 20 0
1.510 AJ 1.254 1.238 1.222 3.20 48 57 25 94 49 35
BJ 1.180 1.154 1.128 5.20 48 25 10 94 49 35
D1 1.234 1.205 1.176 5.80 48 44 25 94 49 35
D2 1.762 1.732 1.702 6.00 50 1 0 94 49 35
D3 1.745 1.714 1.683 6.20 50 3 25 94 49 35
D4 1.215 1.184 1.152 6.30 50 26 15 94 49 35
P1 P2 1.600 1.480 1.360 24.00 177 28 30 80 4 55
1.440 AJ 1.260 1.245 1.230 3.00 268 56 10 92 9 0
BJ 1.255 1.232 1.209 4.60 270 27 15 92 8 55
D1 1.209 1.182 1.155 5.40 270 32 45 92 8 55
D2 1.754 1.725 1.696 5.80 270 32 45 92 8 55
D3 1.733 1.704 1.674 5.90 270 26 25 92 8 55
D4 1.175 1.144 1.113 6.20 270 30 10 92 8 55
P2 P3 0.820 0.804 0.788 3.20 141 0 45 92 34 0
1.420 AS 1.312 1.299 1.286 2.60 266 23 40 92 34 0
BJ 1.314 1.288 1.262 5.20 267 44 45 92 34 0
D1 1.465 1.431 1.397 6.80 269 17 15 92 34 0
D2 2.018 1.982 1.946 7.20 269 36 25 92 34 0
D3 2.004 1.968 1.931 7.30 269 22 55 92 34 0
D4 1.484 1.447 1.410 7.40 269 22 55 92 34 0
P3 P4 0.915 0.894 0.873 4.20 155 59 25 95 19 35
1.490 AS 1.011 0.995 0.979 3.20 254 16 15 94 11 35
BJ 0.522 0.489 0.456 6.60 254 43 45 95 42 40
D1 0.980 0.940 0.900 8.00 253 42 45 91 54 45
D2 1.524 1.484 1.443 8.10 253 7 5 91 54 45
D3 1.630 1.589 1.548 8.20 252 46 0 91 54 45
D4 0.977 0.936 0.894 8.30 252 44 15 91 54 45
P4 P5 1.034 0.891 0.748 28.60 158 45 55 90 31 0
1.480 AS 1.160 1.155 1.150 1.00 259 7 15 92 16 25
BJ 1.018 0.990 0.962 5.60 261 14 40 92 16 26
D1 0.922 0.885 0.848 7.40 267 3 30 92 16 25
D2 1.421 1.384 1.346 7.50 263 5 20 92 16 25
D3 1.401 1.360 1.319 8.20 262 54 25 92 16 25
D4 0.882 0.841 0.799 8.30 262 54 25 92 16 25

56
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Bacaan Benang Bacaan Sudut


Patok Jarak
Patok
Detail B. Atas B.tengah B. Bawah Ukur Horisontal Vertikal
P5 P6 0.704 0.688 0.672 3.20 171 65 10 93 28 15
1.480 AJ 1.225 1.212 1.199 2.60 264 2 25 93 8 15
BJ 1.180 1.154 1.128 5.20 262 9 0 93 8 15
A1 0.946 0.913 0.880 6.60 261 44 55 93 8 15
A2 0.865 0.826 0.787 7.80 262 31 55 93 8 15
P6 P7 1.333 1.313 1.293 4.00 143 3 40 96 11 40
0.410 AJ 1.135 1.125 1.115 2.00 252 39 5 96 11 40
BJ 0.983 0.968 0.953 3.00 252 56 45 96 11 40
A1 0.933 0.913 0.893 4.00 253 26 10 96 11 40
A2 0.812 0.787 0.762 5.00 252 50 45 96 11 40
P7 P8 0.873 0.860 0.847 2.60 168 1 30 104 56 5
1.410 AJ 1.153 1.143 1.133 2.00 276 7 45 96 28 30
BJ 0.797 0.774 0.751 4.60 285 56 50 96 28 30
A1 0.773 0.749 0.725 4.80 284 22 5 96 28 30
A2 0.714 0.690 0.665 4.90 283 52 20 96 28 30
P8 P9 0.665 0.515 0.365 30.00 159 32 35 101 46 25
1.360 AJ 0.945 0.933 0.921 2.40 279 26 19 100 28 45
BJ 0.610 0.593 0.576 3.40 275 26 15 100 28 45
A1 1.158 1.121 1.084 7.40 271 27 30 94 19 10
A2 1.280 1.243 1.205 7.50 272 12 30 91 36 25
P9 P10 1.738 1.589 1.440 29.80 167 21 55 105 55 25
1.320 AS 0.845 0.835 0.825 2.00 273 54 55 103 51 35
BJ 0.822 0.805 0.788 3.40 270 15 25 98 25 30
A1 0.803 0.784 0.765 3.80 269 32 35 98 25 30
A2 1.225 1.195 1.165 6.00 267 55 10 98 25 30
P10 P11 1.430 1.304 1.178 25.20 173 57 5 94 9 40
1.320 AS 1.410 1.399 1.388 2.20 269 10 55 94 9 40
BJ 1.325 1.300 1.275 5.00 272 25 30 94 99 40
A1 1.370 1.340 1.310 6.00 273 25 40 94 9 40
A2 1.331 1.301 1.270 6.10 273 4 15 94 9 40
P11 P12 1.548 1.528 1.508 4.00 155 57 20 89 21 50
1.320 AS 1.436 1.424 1.412 2.40 268 25 20 88 18 30
BJ 1.651 1.625 1.599 5.20 267 8 40 88 18 35
A1 1.790 0.783 1.728 6.20 267 8 40 88 18 35
A2 1.800 1.765 1.730 7.00 265 27 15 88 18 30
P12 P13 1.124 1.105 1.086 3.80 166 10 45 96 11 40
1.375 AS 1.255 1.233 1.210 4.50 260 42 10 96 58 55
BJ 1.034 1.009 0.983 5.10 265 38 55 96 58 5
A1 1.017 0.983 0.949 6.80 267 26 0 96 58 10
A2 0.727 0.689 0.650 7.70 271 15 40 96 52 0

56
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Bacaan Benang Bacaan Sudut


Patok Jarak
Patok
Detail B. Atas B.tengah B. Bawah Ukur Horisontal Vertikal
P13 P14 0.901 0.881 0.861 4.00 165 29 20 99 36 0
1.450 AJ 1.064 1.054 1.044 2.00 260 49 20 99 36 0
BJ 0.882 0.861 0.840 4.20 259 1 20 99 36 0
A1 0.864 0.841 0.817 4.70 258 26 55 99 36 0
A2 1.177 1.153 1.129 4.80 258 40 35 99 36 0
A3 1.185 1.154 1.122 6.30 255 55 50 99 36 0
P14 P15 0.595 0.455 0.315 28.00 155 24 40 92 53 5
1.530 AJ 1.325 1.317 1.309 1.60 248 55 25 97 13 10
BJ 1.207 1.190 1.173 3.40 251 48 15 97 13 15
A1 1.328 1.308 1.288 4.00 251 48 15 97 13 15
A2 1.452 1.426 1.400 5.20 252 58 30 97 13 15
P15 P16 2.308 2.095 1.882 42.60 145 42 55 90 22 0
1.470 AJ 1.136 1.123 1.110 2.60 206 30 55 98 42 55
BJ 0.965 0.941 0.917 4.80 208 46 50 98 42 55
A1 0.918 0.885 0.852 6.60 209 46 20 98 59 10
A2 0.550 0.504 0.458 9.20 208 56 20 98 59 5
P16 P0 0.985 0.841 0.697 28.80 111 27 45 82 43 0
1.520 AJ 1.241 1.228 1.215 2.60 298 24 20 95 8 30
BJ 1.082 1.054 1.025 5.70 288 9 30 95 8 30
A1 1.079 1.047 1.014 6.50 287 49 5 95 8 30
A2 0.912 0.869 0.826 8.60 288 10 45 95 8 30
AJ1 1.443 1.397 1.350 9.30 191 44 20 95 15 35
AJ2 1.355 1.308 1.261 9.40 185 14 15 95 14 35

56
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3.2. Perhitungan Detail Theodolite


4.3.2.1. Perhitungan Beda Sudut Detail
P0 - AJ = 48⁰ 57' 25'' - 0⁰ 0' 0'' = 48⁰ 57' 25''
BJ = 48⁰ 25' 10'' - 0⁰ 0' 0'' = 48⁰ 25' 10''
D1 = 48⁰ 44' 25'' - 0⁰ 0' 0'' = 48⁰ 44' 25''
D2 = 50⁰ 1' 0'' - 0⁰ 0' 0'' = 50⁰ 1' 0''
D3 = 50⁰ 3' 25'' - 0⁰ 0' 0'' = 50⁰ 3' 25''
D4 = 50⁰ 26' 15'' - 0⁰ 0' 0'' = 50⁰ 26' 15''
P1 - AJ = 268⁰ 56' 10'' - 0⁰ 0' 0'' = 268⁰ 56' 10''
BJ = 270⁰ 27' 15'' - 0⁰ 0' 0'' = 270⁰ 27' 15''
D1 = 270⁰ 32' 45'' - 0⁰ 0' 0'' = 270⁰ 32' 45''
D2 = 270⁰ 32' 45'' - 0⁰ 0' 0'' = 270⁰ 32' 45''
D3 = 270⁰ 26' 25'' - 0⁰ 0' 0'' = 270⁰ 26' 25''
D4 = 270⁰ 30' 10'' - 0⁰ 0' 0'' = 270⁰ 30' 10''
P2 - AS = 266⁰ 23' 40'' - 0⁰ 0' 0'' = 266⁰ 23' 40''
BJ = 267⁰ 44' 45'' - 0⁰ 0' 0'' = 267⁰ 44' 45''
D1 = 269⁰ 17' 15'' - 0⁰ 0' 0'' = 269⁰ 17' 15''
D2 = 269⁰ 36' 25'' - 0⁰ 0' 0'' = 269⁰ 36' 25''
D3 = 269⁰ 22' 55'' - 0⁰ 0' 0'' = 269⁰ 22' 55''
D4 = 269⁰ 22' 55'' - 0⁰ 0' 0'' = 269⁰ 22' 55''
P3 - AS = 254⁰ 16' 15'' - 0⁰ 0' 0'' = 254⁰ 16' 15''
BJ = 254⁰ 43' 45'' - 0⁰ 0' 0'' = 254⁰ 43' 45''
D1 = 253⁰ 42' 45'' - 0⁰ 0' 0'' = 253⁰ 42' 45''
D2 = 253⁰ 7' 5'' - 0⁰ 0' 0'' = 253⁰ 7' 5''
D3 = 252⁰ 46' 0'' - 0⁰ 0' 0'' = 252⁰ 46' 0''
D4 = 252⁰ 44' 15'' - 0⁰ 0' 0'' = 252⁰ 44' 15''
P4 - AS = 259⁰ 7' 15'' - 0⁰ 0' 0'' = 259⁰ 7' 15''
BJ = 261⁰ 14' 40'' - 0⁰ 0' 0'' = 261⁰ 14' 40''
D1 = 267⁰ 3' 30'' - 0⁰ 0' 0'' = 267⁰ 3' 30''
D2 = 263⁰ 5' 20'' - 0⁰ 0' 0'' = 263⁰ 5' 20''
D3 = 262⁰ 54' 25'' - 0⁰ 0' 0'' = 262⁰ 54' 25''
D4 = 262⁰ 54' 25'' - 0⁰ 0' 0'' = 262⁰ 54' 25''
P5 - AJ = 264⁰ 2' 25'' - 0⁰ 0' 0'' = 264⁰ 2' 25''
BJ = 262⁰ 9' 0'' - 0⁰ 0' 0'' = 262⁰ 9' 0''
A1 = 261⁰ 44' 55'' - 0⁰ 0' 0'' = 261⁰ 44' 55''
A2 = 262⁰ 31' 55'' - 0⁰ 0' 0'' = 262⁰ 31' 55''
P6 - AJ = 252⁰ 39' 5'' - 0⁰ 0' 0'' = 252⁰ 39' 5''
BJ = 252⁰ 56' 45'' - 0⁰ 0' 0'' = 252⁰ 56' 45''
A1 = 253⁰ 26' 10'' - 0⁰ 0' 0'' = 253⁰ 26' 10''
A2 = 252⁰ 50' 45'' - 0⁰ 0' 0'' = 252⁰ 50' 45''
P7 - AJ = 276⁰ 7' 45'' - 0⁰ 0' 0'' = 276⁰ 7' 45''
BJ = 285⁰ 56' 50'' - 0⁰ 0' 0'' = 285⁰ 56' 50''
A1 = 284⁰ 22' 5'' - 0⁰ 0' 0'' = 284⁰ 22' 5''
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A2 = 283⁰ 52' 20'' - 0⁰ 0' 0'' = 283⁰ 52' 20''


LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P8 - AJ = 279⁰ 26' 19'' - 0⁰ 0' 0'' = 279⁰ 26' 19''


BJ = 275⁰ 26' 15'' - 0⁰ 0' 0'' = 275⁰ 26' 15''
A1 = 271⁰ 27' 30'' - 0⁰ 0' 0'' = 271⁰ 27' 30''
A2 = 272⁰ 12' 30'' - 0⁰ 0' 0'' = 272⁰ 12' 30''
P9 - AS = 273⁰ 54' 55'' - 0⁰ 0' 0'' = 273⁰ 54' 55''
BJ = 270⁰ 15' 25'' - 0⁰ 0' 0'' = 270⁰ 15' 25''
A1 = 269⁰ 32' 35'' - 0⁰ 0' 0'' = 269⁰ 32' 35''
A2 = 267⁰ 55' 10'' - 0⁰ 0' 0'' = 267⁰ 55' 10''
P10 - AS = 269⁰ 10' 55'' - 0⁰ 0' 0'' = 269⁰ 10' 55''
BJ = 272⁰ 25' 30'' - 0⁰ 0' 0'' = 272⁰ 25' 30''
A1 = 273⁰ 25' 40'' - 0⁰ 0' 0'' = 273⁰ 25' 40''
A2 = 273⁰ 4' 15'' - 0⁰ 0' 0'' = 273⁰ 4' 15''
P11 - AS = 268⁰ 25' 20'' - 0⁰ 0' 0'' = 268⁰ 25' 20''
BJ = 267⁰ 8' 40'' - 0⁰ 0' 0'' = 267⁰ 8' 40''
A1 = 267⁰ 8' 40'' - 0⁰ 0' 0'' = 267⁰ 8' 40''
A2 = 265⁰ 27' 15'' - 0⁰ 0' 0'' = 265⁰ 27' 15''
P12 - AS = 260⁰ 42' 10'' - 0⁰ 0' 0'' = 260⁰ 42' 10''
BJ = 265⁰ 38' 55'' - 0⁰ 0' 0'' = 265⁰ 38' 55''
A1 = 267⁰ 26' 0'' - 0⁰ 0' 0'' = 267⁰ 26' 0''
A2 = 271⁰ 15' 40'' - 0⁰ 0' 0'' = 271⁰ 15' 40''
P13 - AJ = 260⁰ 49' 20'' - 0⁰ 0' 0'' = 260⁰ 49' 20''
BJ = 259⁰ 1' 20'' - 0⁰ 0' 0'' = 259⁰ 1' 20''
A1 = 258⁰ 26' 55'' - 0⁰ 0' 0'' = 258⁰ 26' 55''
A2 = 258⁰ 40' 35'' - 0⁰ 0' 0'' = 258⁰ 40' 35''
A3 = 255⁰ 55' 50'' - 0⁰ 0' 0'' = 255⁰ 55' 50''
P14 - AJ = 248⁰ 55' 25'' - 0⁰ 0' 0'' = 248⁰ 55' 25''
BJ = 251⁰ 48' 15'' - 0⁰ 0' 0'' = 251⁰ 48' 15''
A1 = 251⁰ 48' 15'' - 0⁰ 0' 0'' = 251⁰ 48' 15''
A2 = 252⁰ 58' 30'' - 0⁰ 0' 0'' = 252⁰ 58' 30''
P15 - AJ = 206⁰ 30' 55'' - 0⁰ 0' 0'' = 206⁰ 30' 55''
BJ = 208⁰ 46' 50'' - 0⁰ 0' 0'' = 208⁰ 46' 50''
A1 = 209⁰ 46' 20'' - 0⁰ 0' 0'' = 209⁰ 46' 20''
A2 = 208⁰ 56' 20'' - 0⁰ 0' 0'' = 208⁰ 56' 20''
P16 - AJ = 298⁰ 24' 20'' - 0⁰ 0' 0'' = 298⁰ 24' 20''
BJ = 288⁰ 9' 30'' - 0⁰ 0' 0'' = 288⁰ 9' 30''
A1 = 287⁰ 49' 5'' - 0⁰ 0' 0'' = 287⁰ 49' 5''
A2 = 288⁰ 10' 45'' - 0⁰ 0' 0'' = 288⁰ 10' 45''
AJ1 = 191⁰ 44' 20'' - 0⁰ 0' 0'' = 191⁰ 44' 20''
AJ2 = 185⁰ 14' 15'' - 0⁰ 0' 0'' = 185⁰ 14' 15''
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3.2.2. Perhitungan Azimuth Detail (α)


Rumus :
αn = αn-1 + ( βn-180⁰)
P0 - AJ = 320⁰ 35' 25'' + ( 48⁰ 57' 25'' - 180⁰ ) = 189⁰ 32' 50''
BJ = 320⁰ 35' 25'' + ( 48⁰ 25' 10'' - 180⁰ ) = 189⁰ 0' 35''
D1 = 320⁰ 35' 25'' + ( 48⁰ 44' 25'' - 180⁰ ) = 189⁰ 19' 50''
D2 = 320⁰ 35' 25'' + ( 50⁰ 1' 0'' - 180⁰ ) = 190⁰ 36' 25''
D3 = 320⁰ 35' 25'' + ( 50⁰ 3' 25'' - 180⁰ ) = 190⁰ 38' 50''
D4 = 320⁰ 35' 25'' + ( 50⁰ 26' 15'' - 180⁰ ) = 191⁰ 1' 40''
P1 - AJ = 177⁰ 28' 30'' + ( 268⁰ 56' 10'' - 180⁰ ) = 266⁰ 24' 40''
BJ = 177⁰ 28' 30'' + ( 270⁰ 27' 15'' - 180⁰ ) = 267⁰ 55' 45''
D1 = 177⁰ 28' 30'' + ( 270⁰ 32' 45'' - 180⁰ ) = 268⁰ 1' 15''
D2 = 177⁰ 28' 30'' + ( 270⁰ 32' 45'' - 180⁰ ) = 268⁰ 1' 15''
D3 = 177⁰ 28' 30'' + ( 270⁰ 26' 25'' - 180⁰ ) = 267⁰ 54' 55''
D4 = 177⁰ 28' 30'' + ( 270⁰ 30' 10'' - 180⁰ ) = 267⁰ 58' 40''
P2 - AS = 141⁰ 0' 45'' + ( 266⁰ 23' 40'' - 180⁰ ) = 227⁰ 24' 25''
BJ = 141⁰ 0' 45'' + ( 267⁰ 44' 45'' - 180⁰ ) = 228⁰ 45' 30''
D1 = 141⁰ 0' 45'' + ( 269⁰ 17' 15'' - 180⁰ ) = 230⁰ 18' 0''
D2 = 141⁰ 0' 45'' + ( 269⁰ 36' 25'' - 180⁰ ) = 230⁰ 37' 10''
D3 = 141⁰ 0' 45'' + ( 269⁰ 22' 55'' - 180⁰ ) = 230⁰ 23' 40''
D4 = 141⁰ 0' 45'' + ( 269⁰ 22' 55'' - 180⁰ ) = 230⁰ 23' 40''
P3 - AS = 155⁰ 59' 25'' + ( 254⁰ 16' 15'' - 180⁰ ) = 230⁰ 15' 40''
BJ = 155⁰ 59' 25'' + ( 254⁰ 43' 45'' - 180⁰ ) = 230⁰ 43' 10''
D1 = 155⁰ 59' 25'' + ( 253⁰ 42' 45'' - 180⁰ ) = 229⁰ 42' 10''
D2 = 155⁰ 59' 25'' + ( 253⁰ 7' 5'' - 180⁰ ) = 229⁰ 6' 30''
D3 = 155⁰ 59' 25'' + ( 252⁰ 46' 0'' - 180⁰ ) = 228⁰ 45' 25''
D4 = 155⁰ 59' 25'' + ( 252⁰ 44' 15'' - 180⁰ ) = 228⁰ 43' 40''
P4 - AS = 158⁰ 45' 55'' + ( 259⁰ 7' 15'' - 180⁰ ) = 237⁰ 53' 10''
BJ = 158⁰ 45' 55'' + ( 261⁰ 14' 40'' - 180⁰ ) = 240⁰ 0' 35''
D1 = 158⁰ 45' 55'' + ( 267⁰ 3' 30'' - 180⁰ ) = 245⁰ 49' 25''
D2 = 158⁰ 45' 55'' + ( 263⁰ 5' 20'' - 180⁰ ) = 241⁰ 51' 15''
D3 = 158⁰ 45' 55'' + ( 262⁰ 54' 25'' - 180⁰ ) = 241⁰ 40' 20''
D4 = 158⁰ 45' 55'' + ( 262⁰ 54' 25'' - 180⁰ ) = 241⁰ 40' 20''
P5 - AJ = 171⁰ 65' 10'' + ( 264⁰ 2' 25'' - 180⁰ ) = 256⁰ 7' 35''
BJ = 171⁰ 65' 10'' + ( 262⁰ 9' 0'' - 180⁰ ) = 254⁰ 14' 10''
A1 = 171⁰ 65' 10'' + ( 261⁰ 44' 55'' - 180⁰ ) = 253⁰ 50' 5''
A2 = 171⁰ 65' 10'' + ( 262⁰ 31' 55'' - 180⁰ ) = 254⁰ 37' 5''
P6 - AJ = 143⁰ 3' 40'' + ( 252⁰ 39' 5'' - 180⁰ ) = 215⁰ 42' 45''
BJ = 143⁰ 3' 40'' + ( 252⁰ 56' 45'' - 180⁰ ) = 216⁰ 0' 25''
A1 = 143⁰ 3' 40'' + ( 253⁰ 26' 10'' - 180⁰ ) = 216⁰ 29' 50''
A2 = 143⁰ 3' 40'' + ( 252⁰ 50' 45'' - 180⁰ ) = 215⁰ 54' 25''
P7 - AJ = 168⁰ 1' 30'' + ( 276⁰ 7' 45'' - 180⁰ ) = 264⁰ 9' 15''
BJ = 168⁰ 1' 30'' + ( 285⁰ 56' 50'' - 180⁰ ) = 273⁰ 58' 20''
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A1 = 168⁰ 1' 30'' + ( 284⁰ 22' 5'' - 180⁰ ) = 272⁰ 23' 35''
A2 = 168⁰ 1' 30'' + ( 283⁰ 52' 20'' - 180⁰ ) = 271⁰ 53' 50''
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P8 - AJ = 159⁰ 32' 35'' + ( 279⁰ 26' 19'' - 180⁰ ) = 258⁰ 58' 54''
BJ = 159⁰ 32' 35'' + ( 275⁰ 26' 15'' - 180⁰ ) = 254⁰ 58' 50''
A1 = 159⁰ 32' 35'' + ( 271⁰ 27' 30'' - 180⁰ ) = 251⁰ 0' 5''
A2 = 159⁰ 32' 35'' + ( 272⁰ 12' 30'' - 180⁰ ) = 251⁰ 45' 5''
P9 - AS = 167⁰ 21' 55'' + ( 273⁰ 54' 55'' - 180⁰ ) = 261⁰ 16' 50''
BJ = 167⁰ 21' 55'' + ( 270⁰ 15' 25'' - 180⁰ ) = 257⁰ 37' 20''
A1 = 167⁰ 21' 55'' + ( 269⁰ 32' 35'' - 180⁰ ) = 256⁰ 54' 30''
A2 = 167⁰ 21' 55'' + ( 267⁰ 55' 10'' - 180⁰ ) = 255⁰ 17' 5''
P10 - AS = 173⁰ 57' 5'' + ( 269⁰ 10' 55'' - 180⁰ ) = 263⁰ 7' 60''
BJ = 173⁰ 57' 5'' + ( 272⁰ 25' 30'' - 180⁰ ) = 266⁰ 22' 35''
A1 = 173⁰ 57' 5'' + ( 273⁰ 25' 40'' - 180⁰ ) = 267⁰ 22' 45''
A2 = 173⁰ 57' 5'' + ( 273⁰ 4' 15'' - 180⁰ ) = 267⁰ 1' 20''
P11 - AS = 155⁰ 57' 20'' + ( 268⁰ 25' 20'' - 180⁰ ) = 244⁰ 22' 40''
BJ = 155⁰ 57' 20'' + ( 267⁰ 8' 40'' - 180⁰ ) = 243⁰ 6' 0''
A1 = 155⁰ 57' 20'' + ( 267⁰ 8' 40'' - 180⁰ ) = 243⁰ 6' 0''
A2 = 155⁰ 57' 20'' + ( 265⁰ 27' 15'' - 180⁰ ) = 241⁰ 24' 35''
P12 - AS = 166⁰ 10' 45'' + ( 260⁰ 42' 10'' - 180⁰ ) = 246⁰ 52' 55''
BJ = 166⁰ 10' 45'' + ( 265⁰ 38' 55'' - 180⁰ ) = 251⁰ 49' 40''
A1 = 166⁰ 10' 45'' + ( 267⁰ 26' 0'' - 180⁰ ) = 253⁰ 36' 45''
A2 = 166⁰ 10' 45'' + ( 271⁰ 15' 40'' - 180⁰ ) = 257⁰ 26' 25''
P13 - AJ = 165⁰ 29' 20'' + ( 260⁰ 49' 20'' - 180⁰ ) = 246⁰ 18' 40''
BJ = 165⁰ 29' 20'' + ( 259⁰ 1' 20'' - 180⁰ ) = 244⁰ 30' 40''
A1 = 165⁰ 29' 20'' + ( 258⁰ 26' 55'' - 180⁰ ) = 243⁰ 56' 15''
A2 = 165⁰ 29' 20'' + ( 258⁰ 40' 35'' - 180⁰ ) = 244⁰ 9' 55''
A3 = 165⁰ 29' 20'' + ( 255⁰ 55' 50'' - 180⁰ ) = 241⁰ 25' 10''
P14 - AJ = 155⁰ 24' 40'' + ( 248⁰ 55' 25'' - 180⁰ ) = 224⁰ 20' 5''
BJ = 155⁰ 24' 40'' + ( 251⁰ 48' 15'' - 180⁰ ) = 227⁰ 12' 55''
A1 = 155⁰ 24' 40'' + ( 251⁰ 48' 15'' - 180⁰ ) = 227⁰ 12' 55''
A2 = 155⁰ 24' 40'' + ( 252⁰ 58' 30'' - 180⁰ ) = 228⁰ 23' 10''
P15 - AJ = 145⁰ 42' 55'' + ( 206⁰ 30' 55'' - 180⁰ ) = 172⁰ 13' 50''
BJ = 145⁰ 42' 55'' + ( 208⁰ 46' 50'' - 180⁰ ) = 174⁰ 29' 45''
A1 = 145⁰ 42' 55'' + ( 209⁰ 46' 20'' - 180⁰ ) = 175⁰ 29' 15''
A2 = 145⁰ 42' 55'' + ( 208⁰ 56' 20'' - 180⁰ ) = 174⁰ 39' 15''
P16 - AJ = 111⁰ 27' 45'' + ( 298⁰ 24' 20'' - 180⁰ ) = 229⁰ 52' 5''
BJ = 111⁰ 27' 45'' + ( 288⁰ 9' 30'' - 180⁰ ) = 219⁰ 37' 15''
A1 = 111⁰ 27' 45'' + ( 287⁰ 49' 5'' - 180⁰ ) = 219⁰ 16' 50''
A2 = 111⁰ 27' 45'' + ( 288⁰ 10' 45'' - 180⁰ ) = 219⁰ 38' 30''
AJ1 = 111⁰ 27' 45'' + ( 191⁰ 44' 20'' - 180⁰ ) = 123⁰ 12' 5''
AJ2 = 111⁰ 27' 45'' + ( 185⁰ 14' 15'' - 180⁰ ) = 116⁰ 41' 60''
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Rumus :
m = 90◦ - V
P0 - AJ = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25''
BJ = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25''
D1 = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25''
D2 = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25''
D3 = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25''
D4 = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25''
P1 - AJ = 90⁰ - 92⁰ 9' 0'' = -3⁰ 50' 60''
BJ = 90⁰ - 92⁰ 8' 55'' = -3⁰ 51' 5''
D1 = 90⁰ - 92⁰ 8' 55'' = -3⁰ 51' 5''
D2 = 90⁰ - 92⁰ 8' 55'' = -3⁰ 51' 5''
D3 = 90⁰ - 92⁰ 8' 55'' = -3⁰ 51' 5''
D4 = 90⁰ - 92⁰ 8' 55'' = -3⁰ 51' 5''
P2 - AS = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0''
BJ = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0''
D1 = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0''
D2 = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0''
D3 = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0''
D4 = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0''
P3 - AS = 90⁰ - 94⁰ 11' 35'' = -5⁰ 48' 25''
BJ = 90⁰ - 95⁰ 42' 40'' = -6⁰ 17' 20''
D1 = 90⁰ - 91⁰ 54' 45'' = -2⁰ 5' 15''
D2 = 90⁰ - 91⁰ 54' 45'' = -2⁰ 5' 15''
D3 = 90⁰ - 91⁰ 54' 45'' = -2⁰ 5' 15''
D4 = 90⁰ - 91⁰ 54' 45'' = -2⁰ 5' 15''
P4 - AS = 90⁰ - 92⁰ 16' 25'' = -3⁰ 43' 35''
BJ = 90⁰ - 92⁰ 16' 26'' = -3⁰ 43' 34''
D1 = 90⁰ - 92⁰ 16' 25'' = -3⁰ 43' 35''
D2 = 90⁰ - 92⁰ 16' 25'' = -3⁰ 43' 35''
D3 = 90⁰ - 92⁰ 16' 25'' = -3⁰ 43' 35''
D4 = 90⁰ - 92⁰ 16' 25'' = -3⁰ 43' 35''
P5 - AJ = 90⁰ - 93⁰ 8' 15'' = -4⁰ 51' 45''
BJ = 90⁰ - 93⁰ 8' 15'' = -4⁰ 51' 45''
A1 = 90⁰ - 93⁰ 8' 15'' = -4⁰ 51' 45''
A2 = 90⁰ - 93⁰ 8' 15'' = -4⁰ 51' 45''
P6 - AJ = 90⁰ - 96⁰ 11' 40'' = -7⁰ 48' 20''
BJ = 90⁰ - 96⁰ 11' 40'' = -7⁰ 48' 20''
A1 = 90⁰ - 96⁰ 11' 40'' = -7⁰ 48' 20''
A2 = 90⁰ - 96⁰ 11' 40'' = -7⁰ 48' 20''
P7 - AJ = 90⁰ - 96⁰ 28' 30'' = -7⁰ 31' 30''
BJ = 90⁰ - 96⁰ 28' 30'' = -7⁰ 31' 30''
A1 = 90⁰ - 96⁰ 28' 30'' = -7⁰ 31' 30''
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A2 = 90⁰ - 96⁰ 28' 30'' = -7⁰ 31' 30''


LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P8 - AJ = 90⁰ - 100⁰ 28' 45'' = -11⁰ 31' 15'' 4.3.2.4. Perhitu


BJ = 90⁰ - 100⁰ 28' 45'' = -11⁰ 31' 15''
A1 = 90⁰ - 94⁰ 19' 10'' = -5⁰ 40' 50''
A2 = 90⁰ - 91⁰ 36' 25'' = -2⁰ 23' 35''
P9 - AS = 90⁰ - 103⁰ 51' 35'' = -14⁰ 8' 25''
BJ = 90⁰ - 98⁰ 25' 30'' = -9⁰ 34' 30''
A1 = 90⁰ - 98⁰ 25' 30'' = -9⁰ 34' 30''
A2 = 90⁰ - 98⁰ 25' 30'' = -9⁰ 34' 30''
P10 - AS = 90⁰ - 94⁰ 9' 40'' = -5⁰ 50' 20''
BJ = 90⁰ - 94⁰ 99' 40'' = -6⁰ 20' 20''
A1 = 90⁰ - 94⁰ 9' 40'' = -5⁰ 50' 20''
A2 = 90⁰ - 94⁰ 9' 40'' = -5⁰ 50' 20''
P11 - AS = 90⁰ - 88⁰ 18' 30'' = 1⁰ 41' 30''
BJ = 90⁰ - 88⁰ 18' 35'' = 1⁰ 41' 25''
A1 = 90⁰ - 88⁰ 18' 35'' = 1⁰ 41' 25''
A2 = 90⁰ - 88⁰ 18' 30'' = 1⁰ 41' 30''
P12 - AS = 90⁰ - 96⁰ 58' 55'' = -7⁰ 1' 5''
BJ = 90⁰ - 96⁰ 58' 5'' = -7⁰ 1' 55''
A1 = 90⁰ - 96⁰ 58' 10'' = -7⁰ 1' 50''
A2 = 90⁰ - 96⁰ 52' 0'' = -7⁰ 8' 0''
P13 - AJ = 90⁰ - 99⁰ 36' 0'' = -10⁰ 24' 0''
BJ = 90⁰ - 99⁰ 36' 0'' = -10⁰ 24' 0''
A1 = 90⁰ - 99⁰ 36' 0'' = -10⁰ 24' 0''
A2 = 90⁰ - 99⁰ 36' 0'' = -10⁰ 24' 0''
A3 = 90⁰ - 99⁰ 36' 0'' = -10⁰ 24' 0''
P14 - AJ = 90⁰ - 97⁰ 13' 10'' = -8⁰ 46' 50''
BJ = 90⁰ - 97⁰ 13' 15'' = -8⁰ 46' 45''
A1 = 90⁰ - 97⁰ 13' 15'' = -8⁰ 46' 45''
A2 = 90⁰ - 97⁰ 13' 15'' = -8⁰ 46' 45''
P15 - AJ = 90⁰ - 98⁰ 42' 55'' = -9⁰ 17' 5''
BJ = 90⁰ - 98⁰ 42' 55'' = -9⁰ 17' 5''
A1 = 90⁰ - 98⁰ 59' 10'' = -9⁰ 0' 50''
A2 = 90⁰ - 98⁰ 59' 5'' = -9⁰ 0' 55''
P16 - AJ = 90⁰ - 95⁰ 8' 30'' = -6⁰ 51' 30''
BJ = 90⁰ - 95⁰ 8' 30'' = -6⁰ 51' 30''
A1 = 90⁰ - 95⁰ 8' 30'' = -6⁰ 51' 30''
A2 = 90⁰ - 95⁰ 8' 30'' = -6⁰ 51' 30''
AJ1 = 90⁰ - 95⁰ 15' 35'' = -6⁰ 44' 25''
AJ2 = 90⁰ - 95⁰ 14' 35'' = -6⁰ 45' 25''
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3.2.4. Perhitungan Jarak Optis Patok Detail P8


Rumus :
Dopt = (Ba - Bb) x 100
P0 - AJ = ( 1.254 - 1.222 ) x 100 = 3.2 m
BJ = ( 1.180 - 1.128 ) x 100 = 5.2 m P9
D1 = ( 1.234 - 1.176 ) x 100 = ###
D2 = ( 1.762 - 1.702 ) x 100 = ###
D3 = ( 1.745 - 1.683 ) x 100 = ###
D4 = ( 1.215 - 1.152 ) x 100 = ### P10
P1 - AJ = ( 1.260 - 1.230 ) x 100 = 3m
BJ = ( 1.255 - 1.209 ) x 100 = ###
D1 = ( 1.209 - 1.155 ) x 100 = ###
D2 = ( 1.754 - 1.696 ) x 100 = ### P11
D3 = ( 1.733 - 1.674 ) x 100 = ###
D4 = ( 1.175 - 1.113 ) x 100 = ###
P2 - AS = ( 1.312 - 1.286 ) x 100 = 2.6 m
BJ = ( 1.314 - 1.262 ) x 100 = 5.2 m P12
D1 = ( 1.465 - 1.397 ) x 100 = ###
D2 = ( 2.018 - 1.946 ) x 100 = ###
D3 = ( 2.004 - 1.931 ) x 100 = 7.3 m
D4 = ( 1.484 - 1.410 ) x 100 = ### P13
P3 - AS = ( 1.011 - 0.979 ) x 100 = ###
BJ = ( 0.522 - 0.456 ) x 100 = 6.6 m
D1 = ( 0.980 - 0.900 ) x 100 = 8m
D2 = ( 1.524 - 1.443 ) x 100 = 8.1 m
D3 = ( 1.630 - 1.548 ) x 100 = ### P14
D4 = ( 0.977 - 0.894 ) x 100 = ###
P4 - AS = ( 1.160 - 1.150 ) x 100 = 1m
BJ = ( 1.018 - 0.962 ) x 100 = ###
D1 = ( 0.922 - 0.848 ) x 100 = 7.4 m P15
D2 = ( 1.421 - 1.346 ) x 100 = 7.5 m
D3 = ( 1.401 - 1.319 ) x 100 = ###
D4 = ( 0.882 - 0.799 ) x 100 = ###
P5 - AJ = ( 1.225 - 1.199 ) x 100 = 2.6 m P16
BJ = ( 1.180 - 1.128 ) x 100 = 5.2 m
A1 = ( 0.946 - 0.880 ) x 100 = ###
A2 = ( 0.865 - 0.787 ) x 100 = ###
P6 - AJ = ( 1.135 - 1.115 ) x 100 = 2m
BJ = ( 0.983 - 0.953 ) x 100 = 3m
A1 = ( 0.933 - 0.893 ) x 100 = 4m
A2 = ( 0.812 - 0.762 ) x 100 = 5m
P7 - AJ = ( 1.153 - 1.133 ) x 100 = 2m
BJ = ( 0.797 - 0.751 ) x 100 = 4.6 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A1 = ( 0.773 - 0.725 ) x 100 = ###


A2 = ( 0.714 - 0.665 ) x 100 = 4.9 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

- AJ = ( 0.945 - 0.921 ) x 100 = ### 4.3.2.5. Perhitungan J


BJ = ( 0.610 - 0.576 ) x 100 = ### Rumus :
A1 = ( 1.158 - 1.084 ) x 100 = ### D = Doptis . C
A2 = ( 1.280 - 1.205 ) x 100 = 7.5 m P0 -
- AS = ( 0.845 - 0.825 ) x 100 = 2m
BJ = ( 0.822 - 0.788 ) x 100 = ###
A1 = ( 0.803 - 0.765 ) x 100 = 3.8 m
A2 = ( 1.225 - 1.165 ) x 100 = ###
- AS = ( 1.410 - 1.388 ) x 100 = ###
BJ = ( 1.325 - 1.275 ) x 100 = 5m P1 -
A1 = ( 1.370 - 1.310 ) x 100 = ###
A2 = ( 1.331 - 1.270 ) x 100 = ###
- AS = ( 1.436 - 1.412 ) x 100 = 2.4 m
BJ = ( 1.651 - 1.599 ) x 100 = 5.2 m
A1 = ( 1.790 - 1.728 ) x 100 = ###
A2 = ( 1.800 - 1.730 ) x 100 = ### P2 -
- AS = ( 1.255 - 1.210 ) x 100 = ###
BJ = ( 1.034 - 0.983 ) x 100 = ###
A1 = ( 1.017 - 0.949 ) x 100 = ###
A2 = ( 0.727 - 0.650 ) x 100 = ###
- AJ = ( 1.064 - 1.044 ) x 100 = 2m
BJ = ( 0.882 - 0.840 ) x 100 = ### P3 -
A1 = ( 0.864 - 0.817 ) x 100 = ###
A2 = ( 1.177 - 1.129 ) x 100 = 4.8 m
A3 = ( 1.185 - 1.122 ) x 100 = ###
- AJ = ( 1.325 - 1.309 ) x 100 = 1.6 m
BJ = ( 1.207 - 1.173 ) x 100 = 3.4 m
A1 = ( 1.328 - 1.288 ) x 100 = 4m P4 -
A2 = ( 1.452 - 1.400 ) x 100 = 5.2 m
- AJ = ( 1.136 - 1.110 ) x 100 = ###
BJ = ( 0.965 - 0.917 ) x 100 = ###
A1 = ( 0.918 - 0.852 ) x 100 = ###
A2 = ( 0.550 - 0.458 ) x 100 = 9.2 m
- AJ = ( 1.241 - 1.215 ) x 100 = 2.6 m P5 -
BJ = ( 1.082 - 1.025 ) x 100 = ###
A1 = ( 1.079 - 1.014 ) x 100 = 6.5 m
A2 = ( 0.912 - 0.826 ) x 100 = ###
AJ1 = ( 1.443 - 1.350 ) x 100 = 9.3 m P6 -
AJ2 = ( 1.355 - 1.261 ) x 100 = ###

P7 -
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3.2.5. Perhitungan Jarak Datar Patok Detail P8 -


Rumus :
D = Doptis . Cos2 . m
AJ = 3.2 . Cos 2 . -5⁰ 10' 25'' = 3.18 m
BJ = 5.2 . Cos 2 . -5⁰ 10' 25'' = 5.16 m P9 -
D1 = 5.8 . Cos 2 . -5⁰ 10' 25'' = 5.76 m
D2 = 6 . Cos 2 . -5⁰ 10' 25'' = 5.96 m
D3 = 6.2 . Cos 2 . -5⁰ 10' 25'' = 6.16 m
D4 = 6.3 . Cos 2 . -5⁰ 10' 25'' = 6.26 m P10 -
AJ = 3 . Cos 2 . -3⁰ 50' 60'' = 3.00 m
BJ = 4.6 . Cos 2 . -3⁰ 51' 5'' = 4.59 m
D1 = 5.4 . Cos 2 . -3⁰ 51' 5'' = 5.39 m
D2 = 5.8 . Cos 2 . -3⁰ 51' 5'' = 5.79 m P11 -
D3 = 5.9 . Cos 2 . -3⁰ 51' 5'' = 5.89 m
D4 = 6.2 . Cos 2 . -3⁰ 51' 5'' = 6.19 m
AS = 2.6 . Cos 2 . -3⁰ 26' 0'' = 2.59 m
BJ = 5.2 . Cos 2 . -3⁰ 26' 0'' = 5.19 m P12 -
D1 = 6.8 . Cos 2 . -3⁰ 26' 0'' = 6.79 m
D2 = 7.2 . Cos 2 . -3⁰ 26' 0'' = 7.19 m
D3 = 7.3 . Cos 2 . -3⁰ 26' 0'' = 7.29 m
D4 = 7.4 . Cos 2 . -3⁰ 26' 0'' = 7.39 m P13 -
AS = 3.2 . Cos 2 . -5⁰ 48' 25'' = 3.18 m
BJ = 6.6 . Cos 2 . -6⁰ 17' 20'' = 6.53 m
D1 = 8 . Cos 2 . -2⁰ 5' 15'' = 7.99 m
D2 = 8.1 . Cos 2 . -2⁰ 5' 15'' = 8.09 m
D3 = 8.2 . Cos 2 . -2⁰ 5' 15'' = 8.19 m P14 -
D4 = 8.3 . Cos 2 . -2⁰ 5' 15'' = 8.29 m
AS = 1 . Cos 2 . -3⁰ 43' 35'' = 1.00 m
BJ = 5.6 . Cos 2 . -3⁰ 43' 34'' = 5.59 m
D1 = 7.4 . Cos 2 . -3⁰ 43' 35'' = 7.39 m P15 -
D2 = 7.5 . Cos 2 . -3⁰ 43' 35'' = 7.49 m
D3 = 8.2 . Cos 2 . -3⁰ 43' 35'' = 8.19 m
D4 = 8.3 . Cos 2 . -3⁰ 43' 35'' = 8.29 m
AJ = 2.6 . Cos 2 . -4⁰ 51' 45'' = 2.59 m P16 -
BJ = 5.2 . Cos 2 . -4⁰ 51' 45'' = 5.18 m
A1 = 6.6 . Cos 2 . -4⁰ 51' 45'' = 6.58 m
A2 = 7.8 . Cos 2 . -4⁰ 51' 45'' = 7.78 m
AJ = 2 . Cos 2 . -7⁰ 48' 20'' = 1.98 m
BJ = 3 . Cos 2 . -7⁰ 48' 20'' = 2.97 m
A1 = 4 . Cos 2 . -7⁰ 48' 20'' = 3.95 m
A2 = 5 . Cos 2 . -7⁰ 48' 20'' = 4.94 m
AJ = 2 . Cos 2 . -7⁰ 31' 30'' = 1.97 m
BJ = 4.6 . Cos 2 . -7⁰ 31' 30'' = 4.54 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A1 = 4.8 . Cos 2 . -7⁰ 31' 30'' = 4.74 m


A2 = 4.9 . Cos 2 . -7⁰ 31' 30'' = 4.84 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

AJ = 2.4 . Cos 2 . -11⁰ 31' 15'' = 2.32 m 4.3.2.6. Perhitungan D.Sin


BJ = 3.4 . Cos 2 . -11⁰ 31' 15'' = 3.29 m A. Menghitung Dx
A1 = 7.4 . Cos 2 . -5⁰ 40' 50'' = 7.36 m Rumus :
A2 = 7.5 . Cos 2 . -2⁰ 23' 35'' = 7.49 m P0 - AJ
AS = 2 . Cos 2 . -14⁰ 8' 25'' = 1.89 m BJ
BJ = 3.4 . Cos 2 . -9⁰ 34' 30'' = 3.33 m D1
A1 = 3.8 . Cos 2 . -9⁰ 34' 30'' = 3.72 m D2
A2 = 6 . Cos 2 . -9⁰ 34' 30'' = 5.87 m D3
AS = 2.2 . Cos 2 . -5⁰ 50' 20'' = 2.19 m D4
BJ = 5 . Cos 2 . -6⁰ 20' 20'' = 4.95 m P1 - AJ
A1 = 6 . Cos 2 . -5⁰ 50' 20'' = 5.97 m BJ
A2 = 6.1 . Cos 2 . -5⁰ 50' 20'' = 6.07 m D1
AS = 2.4 . Cos 2 . 1⁰ 41' 30'' = 2.40 m D2
BJ = 5.2 . Cos 2 . 1⁰ 41' 25'' = 5.20 m D3
A1 = 6.2 . Cos 2 . 1⁰ 41' 25'' = 6.19 m D4
A2 = 7 . Cos 2 . 1⁰ 41' 30'' = 6.99 m P2 - AS
AS = 4.5 . Cos 2 . -7⁰ 1' 5'' = 4.43 m BJ
BJ = 5.1 . Cos 2 . -7⁰ 1' 55'' = 5.02 m D1
A1 = 6.8 . Cos 2 . -7⁰ 1' 50'' = 6.70 m D2
A2 = 7.7 . Cos 2 . -7⁰ 8' 0'' = 7.59 m D3
AJ = 2 . Cos 2 . -10⁰ 24' 0'' = 1.94 m D4
BJ = 4.2 . Cos 2 . -10⁰ 24' 0'' = 4.08 m P3 - AS
A1 = 4.7 . Cos 2 . -10⁰ 24' 0'' = 4.57 m BJ
A2 = 4.8 . Cos 2 . -10⁰ 24' 0'' = 4.67 m D1
A3 = 6.3 . Cos 2 . -10⁰ 24' 0'' = 6.12 m D2
AJ = 1.6 . Cos 2 . -8⁰ 46' 50'' = 1.57 m D3
BJ = 3.4 . Cos 2 . -8⁰ 46' 45'' = 3.35 m D4
A1 = 4 . Cos 2 . -8⁰ 46' 45'' = 3.94 m P4 - AS
A2 = 5.2 . Cos 2 . -8⁰ 46' 45'' = 5.12 m BJ
AJ = 2.6 . Cos 2 . -9⁰ 17' 5'' = 2.54 m D1
BJ = 4.8 . Cos 2 . -9⁰ 17' 5'' = 4.69 m D2
A1 = 6.6 . Cos 2 . -9⁰ 0' 50'' = 6.44 m D3
A2 = 9.2 . Cos 2 . -9⁰ 0' 55'' = 8.98 m D4
AJ = 2.6 . Cos 2 . -6⁰ 51' 30'' = 2.58 m P5 - AJ
BJ = 5.7 . Cos 2 . -6⁰ 51' 30'' = 5.65 m BJ
A1 = 6.5 . Cos 2 . -6⁰ 51' 30'' = 6.45 m A1
A2 = 8.6 . Cos 2 . -6⁰ 51' 30'' = 8.53 m A2
AJ1 = 9.3 . Cos 2 . -6⁰ 44' 25'' = 9.22 m P6 - AJ
AJ2 = 9.4 . Cos 2 . -6⁰ 45' 25'' = 9.32 m BJ
∑ = 430.77 m A1
A2
P7 - AJ
BJ
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A1
A2
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

.2.6. Perhitungan D.Sin & D.Cos Patok Detail P8 - AJ =


Menghitung Dx BJ =
Dx = D sin a A1 =
= 3.18 . Sin . 189⁰ 32' 50'' = -0.53 m A2 =
= 5.16 . Sin . 189⁰ 0' 35'' = -0.81 m P9 - AS =
= 5.76 . Sin . 189⁰ 19' 50'' = -0.93 m BJ =
= 5.96 . Sin . 190⁰ 36' 25'' = -1.10 m A1 =
= 6.16 . Sin . 190⁰ 38' 50'' = -1.14 m A2 =
= 6.26 . Sin . 191⁰ 1' 40'' = -1.20 m P10 - AS =
= 3.00 . Sin . 266⁰ 24' 40'' = -2.99 m BJ =
= 4.59 . Sin . 267⁰ 55' 45'' = -4.59 m A1 =
= 5.39 . Sin . 268⁰ 1' 15'' = -5.39 m A2 =
= 5.79 . Sin . 268⁰ 1' 15'' = -5.79 m P11 - AS =
= 5.89 . Sin . 267⁰ 54' 55'' = -5.89 m BJ =
= 6.19 . Sin . 267⁰ 58' 40'' = -6.19 m A1 =
= 2.59 . Sin . 227⁰ 24' 25'' = -1.91 m A2 =
= 5.19 . Sin . 228⁰ 45' 30'' = -3.90 m P12 - AS =
= 6.79 . Sin . 230⁰ 18' 0'' = -5.22 m BJ =
= 7.19 . Sin . 230⁰ 37' 10'' = -5.55 m A1 =
= 7.29 . Sin . 230⁰ 23' 40'' = -5.61 m A2 =
= 7.39 . Sin . 230⁰ 23' 40'' = -5.69 m P13 - AJ =
= 3.18 . Sin . 230⁰ 15' 40'' = -2.45 m BJ =
= 6.53 . Sin . 230⁰ 43' 10'' = -5.06 m A1 =
= 7.99 . Sin . 229⁰ 42' 10'' = -6.09 m A2 =
= 8.09 . Sin . 229⁰ 6' 30'' = -6.12 m A3 =
= 8.19 . Sin . 228⁰ 45' 25'' = -6.16 m P14 - AJ =
= 8.29 . Sin . 228⁰ 43' 40'' = -6.23 m BJ =
= 1.00 . Sin . 237⁰ 53' 10'' = -0.85 m A1 =
= 5.59 . Sin . 240⁰ 0' 35'' = -4.84 m A2 =
= 7.39 . Sin . 245⁰ 49' 25'' = -6.74 m P15 - AJ =
= 7.49 . Sin . 241⁰ 51' 15'' = -6.60 m BJ =
= 8.19 . Sin . 241⁰ 40' 20'' = -7.21 m A1 =
= 8.29 . Sin . 241⁰ 40' 20'' = -7.29 m A2 =
= 2.59 . Sin . 256⁰ 7' 35'' = -2.52 m P16 - AJ =
= 5.18 . Sin . 254⁰ 14' 10'' = -4.99 m BJ =
= 6.58 . Sin . 253⁰ 50' 5'' = -6.32 m A1 =
= 7.78 . Sin . 254⁰ 37' 5'' = -7.50 m A2 =
= 1.98 . Sin . 215⁰ 42' 45'' = -1.15 m AJ1 =
= 2.97 . Sin . 216⁰ 0' 25'' = -1.74 m AJ2 =
= 3.95 . Sin . 216⁰ 29' 50'' = -2.35 m
= 4.94 . Sin . 215⁰ 54' 25'' = -2.90 m
= 1.97 . Sin . 264⁰ 9' 15'' = -1.96 m
= 4.54 . Sin . 273⁰ 58' 20'' = -4.53 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

= 4.74 . Sin . 272⁰ 23' 35'' = -4.73 m


= 4.84 . Sin . 271⁰ 53' 50'' = -4.84 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

2.32 . Sin . 258⁰ 58' 54'' = -2.28 m B. Menghitung Dy


3.29 . Sin . 254⁰ 58' 50'' = -3.18 m Rumus : Dy
7.36 . Sin . 251⁰ 0' 5'' = -6.96 m P0 - AJ =
7.49 . Sin . 251⁰ 45' 5'' = -7.12 m BJ =
1.89 . Sin . 261⁰ 16' 50'' = -1.86 m D1 =
3.33 . Sin . 257⁰ 37' 20'' = -3.25 m D2 =
3.72 . Sin . 256⁰ 54' 30'' = -3.62 m D3 =
5.87 . Sin . 255⁰ 17' 5'' = -5.68 m D4 =
2.19 . Sin . 263⁰ 7' 60'' = -2.17 m P1 - AJ =
4.95 . Sin . 266⁰ 22' 35'' = -4.94 m BJ =
5.97 . Sin . 267⁰ 22' 45'' = -5.96 m D1 =
6.07 . Sin . 267⁰ 1' 20'' = -6.06 m D2 =
2.40 . Sin . 244⁰ 22' 40'' = -2.16 m D3 =
5.20 . Sin . 243⁰ 6' 0'' = -4.63 m D4 =
6.19 . Sin . 243⁰ 6' 0'' = -5.52 m P2 - AS =
6.99 . Sin . 241⁰ 24' 35'' = -6.14 m BJ =
4.43 . Sin . 246⁰ 52' 55'' = -4.08 m D1 =
5.02 . Sin . 251⁰ 49' 40'' = -4.77 m D2 =
6.70 . Sin . 253⁰ 36' 45'' = -6.43 m D3 =
7.59 . Sin . 257⁰ 26' 25'' = -7.41 m D4 =
1.94 . Sin . 246⁰ 18' 40'' = -1.78 m P3 - AS =
4.08 . Sin . 244⁰ 30' 40'' = -3.69 m BJ =
4.57 . Sin . 243⁰ 56' 15'' = -4.10 m D1 =
4.67 . Sin . 244⁰ 9' 55'' = -4.20 m D2 =
6.12 . Sin . 241⁰ 25' 10'' = -5.38 m D3 =
1.57 . Sin . 224⁰ 20' 5'' = -1.10 m D4 =
3.35 . Sin . 227⁰ 12' 55'' = -2.46 m P4 - AS =
3.94 . Sin . 227⁰ 12' 55'' = -2.89 m BJ =
5.12 . Sin . 228⁰ 23' 10'' = -3.83 m D1 =
2.54 . Sin . 172⁰ 13' 50'' = 0.34 m D2 =
4.69 . Sin . 174⁰ 29' 45'' = 0.45 m D3 =
6.44 . Sin . 175⁰ 29' 15'' = 0.51 m D4 =
8.98 . Sin . 174⁰ 39' 15'' = 0.84 m P5 - AJ =
2.58 . Sin . 229⁰ 52' 5'' = -1.97 m BJ =
5.65 . Sin . 219⁰ 37' 15'' = -3.61 m A1 =
6.45 . Sin . 219⁰ 16' 50'' = -4.08 m A2 =
8.53 . Sin . 219⁰ 38' 30'' = -5.44 m P6 - AJ =
9.22 . Sin . 123⁰ 12' 5'' = 7.72 m BJ =
9.32 . Sin . 116⁰ 41' 60'' = 8.33 m A1 =
∑ = -296.17 m A2 =
P7 - AJ =
BJ =
A1 =
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A2 =
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

enghitung Dy P8 - AJ =
= D . Cos . a BJ =
3.18 . Cos . 189⁰ 32' 50'' = -3.13 m A1 =
5.16 . Cos . 189⁰ 0' 35'' = -5.10 m A2 =
5.76 . Cos . 189⁰ 19' 50'' = -5.68 m P9 - AS =
5.96 . Cos . 190⁰ 36' 25'' = -5.86 m BJ =
6.16 . Cos . 190⁰ 38' 50'' = -6.05 m A1 =
6.26 . Cos . 191⁰ 1' 40'' = -6.14 m A2 =
3.00 . Cos . 266⁰ 24' 40'' = -0.19 m P10 - AS =
4.59 . Cos . 267⁰ 55' 45'' = -0.17 m BJ =
5.39 . Cos . 268⁰ 1' 15'' = -0.19 m A1 =
5.79 . Cos . 268⁰ 1' 15'' = -0.20 m A2 =
5.89 . Cos . 267⁰ 54' 55'' = -0.21 m P11 - AS =
6.19 . Cos . 267⁰ 58' 40'' = -0.22 m BJ =
2.59 . Cos . 227⁰ 24' 25'' = -1.76 m A1 =
5.19 . Cos . 228⁰ 45' 30'' = -3.42 m A2 =
6.79 . Cos . 230⁰ 18' 0'' = -4.33 m P12 - AS =
7.19 . Cos . 230⁰ 37' 10'' = -4.56 m BJ =
7.29 . Cos . 230⁰ 23' 40'' = -4.64 m A1 =
7.39 . Cos . 230⁰ 23' 40'' = -4.71 m A2 =
3.18 . Cos . 230⁰ 15' 40'' = -2.03 m P13 - AJ =
6.53 . Cos . 230⁰ 43' 10'' = -4.14 m BJ =
7.99 . Cos . 229⁰ 42' 10'' = -5.17 m A1 =
8.09 . Cos . 229⁰ 6' 30'' = -5.30 m A2 =
8.19 . Cos . 228⁰ 45' 25'' = -5.40 m A3 =
8.29 . Cos . 228⁰ 43' 40'' = -5.47 m P14 - AJ =
1.00 . Cos . 237⁰ 53' 10'' = -0.53 m BJ =
5.59 . Cos . 240⁰ 0' 35'' = -2.79 m A1 =
7.39 . Cos . 245⁰ 49' 25'' = -3.03 m A2 =
7.49 . Cos . 241⁰ 51' 15'' = -3.53 m P15 - AJ =
8.19 . Cos . 241⁰ 40' 20'' = -3.88 m BJ =
8.29 . Cos . 241⁰ 40' 20'' = -3.93 m A1 =
2.59 . Cos . 256⁰ 7' 35'' = -0.62 m A2 =
5.18 . Cos . 254⁰ 14' 10'' = -1.41 m P16 - AJ =
6.58 . Cos . 253⁰ 50' 5'' = -1.83 m BJ =
7.78 . Cos . 254⁰ 37' 5'' = -2.06 m A1 =
1.98 . Cos . 215⁰ 42' 45'' = -1.61 m A2 =
2.97 . Cos . 216⁰ 0' 25'' = -2.40 m AJ1 =
3.95 . Cos . 216⁰ 29' 50'' = -3.18 m AJ2 =
4.94 . Cos . 215⁰ 54' 25'' = -4.00 m
1.97 . Cos . 264⁰ 9' 15'' = -0.20 m
4.54 . Cos . 273⁰ 58' 20'' = 0.31 m
4.74 . Cos . 272⁰ 23' 35'' = 0.20 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.84 . Cos . 271⁰ 53' 50'' = 0.16 m


LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

2.32 . Cos . 258⁰ 58' 54'' = -0.44 m 4.3.2.7. Perhitungan Kordinat T


3.29 . Cos . 254⁰ 58' 50'' = -3.18 m Data Kordinat Awal :
7.36 . Cos . 251⁰ 0' 5'' = -6.96 m
7.49 . Cos . 251⁰ 45' 5'' = -7.12 m A. arah x
1.89 . Cos . 261⁰ 16' 50'' = -1.86 m Rumus : x = Xawal
3.33 . Cos . 257⁰ 37' 20'' = -3.25 m P0 - AJ = 22
3.72 . Cos . 256⁰ 54' 30'' = -3.62 m BJ = 22
5.87 . Cos . 255⁰ 17' 5'' = -5.68 m D1 = 22
2.19 . Cos . 263⁰ 7' 60'' = -2.17 m D2 = 22
4.95 . Cos . 266⁰ 22' 35'' = -4.94 m D3 = 22
5.97 . Cos . 267⁰ 22' 45'' = -5.96 m D4 = 22
6.07 . Cos . 267⁰ 1' 20'' = -6.06 m P1 - AJ = 7.5
2.40 . Cos . 244⁰ 22' 40'' = -2.16 m BJ = 7.5
5.20 . Cos . 243⁰ 6' 0'' = -4.63 m D1 = 7.5
6.19 . Cos . 243⁰ 6' 0'' = -5.52 m D2 = 7.5
6.99 . Cos . 241⁰ 24' 35'' = -6.14 m D3 = 7.5
4.43 . Cos . 246⁰ 52' 55'' = -4.08 m D4 = 7.5
5.02 . Cos . 251⁰ 49' 40'' = -4.77 m P2 - AS = 4.7
6.70 . Cos . 253⁰ 36' 45'' = -6.43 m BJ = 4.7
7.59 . Cos . 257⁰ 26' 25'' = -7.41 m D1 = 4.7
1.94 . Cos . 246⁰ 18' 40'' = -1.78 m D2 = 4.7
4.08 . Cos . 244⁰ 30' 40'' = -3.69 m D3 = 4.7
4.57 . Cos . 243⁰ 56' 15'' = -4.10 m D4 = 4.7
4.67 . Cos . 244⁰ 9' 55'' = -4.20 m P3 - AS = 2.1
6.12 . Cos . 241⁰ 25' 10'' = -5.38 m BJ = 2.1
1.57 . Cos . 224⁰ 20' 5'' = -1.10 m D1 = 2.1
3.35 . Cos . 227⁰ 12' 55'' = -2.46 m D2 = 2.1
3.94 . Cos . 227⁰ 12' 55'' = -2.89 m D3 = 2.1
5.12 . Cos . 228⁰ 23' 10'' = -3.83 m D4 = 2.1
2.54 . Cos . 172⁰ 13' 50'' = 0.34 m P4 - AS = -4.2
4.69 . Cos . 174⁰ 29' 45'' = 0.45 m BJ = -4.2
6.44 . Cos . 175⁰ 29' 15'' = 0.51 m D1 = -4.2
8.98 . Cos . 174⁰ 39' 15'' = 0.84 m D2 = -4.2
2.58 . Cos . 229⁰ 52' 5'' = -1.97 m D3 = -4.2
5.65 . Cos . 219⁰ 37' 15'' = -3.61 m D4 = -4.2
6.45 . Cos . 219⁰ 16' 50'' = -4.08 m P5 - AJ = -4.1
8.53 . Cos . 219⁰ 38' 30'' = -5.44 m BJ = -4.1
9.22 . Cos . 123⁰ 12' 5'' = 7.72 m A1 = -4.1
9.32 . Cos . 116⁰ 41' 60'' = 8.33 m A2 = -4.1
∑ = -237.14 m P6 - AJ = -1.0
BJ = -1.0
A1 = -1.0
A2 = -1.0
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P7 - AJ = 1.5
BJ = 1.5
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

rhitungan Kordinat Titik Detail A1 =


ordinat Awal : x P0 = 22 m A2 =
y P0 = 35 m P8 - AJ =
BJ =
x = Xawal ± D sin α awal A1 =
22 + -0.527 = 21.5 m A2 =
22 + -0.809 = 21.2 m P9 - AS =
22 + -0.934 = 21.1 m BJ =
22 + -1.097 = 20.9 m A1 =
22 + -1.137 = 20.9 m A2 =
22 + -1.197 = 20.8 m P10 - AS =
7.5 + -2.990 = 4.5 m BJ =
7.5 + -4.591 = 2.9 m A1 =
7.5 + -5.389 = 2.1 m A2 =
7.5 + -5.788 = 1.7 m P11 - AS =
7.5 + -5.888 = 1.6 m BJ =
7.5 + -6.187 = 1.3 m A1 =
4.7 + -1.910 = 2.8 m A2 =
4.7 + -3.902 = 0.8 m P12 - AS =
4.7 + -5.221 = -0.5 m BJ =
4.7 + -5.554 = -0.8 m A1 =
4.7 + -5.613 = -0.9 m A2 =
4.7 + -5.690 = -0.9 m P13 - AJ =
2.1 + -2.448 = -0.3 m BJ =
2.1 + -5.058 = -2.9 m A1 =
2.1 + -6.095 = -4.0 m A2 =
2.1 + -6.116 = -4.0 m A3 =
2.1 + -6.159 = -4.0 m P14 - AJ =
2.1 + -6.231 = -4.1 m BJ =
-4.2 + -0.846 = -5.1 m A1 =
-4.2 + -4.843 = -9.1 m A2 =
-4.2 + -6.740 = -11.0 m P15 - AJ =
-4.2 + -6.603 = -10.8 m BJ =
-4.2 + -7.207 = -11.4 m A1 =
-4.2 + -7.295 = -11.5 m A2 =
-4.1 + -2.517 = -6.6 m P16 - AJ =
-4.1 + -4.989 = -9.1 m BJ =
-4.1 + -6.320 = -10.4 m A1 =
-4.1 + -7.498 = -11.6 m A2 =
-1.0 + -1.154 = -2.1 m AJ1 =
-1.0 + -1.743 = -2.7 m AJ2 =
-1.0 + -2.351 = -3.3 m
-1.0 + -2.898 = -3.9 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

1.5 + -1.964 = -0.5 m


1.5 + -4.531 = -3.1 m

L
P0 - AJ = 21 28 POI21,4730038276983,27,8666614820686 21.5
BJ = 21 26 POI21,1914339428181,25,9005153537512 21.2
D1 = 21 25 POI21,0663022856712,25,3172524912746 21.1
D2 = 21 25 POI20,9033953031993,25,1442699691255 20.9
D3 = 21 25 POI20,8625884181644,24,9498770505128 20.9
D4 = 21 25 POI20,8034361263097,24,8601064465741 20.8
P1 - AJ = 4 44 POI4,46949829975214,44,2976215737501 4.5
BJ = 3 44 POI2,86886672917293,44,3191608791853 2.9
D1 = 2 44 POI2,07020810528079,44,298915367083 2.1
D2 = 2 44 POI1,67100863608098,44,2851203426304 1.7
D3 = 2 44 POI1,57159362427498,44,2708241686961 1.6
D4 = 1 44 POI1,27197159351224,44,2666756438137 1.3
P2 - AS = 3 42 POI2,83499243635077,42,1295252836941 2.8
BJ = 1 40 POI0,842995322977923,40,4644870415196 0.8
D1 = 0 40 POI-0,476205170655769,39,5507315975996 -0.5
D2 = -1 39 POI-0,808852110380738,39,3266317841432 -0.8
D3 = -1 39 POI-0,867796775938793,39,2412341789647 -0.9
D4 = -1 39 POI-0,944687412125466,39,1776121538008 -0.9
P3 - AS = 0 39 POI-0,331985602768284,38,9514743832385 -0.3
BJ = -3 37 POI-2,94262297338518,36,8490646076105 -2.9
D1 = -4 36 POI-3,97925187696022,35,8180055396172 -4.0
D2 = -4 36 POI-4,0008147295043,35,6896610077998 -4.0
D3 = -4 36 POI-4,0433246253103,35,5863977992971 -4.0
D4 = -4 36 POI-4,11564969429412,35,5173730290007 -4.1
P4 - AS = -5 12 POI-5,06942547984643,12,0186772095722 -5.1
BJ = -9 10 POI-9,06634742897051,9,75467395078992 -9.1
D1 = ### 10 POI-10,9640789015445,9,52356550252669 -11.0
D2 = ### 9 POI-10,8264809716995,9,01713214442008 -10.8
D3 = ### 9 POI-11,4304341664947,8,66454512202653 -11.4
D4 = ### 9 POI-11,5183203706574,8,61716830077189 -11.5
P5 - AJ = -7 9 POI-6,58162290245737,8,55253067678635 -6.6
BJ = -9 8 POI-9,05446759162671,7,76562197981514 -9.1
A1 = ### 7 POI-10,3850976588575,7,34209793753893 -10.4
A2 = ### 7 POI-11,5631016647457,7,11132353029744 -11.6
P6 - AJ = -2 4 POI-2,12817655117481,4,28071831013374 -2.1
BJ = -3 3 POI-2,71744798970458,3,4871419598766 -2.7
A1 = -3 3 POI-3,32576720894623,2,7076193475607 -3.3
A2 = -4 2 POI-3,87254347710135,1,88302322904801 -3.9
P7 - AJ = 0 4 POI-0,494291227975439,4,31261657715707 -0.5
BJ = -3 5 POI-3,06058584393702,4,82833299023592 -3.1
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A1 = -3 5 POI-3,26481940400038,4,7116034004505 -3.3
A2 = -3 5 POI-3,3650286454554,4,67389025165307
P8 - AJ = 32 1 POI32,0236410204598,1,47172768057794
BJ = 31 -1 POI31,1262514916843,-1,25997093718648
A1 = 27 -5 POI27,3442672790197,-5,04195514985106
A2 = 27 -5 POI27,184273027408,-5,20194940146279
P9 - AS = 62 7 POI62,3857202759666,7,37289482462686
BJ = 61 6 POI60,9994885426871,5,98666309134735
A1 = 61 6 POI60,6273862871296,5,61456083578989
A2 = 59 4 POI58,5705418260671,3,55771637472738
P10- AS = 87 19 POI86,5813243458499,19,2685770006227
BJ = 84 16 POI83,8125960992643,16,4998487540371
A1 = 83 15 POI82,7918773999859,15,4791300547587
A2 = 83 15 POI82,6943541220768,15,3816067768497
P11- AS = 89 23 POI88,8181380448738,22,6674327178544
BJ = 86 20 POI86,3469354361962,20,1962301091768
A1 = 85 19 POI85,4559138162722,19,3052084892528
A2 = 85 19 POI84,8391550494191,18,6884497223998
P12- AS = 88 24 POI87,6032164370064,24,2676553205455
BJ = 87 24 POI86,9063907439031,23,5708296274423
A1 = 85 22 POI85,2530021539418,21,9174410374809 73
A2 = 84 21 POI84,2723991462676,20,9368380298068
P13- AJ = 89 30 POI89,1171273370412,29,9716444004809
BJ = 87 28 POI87,2119032010214,28,0664202644611 L
A1 = 87 28 POI86,7930133190529,27,6475303824927 69,94436164862
A2 = 87 28 POI86,697562662333,27,5520797257727 72,83362552474
A3 = 86 26 POI85,5192194350477,26,3737364984874 CLOSE
P14- AJ = 72 46 POI71,7331263109473,46,0495255180567
BJ = 70 45 POI70,3777512300437,44,694150437153
A1 = 70 44 POINT
A2 = 69 43 POINT
P15- AJ = 37 40 POI36,8594880396021,40,4981541758989
BJ = 37 41 POI36,965907636767,40,6045737730638
A1 = 37 41 POI37,022668363291,40,6613344995878
A2 = 37 41 POI37,3523034182774,40,9909695545742
P16- AJ = 34 9 POI34,2516340626898,8,53544764220624
BJ = 33 7 POI32,6178105188723,6,90162409838883
A1 = 32 6 POI32,1413135192837,6,42512709880019
A2 = 31 5 POI30,7809325684992,5,06474614801569
AJ1 = 44 18 POI43,9399206421375,18,223734221654
AJ2 = 45 19 POI44,5510965332396,18,8349101127561
CLOSE
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

1.5 + -4.735 = -3.3 m B. arah y


1.5 + -4.835 = -3.4 m Rumus : y = Y awal ±
34.3 + -2.278 = 32.0 m P0 - AJ = 35
34.3 + -3.175 = 31.1 m BJ = 35
34.3 + -6.957 = 27.3 m D1 = 35
34.3 + -7.117 = 27.2 m D2 = 35
64.2 + -1.863 = 62.4 m D3 = 35
64.2 + -3.250 = 61.0 m D4 = 35
64.2 + -3.622 = 60.6 m P1 - AJ = 48.5
64.2 + -5.679 = 58.6 m BJ = 48.5
88.8 + -2.173 = 86.6 m D1 = 48.5
88.8 + -4.941 = 83.8 m D2 = 48.5
88.8 + -5.962 = 82.8 m D3 = 48.5
88.8 + -6.060 = 82.7 m D4 = 48.5
91.0 + -2.162 = 88.8 m P2 - AS = 47.9
91.0 + -4.633 = 86.3 m BJ = 47.9
91.0 + -5.524 = 85.5 m D1 = 47.9
91.0 + -6.141 = 84.8 m D2 = 47.9
91.7 + -4.077 = 87.6 m D3 = 47.9
91.7 + -4.774 = 86.9 m D4 = 47.9
91.7 + -6.428 = 85.3 m P3 - AS = 45.0
91.7 + -7.408 = 84.3 m BJ = 45.0
90.9 + -1.781 = 89.1 m D1 = 45.0
90.9 + -3.686 = 87.2 m D2 = 45.0
90.9 + -4.105 = 86.8 m D3 = 45.0
90.9 + -4.200 = 86.7 m D4 = 45.0
90.9 + -5.378 = 85.5 m P4 - AS = 16.5
72.8 + -1.100 = 71.7 m BJ = 16.5
72.8 + -2.456 = 70.4 m D1 = 16.5
72.8 + -2.889 = 69.9 m D2 = 16.5
72.8 + -3.826 = 69.0 m D3 = 16.5
36.5 + 0.343 = 36.9 m D4 = 16.5
36.5 + 0.450 = 37.0 m P5 - AJ = 13.2
36.5 + 0.507 = 37.0 m BJ = 13.2
36.5 + 0.836 = 37.4 m A1 = 13.2
36.2 + -1.972 = 34.3 m A2 = 13.2
36.2 + -3.606 = 32.6 m P6 - AJ = 9.9
36.2 + -4.082 = 32.1 m BJ = 9.9
36.2 + -5.443 = 30.8 m A1 = 9.9
36.2 + 7.716 = 43.9 m A2 = 9.9
36.2 + 8.328 = 44.6 m P7 - AJ = 8.5
BJ = 8.5
A1 = 8.5
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A2 = 8.5
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

###

L
69,9443616486252,44,2607608557346 69,00733433415,43,3237335412593
72,8336255247481,47,1500247318574 72,8336255247481,47,1500247318574
CLOSE CLOSE
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P8 - AJ = 5.9
y = Y awal ± D cos α awal BJ = 5.9
35 + -3.133 = 31.9 m A1 = 5.9
35 + -5.099 = 29.9 m A2 = 5.9
35 + -5.683 = 29.3 m P9 - AS = 13.2
35 + -5.856 = 29.1 m BJ = 13.2
35 + -6.050 = 28.9 m A1 = 13.2
35 + -6.140 = 28.9 m A2 = 13.2
48.5 + -0.188 = 48.3 m P10 - AS = 25.4
48.5 + -0.166 = 48.3 m BJ = 25.4
48.5 + -0.186 = 48.3 m A1 = 25.4
48.5 + -0.200 = 48.3 m A2 = 25.4
48.5 + -0.214 = 48.3 m P11 - AS = 28.8
48.5 + -0.218 = 48.3 m BJ = 28.8
47.9 + -1.756 = 46.1 m A1 = 28.8
47.9 + -3.421 = 44.5 m A2 = 28.8
47.9 + -4.335 = 43.6 m P12 - AS = 32.3
47.9 + -4.559 = 43.3 m BJ = 32.3
47.9 + -4.644 = 43.2 m A1 = 32.3
47.9 + -4.708 = 43.2 m A2 = 32.3
45.0 + -2.035 = 43.0 m P13 - AJ = 35.8
45.0 + -4.137 = 40.8 m BJ = 35.8
45.0 + -5.168 = 39.8 m A1 = 35.8
45.0 + -5.297 = 39.7 m A2 = 35.8
45.0 + -5.400 = 39.6 m A3 = 35.8
45.0 + -5.469 = 39.5 m P14 - AJ = 51.2
16.5 + -0.531 = 16.0 m BJ = 51.2
16.5 + -2.795 = 13.8 m A1 = 51.2
16.5 + -3.026 = 13.5 m A2 = 51.2
16.5 + -3.532 = 13.0 m P15 - AJ = 44.2
16.5 + -3.885 = 12.7 m BJ = 44.2
16.5 + -3.932 = 12.6 m A1 = 44.2
13.2 + -0.622 = 12.6 m A2 = 44.2
13.2 + -1.408 = 11.8 m P16 - AJ = 14.5
13.2 + -1.832 = 11.3 m BJ = 14.5
13.2 + -2.063 = 11.1 m A1 = 14.5
9.9 + -1.605 = 8.3 m A2 = 14.5
9.9 + -2.399 = 7.5 m AJ1 = 14.5
9.9 + -3.178 = 6.7 m AJ2 = 14.5
9.9 + -4.003 = 5.9 m
8.5 + -0.201 = 8.3 m
8.5 + 0.315 = 8.8 m
8.5 + 0.198 = 8.7 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

8.5 + 0.160 = 8.7 m


LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

5.9 + -0.444 = 5.5 m 4.3.2.8. Perhitungan Beda Tinggi T


5.9 + -3.175 = 2.7 m Rumus :
5.9 + -6.957 = -1.0 m ΔH = TPS + 50 (Ba - Bb) Si
5.9 + -7.117 = -1.2 m P0 - AJ = 1.510
13.2 + -1.863 = 11.4 m BJ = 1.510
13.2 + -3.250 = 10.0 m D1 = 1.510
13.2 + -3.622 = 9.6 m D2 = 1.510
13.2 + -5.679 = 7.6 m D3 = 1.510
25.4 + -2.173 = 23.3 m D4 = 1.510
25.4 + -4.941 = 20.5 m P1 - AJ = 1.440
25.4 + -5.962 = 19.5 m BJ = 1.440
25.4 + -6.060 = 19.4 m D1 = 1.440
28.8 + -2.162 = 26.7 m D2 = 1.440
28.8 + -4.633 = 24.2 m D3 = 1.440
28.8 + -5.524 = 23.3 m D4 = 1.440
28.8 + -6.141 = 22.7 m P2 - AS = 1.420
32.3 + -4.077 = 28.3 m BJ = 1.420
32.3 + -4.774 = 27.6 m D1 = 1.420
32.3 + -6.428 = 25.9 m D2 = 1.420
32.3 + -7.408 = 24.9 m D3 = 1.420
35.8 + -1.781 = 34.0 m D4 = 1.420
35.8 + -3.686 = 32.1 m P3 - AS = 1.490
35.8 + -4.105 = 31.6 m BJ = 1.490
35.8 + -4.200 = 31.6 m D1 = 1.490
35.8 + -5.378 = 30.4 m D2 = 1.490
51.2 + -1.100 = 50.0 m D3 = 1.490
51.2 + -2.456 = 48.7 m D4 = 1.490
51.2 + -2.889 = 48.3 m P4 - AS = 1.480
51.2 + -3.826 = 47.3 m BJ = 1.480
44.2 + 0.343 = 44.5 m D1 = 1.480
44.2 + 0.450 = 44.6 m D2 = 1.480
44.2 + 0.507 = 44.7 m D3 = 1.480
44.2 + 0.836 = 45.0 m D4 = 1.480
14.5 + -1.972 = 12.5 m P5 - AJ = 1.480
14.5 + -3.606 = 10.9 m BJ = 1.480
14.5 + -4.082 = 10.4 m A1 = 1.480
14.5 + -5.443 = 9.1 m A2 = 1.480
14.5 + 7.716 = 22.2 m P6 - AJ = 0.410
14.5 + 8.328 = 22.8 m BJ = 0.410
A1 = 0.410
A2 = 0.410
P7 - AJ = 1.410
BJ = 1.410
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A1 = 1.410
A2 = 1.410
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

rhitungan Beda Tinggi Titik Detail P8 - AJ = 1.360


BJ = 1.360
= TPS + 50 (Ba - Bb) Sin 2ϴ - Bt -------> ϴ = 90◦ - V A1 = 1.360
1.510 + 50 (1.254 - 1.222) sin 2 -5⁰ 10' 25'' - 1.238 = 0.003 m A2 = 1.360
1.510 + 50 (1.180 - 1.128) sin 2 -5⁰ 10' 25'' - 1.154 = -0.082 m P9 - AS = 1.320
1.510 + 50 (1.234 - 1.176) sin 2 -5⁰ 10' 25'' - 1.205 = -0.183 m BJ = 1.320
1.510 + 50 (1.762 - 1.702) sin 2 -5⁰ 10' 25'' - 1.732 = -0.727 m A1 = 1.320
1.510 + 50 (1.745 - 1.683) sin 2 -5⁰ 10' 25'' - 1.714 = -0.726 m A2 = 1.320
1.510 + 50 (1.215 - 1.152) sin 2 -5⁰ 10' 25'' - 1.184 = -0.204 m P10 - AS = 1.320
1.440 + 50 (1.260 - 1.230) sin 2 -3⁰ 50' 60'' - 1.245 = 0.082 m BJ = 1.320
1.440 + 50 (1.255 - 1.209) sin 2 -3⁰ 51' 5'' - 1.232 = 0.036 m A1 = 1.320
1.440 + 50 (1.209 - 1.155) sin 2 -3⁰ 51' 5'' - 1.182 = 0.056 m A2 = 1.320
1.440 + 50 (1.754 - 1.696) sin 2 -3⁰ 51' 5'' - 1.725 = -0.502 m P11 - AS = 1.320
1.440 + 50 (1.733 - 1.674) sin 2 -3⁰ 51' 5'' - 1.704 = -0.485 m BJ = 1.320
1.440 + 50 (1.175 - 1.113) sin 2 -3⁰ 51' 5'' - 1.144 = 0.064 m A1 = 1.320
1.420 + 50 (1.312 - 1.286) sin 2 -3⁰ 26' 0'' - 1.299 = 0.005 m A2 = 1.320
1.420 + 50 (1.314 - 1.262) sin 2 -3⁰ 26' 0'' - 1.288 = -0.101 m P12 - AS = 1.375
1.420 + 50 (1.465 - 1.397) sin 2 -3⁰ 26' 0'' - 1.431 = -0.316 m BJ = 1.375
1.420 + 50 (2.018 - 1.946) sin 2 -3⁰ 26' 0'' - 1.982 = -0.884 m A1 = 1.375
1.420 + 50 (2.004 - 1.931) sin 2 -3⁰ 26' 0'' - 1.968 = -0.874 m A2 = 1.375
1.420 + 50 (1.484 - 1.410) sin 2 -3⁰ 26' 0'' - 1.447 = -0.358 m P13 - AJ = 1.450
1.490 + 50 (1.011 - 0.979) sin 2 -5⁰ 48' 25'' - 0.995 = 0.261 m BJ = 1.450
1.490 + 50 (0.522 - 0.456) sin 2 -6⁰ 17' 20'' - 0.489 = 0.344 m A1 = 1.450
1.490 + 50 (0.980 - 0.900) sin 2 -2⁰ 5' 15'' - 0.940 = 0.283 m A2 = 1.450
1.490 + 50 (1.524 - 1.443) sin 2 -2⁰ 5' 15'' - 1.484 = -0.264 m A3 = 1.450
1.490 + 50 (1.630 - 1.548) sin 2 -2⁰ 5' 15'' - 1.589 = -0.373 m P14 - AJ = 1.530
1.490 + 50 (0.977 - 0.894) sin 2 -2⁰ 5' 15'' - 0.936 = 0.278 m BJ = 1.530
1.480 + 50 (1.160 - 1.150) sin 2 -3⁰ 43' 35'' - 1.155 = 0.285 m A1 = 1.530
1.480 + 50 (1.018 - 0.962) sin 2 -3⁰ 43' 34'' - 0.990 = 0.268 m A2 = 1.530
1.480 + 50 (0.922 - 0.848) sin 2 -3⁰ 43' 35'' - 0.885 = 0.301 m P15 - AJ = 1.470
1.480 + 50 (1.421 - 1.346) sin 2 -3⁰ 43' 35'' - 1.384 = -0.201 m BJ = 1.470
1.480 + 50 (1.401 - 1.319) sin 2 -3⁰ 43' 35'' - 1.360 = -0.205 m A1 = 1.470
1.480 + 50 (0.882 - 0.799) sin 2 -3⁰ 43' 35'' - 0.841 = 0.310 m A2 = 1.470
1.480 + 50 (1.225 - 1.199) sin 2 -4⁰ 51' 45'' - 1.212 = 0.126 m P16 - AJ = 1.520
1.480 + 50 (1.180 - 1.128) sin 2 -4⁰ 51' 45'' - 1.154 = 0.041 m BJ = 1.520
1.480 + 50 (0.946 - 0.880) sin 2 -4⁰ 51' 45'' - 0.913 = 0.206 m A1 = 1.520
1.480 + 50 (0.865 - 0.787) sin 2 -4⁰ 51' 45'' - 0.826 = 0.227 m A2 = 1.520
0.410 + 50 (1.135 - 1.115) sin 2 -7⁰ 48' 20'' - 1.125 = -0.931 m AJ1 = 1.520
0.410 + 50 (0.983 - 0.953) sin 2 -7⁰ 48' 20'' - 0.968 = -0.882 m AJ2 = 1.520
0.410 + 50 (0.933 - 0.893) sin 2 -7⁰ 48' 20'' - 0.913 = -0.935 m
0.410 + 50 (0.812 - 0.762) sin 2 -7⁰ 48' 20'' - 0.787 = -0.917 m
1.410 + 50 (1.153 - 1.133) sin 2 -7⁰ 31' 30'' - 1.143 = 0.041 m
1.410 + 50 (0.797 - 0.751) sin 2 -7⁰ 31' 30'' - 0.774 = 0.117 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

1.410 + 50 (0.773 - 0.725) sin 2 -7⁰ 31' 30'' - 0.749 = 0.120 m


1.410 + 50 (0.714 - 0.665) sin 2 -7⁰ 31' 30'' - 0.690 = 0.168 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

+ 50 (0.945 - 0.921) sin 2 -11⁰ 31' 15'' - 0.933 = -0.010 m Rumus :


+ 50 (0.610 - 0.576) sin 2 -11⁰ 31' 15'' - 0.593 = 0.149 m Hn = Hutama ± ΔHn
+ 50 (1.158 - 1.084) sin 2 -5⁰ 40' 50'' - 1.121 = -0.318 m P0 - AJ = 43
+ 50 (1.280 - 1.205) sin 2 -2⁰ 23' 35'' - 1.243 = -0.093 m BJ = 43
+ 50 (0.845 - 0.825) sin 2 -14⁰ 8' 25'' - 0.835 = 0.006 m D1 = 43
+ 50 (0.822 - 0.788) sin 2 -9⁰ 34' 30'' - 0.805 = 0.017 m D2 = 43
+ 50 (0.803 - 0.765) sin 2 -9⁰ 34' 30'' - 0.784 = -0.021 m D3 = 43
+ 50 (1.225 - 1.165) sin 2 -9⁰ 34' 30'' - 1.195 = -0.754 m D4 = 43
+ 50 (1.410 - 1.388) sin 2 -5⁰ 50' 20'' - 1.399 = -0.239 m P1 - AJ = 47.353
+ 50 (1.325 - 1.275) sin 2 -6⁰ 20' 20'' - 1.300 = -0.473 m BJ = 47.353
+ 50 (1.370 - 1.310) sin 2 -5⁰ 50' 20'' - 1.340 = -0.455 m D1 = 47.353
+ 50 (1.331 - 1.270) sin 2 -5⁰ 50' 20'' - 1.301 = -0.423 m D2 = 47.353
+ 50 (1.436 - 1.412) sin 2 1⁰ 41' 30'' - 1.424 = -0.033 m D3 = 47.353
+ 50 (1.651 - 1.599) sin 2 1⁰ 41' 25'' - 1.625 = -0.152 m D4 = 47.353
+ 50 (1.790 - 1.728) sin 2 1⁰ 41' 25'' - 1.759 = -0.256 m P2 - AS = 48.085
+ 50 (1.800 - 1.730) sin 2 1⁰ 41' 30'' - 1.765 = -0.238 m BJ = 48.085
+ 50 (1.255 - 1.210) sin 2 -7⁰ 1' 5'' - 1.233 = -0.405 m D1 = 48.085
+ 50 (1.034 - 0.983) sin 2 -7⁰ 1' 55'' - 1.009 = -0.252 m D2 = 48.085
+ 50 (1.017 - 0.949) sin 2 -7⁰ 1' 50'' - 0.983 = -0.433 m D3 = 48.085
+ 50 (0.727 - 0.650) sin 2 -7⁰ 8' 0'' - 0.689 = -0.234 m D4 = 48.085
+ 50 (1.064 - 1.044) sin 2 -10⁰ 24' 0'' - 1.054 = 0.062 m P3 - AS = 48.550
+ 50 (0.882 - 0.840) sin 2 -10⁰ 24' 0'' - 0.861 = -0.111 m BJ = 48.550
+ 50 (0.864 - 0.817) sin 2 -10⁰ 24' 0'' - 0.841 = -0.174 m D1 = 48.550
+ 50 (1.177 - 1.129) sin 2 -10⁰ 24' 0'' - 1.153 = -0.503 m D2 = 48.550
+ 50 (1.185 - 1.122) sin 2 -10⁰ 24' 0'' - 1.154 = -0.754 m D3 = 48.550
+ 50 (1.325 - 1.309) sin 2 -8⁰ 46' 50'' - 1.317 = 0.012 m D4 = 48.550
+ 50 (1.207 - 1.173) sin 2 -8⁰ 46' 45'' - 1.190 = -0.087 m P4 - AS = 49.141
+ 50 (1.328 - 1.288) sin 2 -8⁰ 46' 45'' - 1.308 = -0.281 m BJ = 49.141
+ 50 (1.452 - 1.400) sin 2 -8⁰ 46' 45'' - 1.426 = -0.550 m D1 = 49.141
+ 50 (1.136 - 1.110) sin 2 -9⁰ 17' 5'' - 1.123 = -0.047 m D2 = 49.141
+ 50 (0.965 - 0.917) sin 2 -9⁰ 17' 5'' - 0.941 = -0.198 m D3 = 49.141
+ 50 (0.918 - 0.852) sin 2 -9⁰ 0' 50'' - 0.885 = -0.446 m D4 = 49.141
+ 50 (0.550 - 0.458) sin 2 -9⁰ 0' 55'' - 0.504 = -0.471 m P5 - AJ = 49.998
+ 50 (1.241 - 1.215) sin 2 -6⁰ 51' 30'' - 1.228 = 0.059 m BJ = 49.998
+ 50 (1.082 - 1.025) sin 2 -6⁰ 51' 30'' - 1.054 = -0.044 m A1 = 49.998
+ 50 (1.079 - 1.014) sin 2 -6⁰ 51' 30'' - 1.047 = -0.109 m A2 = 49.998
+ 50 (0.912 - 0.826) sin 2 -6⁰ 51' 30'' - 0.869 = -0.120 m P6 - AJ = 48.923
+ 50 (1.443 - 1.350) sin 2 -6⁰ 44' 25'' - 1.397 = -0.729 m BJ = 48.923
+ 50 (1.355 - 1.261) sin 2 -6⁰ 45' 25'' - 1.308 = -0.647 m A1 = 48.923
A2 = 48.923
P7 - AJ = 49.062
BJ = 49.062
A1 = 49.062
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A2 = 49.062
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P8 - AJ = 44.045
n = Hutama ± ΔHn BJ = 44.045
+ 0.003 = 43.0 m A1 = 44.045
+ -0.082 = 42.9 m A2 = 44.045
+ -0.183 = 42.8 m P9 - AS = 35.859
+ -0.727 = 42.3 m BJ = 35.859
+ -0.726 = 42.3 m A1 = 35.859
+ -0.204 = 42.8 m A2 = 35.859
+ 0.082 = 47.4 m P10 - AS = 34.306
+ 0.036 = 47.4 m BJ = 34.306
+ 0.056 = 47.4 m A1 = 34.306
+ -0.502 = 46.9 m A2 = 34.306
+ -0.485 = 46.9 m P11 - AS = 34.402
+ 0.064 = 47.4 m BJ = 34.402
+ 0.005 = 48.1 m A1 = 34.402
+ -0.101 = 48.0 m A2 = 34.402
+ -0.316 = 47.8 m P12 - AS = 34.521
+ -0.884 = 47.2 m BJ = 34.521
+ -0.874 = 47.2 m A1 = 34.521
+ -0.358 = 47.7 m A2 = 34.521
+ 0.261 = 48.8 m P13 - AJ = 34.682
+ 0.344 = 48.9 m BJ = 34.682
+ 0.283 = 48.8 m A1 = 34.682
+ -0.264 = 48.3 m A2 = 34.682
+ -0.373 = 48.2 m A3 = 34.682
+ 0.278 = 48.8 m P14 - AJ = 34.607
+ 0.285 = 49.4 m BJ = 34.607
+ 0.268 = 49.4 m A1 = 34.607
+ 0.301 = 49.4 m A2 = 34.607
+ -0.201 = 48.9 m P15 - AJ = 33.969
+ -0.205 = 48.9 m BJ = 33.969
+ 0.310 = 49.5 m A1 = 33.969
+ 0.126 = 50.1 m A2 = 33.969
+ 0.041 = 50.0 m P16 - AJ = 39.056
+ 0.206 = 50.2 m BJ = 39.056
+ 0.227 = 50.2 m A1 = 39.056
+ -0.931 = 48.0 m A2 = 39.056
+ -0.882 = 48.0 m AJ1 = 39.056
+ -0.935 = 48.0 m AJ2 = 39.056
+ -0.917 = 48.0 m
+ 0.041 = 49.1 m
+ 0.117 = 49.2 m
+ 0.120 = 49.2 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

+ 0.168 = 49.2 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

+ -0.010 = 44.0 m
+ 0.149 = 44.2 m
+ -0.318 = 43.7 m
+ -0.093 = 44.0 m
+ 0.006 = 35.9 m
+ 0.017 = 35.9 m
+ -0.021 = 35.8 m
+ -0.754 = 35.1 m
+ -0.239 = 34.1 m
+ -0.473 = 33.8 m
+ -0.455 = 33.9 m
+ -0.423 = 33.9 m
+ -0.033 = 34.4 m
+ -0.152 = 34.3 m
+ -0.256 = 34.1 m
+ -0.238 = 34.2 m
+ -0.405 = 34.1 m
+ -0.252 = 34.3 m
+ -0.433 = 34.1 m
+ -0.234 = 34.3 m
+ 0.062 = 34.7 m
+ -0.111 = 34.6 m
+ -0.174 = 34.5 m
+ -0.503 = 34.2 m
+ -0.754 = 33.9 m
+ 0.012 = 34.6 m
+ -0.087 = 34.5 m
+ -0.281 = 34.3 m
+ -0.550 = 34.1 m
+ -0.047 = 33.9 m
+ -0.198 = 33.8 m
+ -0.446 = 33.5 m
+ -0.471 = 33.5 m
+ 0.059 = 39.1 m
+ -0.044 = 39.0 m
+ -0.109 = 38.9 m
+ -0.120 = 38.9 m
+ -0.729 = 38.3 m
+ -0.647 = 38.4 m
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3.2. Perhitungan Detail Theodolite

4.3.2.1. Perhitungan Beda Sudut Detail


P0 - AJ = 48⁰ 57' 25'' - 0⁰ 0' 0'' = 48⁰ 57' 25''
BJ = 48⁰ 25' 10'' - 0⁰ 0' 0'' = 48⁰ 25' 10''
D1 = 48⁰ 44' 25'' - 0⁰ 0' 0'' = 48⁰ 44' 25''
D2 = 50⁰ 1' 0'' - 0⁰ 0' 0'' = 50⁰ 1' 0''
D3 = 50⁰ 3' 25'' - 0⁰ 0' 0'' = 50⁰ 3' 25''
D4 = 50⁰ 26' 15'' - 0⁰ 0' 0'' = 50⁰ 26' 15''
P1 - AJ = 268⁰ 56' 10'' - 0⁰ 0' 0'' = 268⁰ 56' 10''
BJ = 270⁰ 27' 15'' - 0⁰ 0' 0'' = 270⁰ 27' 15''
D1 = 270⁰ 32' 45'' - 0⁰ 0' 0'' = 270⁰ 32' 45''
D2 = 270⁰ 32' 45'' - 0⁰ 0' 0'' = 270⁰ 32' 45''
D3 = 270⁰ 26' 25'' - 0⁰ 0' 0'' = 270⁰ 26' 25''
D4 = 270⁰ 30' 10'' - 0⁰ 0' 0'' = 270⁰ 30' 10''
P2 - AS = 266⁰ 23' 40'' - 0⁰ 0' 0'' = 266⁰ 23' 40''
BJ = 267⁰ 44' 45'' - 0⁰ 0' 0'' = 267⁰ 44' 45''
D1 = 269⁰ 17' 15'' - 0⁰ 0' 0'' = 269⁰ 17' 15''
D2 = 269⁰ 36' 25'' - 0⁰ 0' 0'' = 269⁰ 36' 25''
D3 = 269⁰ 22' 55'' - 0⁰ 0' 0'' = 269⁰ 22' 55''
D4 = 269⁰ 22' 55'' - 0⁰ 0' 0'' = 269⁰ 22' 55''
P3 - AS = 254⁰ 16' 15'' - 0⁰ 0' 0'' = 254⁰ 16' 15''
BJ = 254⁰ 43' 45'' - 0⁰ 0' 0'' = 254⁰ 43' 45''
D1 = 253⁰ 42' 45'' - 0⁰ 0' 0'' = 253⁰ 42' 45''
D2 = 253⁰ 7' 5'' - 0⁰ 0' 0'' = 253⁰ 7' 5''
D3 = 252⁰ 46' 0'' - 0⁰ 0' 0'' = 252⁰ 46' 0''
D4 = 252⁰ 44' 15'' - 0⁰ 0' 0'' = 252⁰ 44' 15''
P4 - AS 259⁰ 7' 15'' - 0⁰ 0' 0'' = 259⁰ 7' 15''
BJ 261⁰ 14' 40'' - 0⁰ 0' 0'' = 261⁰ 14' 40''
D1 = 267⁰ 3⁰ 30⁰ - 0⁰ 0' 0'' = 267⁰ 3' 30''
D2 = 263⁰ 5⁰ 20⁰ - 0⁰ 0' 0'' = 263⁰ 5' 20''
D3 = 262⁰ 54⁰ 25⁰ - 0⁰ 0' 0'' = 262⁰ 54' 25''
D4 = 262⁰ 54⁰ 25⁰ - 0⁰ 0' 0'' = 262⁰ 54' 25''
P5 - AJ = 264⁰ 2⁰ 25⁰ - 0⁰ 0' 0'' = 264⁰ 2' 25''
BJ = 262⁰ 9⁰ 0⁰ - 0⁰ 0' 0'' = 262⁰ 9' 0''
A1 = 261⁰ 44⁰ 55⁰ - 0⁰ 0' 0'' = 261⁰ 44' 55''
A2 = 262⁰ 31⁰ 55⁰ - 0⁰ 0' 0'' = 262⁰ 31' 55''
P6 - AJ = 252⁰ 39⁰ 5⁰ - 0⁰ 0' 0'' = 252⁰ 39' 5''
BJ = 252⁰ 56⁰ 45⁰ - 0⁰ 0' 0'' = 252⁰ 56' 45''
A1 = 253⁰ 26⁰ 10⁰ - 0⁰ 0' 0'' = 253⁰ 26' 10''
A2 = 252⁰ 50⁰ 45⁰ - 0⁰ 0' 0'' = 252⁰ 50' 45''

88
P7 - AJ = 276⁰ 7⁰ 45⁰ - 0⁰ 0' 0'' = 276⁰ 7' 45''

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

BJ = 285⁰ 56⁰ 50⁰ - 0⁰ 0' 0'' = 285⁰ 56' 50''


A1 = 284⁰ 22⁰ 5⁰ - 0⁰ 0' 0'' = 284⁰ 22' 5''
A2 = 283⁰ 52⁰ 20⁰ - 0⁰ 0' 0'' = 283⁰ 52' 20''
P8 - AJ = 279⁰ 26⁰ 19⁰ - 0⁰ 0' 0'' = 279⁰ 26' 19''
BJ = 275⁰ 26⁰ 15⁰ - 0⁰ 0' 0'' = 275⁰ 26' 15''
A1 = 271⁰ 27⁰ 30⁰ - 0⁰ 0' 0'' = 271⁰ 27' 30''
A2 = 272⁰ 12⁰ 30⁰ - 0⁰ 0' 0'' = 272⁰ 12' 30''
P9 AS = 273⁰ 54⁰ 55⁰ - 0⁰ 0' 0'' = 273⁰ 54' 55''
BJ = 270⁰ 15⁰ 25⁰ - 0⁰ 0' 0'' = 270⁰ 15' 25''
A1 = 269⁰ 32⁰ 35⁰ - 0⁰ 0' 0'' = 269⁰ 32' 35''
A2 = 267⁰ 55⁰ 10⁰ - 0⁰ 0' 0'' = 267⁰ 55' 10''
P10 AS = 269⁰ 10⁰ 55⁰ - 0⁰ 0' 0'' = 269⁰ 10' 55''
BJ = 272⁰ 25⁰ 30⁰ - 0⁰ 0' 0'' = 272⁰ 25' 30''
A1 = 273⁰ 25⁰ 40⁰ - 0⁰ 0' 0'' = 273⁰ 25' 40''
A2 = 273⁰ 4⁰ 15⁰ - 0⁰ 0' 0'' = 273⁰ 4' 15''
P11 AS = 268⁰ 25⁰ 20⁰ - 0⁰ 0' 0'' = 268⁰ 25' 20''
BJ = 267⁰ 8⁰ 40⁰ - 0⁰ 0' 0'' = 267⁰ 8' 40''
A1 = 267⁰ 8⁰ 40⁰ - 0⁰ 0' 0'' = 267⁰ 8' 40''
A2 = 265⁰ 27⁰ 15⁰ - 0⁰ 0' 0'' = 265⁰ 27' 15''
P12 AS = 260⁰ 42⁰ 10⁰ - 0⁰ 0' 0'' = 260⁰ 42' 10''
BJ = 265⁰ 38⁰ 55⁰ - 0⁰ 0' 0'' = 265⁰ 38' 55''
A1 = 267⁰ 26⁰ 0⁰ - 0⁰ 0' 0'' = 267⁰ 26' 0''
A2 = 271⁰ 15⁰ 40⁰ - 0⁰ 0' 0'' = 271⁰ 15' 40''
P13 AJ = 260⁰ 49⁰ 20⁰ - 0⁰ 0' 0'' = 260⁰ 49' 20''
BJ = 259⁰ 1⁰ 20⁰ - 0⁰ 0' 0'' = 259⁰ 1' 20''
A1 = 258⁰ 26⁰ 55⁰ - 0⁰ 0' 0'' = 258⁰ 26' 55''
A2 = 258⁰ 40⁰ 35⁰ - 0⁰ 0' 0'' = 258⁰ 40' 35''
A3 = 255⁰ 55⁰ 50⁰ - 0⁰ 0' 0'' = 255⁰ 55' 50''
P14 AJ = 248⁰ 55⁰ 25⁰ - 0⁰ 0' 0'' = 248⁰ 55' 25''
BJ = 251⁰ 48⁰ 15⁰ - 0⁰ 0' 0'' = 251⁰ 48' 15''
A1 = 251⁰ 48⁰ 15⁰ - 0⁰ 0' 0'' = 251⁰ 48' 15''
A2 = 252⁰ 58⁰ 30⁰ - 0⁰ 0' 0'' = 252⁰ 58' 30''
P15 AJ = 206⁰ 30⁰ 55⁰ - 0⁰ 0' 0'' = 206⁰ 30' 55''
BJ = 208⁰ 46⁰ 50⁰ - 0⁰ 0' 0'' = 208⁰ 46' 50''
A1 = 209⁰ 46⁰ 20⁰ - 0⁰ 0' 0'' = 209⁰ 46' 20''
A2 = 208⁰ 56⁰ 20⁰ - 0⁰ 0' 0'' = 208⁰ 56' 20''
P16 AJ = 298⁰ 24⁰ 20⁰ - 0⁰ 0' 0'' = 298⁰ 24' 20''
BJ = 288⁰ 9⁰ 30⁰ - 0⁰ 0' 0'' = 288⁰ 9' 30''
A1 = 287⁰ 49⁰ 5⁰ - 0⁰ 0' 0'' = 287⁰ 49' 5''
A2 = 288⁰ 10⁰ 45⁰ - 0⁰ 0' 0'' = 288⁰ 10' 45''
AJ1 = 191⁰ 44⁰ 20⁰ - 0⁰ 0' 0'' = 191⁰ 44' 20''

88
AJ2 = 185⁰ 14⁰ 15⁰ - 0⁰ 0' 0'' = 185⁰ 14' 15''

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P6
4.3.2.2. Perhitungan Azimuth Detail (α)

Rumus :
αn = αn-1 + ( βn-180⁰) P7

P0 - AJ = 320⁰ 35' 25'' + ( 48⁰ 57' 25'' - 180⁰ ) = 189⁰ 32' 50''
BJ = 320⁰ 35' 25'' + ( 48⁰ 25' 10'' - 180⁰ ) = 189⁰ 0' 35''
D1 = 320⁰ 35' 25'' + ( 48⁰ 44' 25'' - 180⁰ ) = 189⁰ 19' 50'' P8
D2 = 320⁰ 35' 25'' + ( 50⁰ 1' 0'' - 180⁰ ) = 190⁰ 36' 25''
D3 = 320⁰ 35' 25'' + ( 50⁰ 3' 25'' - 180⁰ ) = 190⁰ 38' 50''
D4 = 320⁰ 35' 25'' + ( 50⁰ 26' 15'' - 180⁰ ) = 191⁰ 1' 40''
P1 - AJ = 177⁰ 28' 30'' + ( 268⁰ 56' 10'' - 180⁰ ) = 266⁰ 24' 40'' P9
BJ = 177⁰ 28' 30'' + ( 270⁰ 56' 10'' - 180⁰ ) = 268⁰ 24' 40''
D1 = 177⁰ 28' 30'' + ( 270⁰ 27' 15'' - 180⁰ ) = 267⁰ 55' 45''
D2 = 177⁰ 28' 30'' + ( 270⁰ 32' 45'' - 180⁰ ) = 268⁰ 1' 15''
D3 = 177⁰ 28' 30'' + ( 270⁰ 32' 45'' - 180⁰ ) = 268⁰ 1' 15'' P10
D4 = 177⁰ 28' 30'' + ( 270⁰ 26' 25'' - 180⁰ ) = 267⁰ 54' 55''
P2 - AJ = 141⁰ 0⁰ 45⁰ + ( 266⁰ 30' 10'' - 180⁰ ) = 227⁰ 30' 55''
BJ = 141⁰ 0' 45'' + ( 267⁰ 23' 40'' - 180⁰ ) = 228⁰ 24' 25''
D1 = 141⁰ 0' 45'' + ( 269⁰ 44' 45'' - 180⁰ ) = 230⁰ 45' 30'' P11
D2 = 141⁰ 0' 45'' + ( 269⁰ 23' 40'' - 180⁰ ) = 230⁰ 24' 25''
D3 = 141⁰ 0' 45'' + ( 269⁰ 44' 45'' - 180⁰ ) = 230⁰ 45' 30''
D4 = 141⁰ 0' 45'' + ( 269⁰ 17' 15'' - 180⁰ ) = 230⁰ 18' 0''
P3 - AJ = 155⁰ 59⁰ 25⁰ + ( 254⁰ 36' 25'' - 180⁰ ) = 230⁰ 35' 50'' P12
BJ = 155⁰ 59' 25'' + ( 254⁰ 22' 55'' - 180⁰ ) = 230⁰ 22' 20''
D1 = 155⁰ 59' 25'' + ( 253⁰ 22' 55'' - 180⁰ ) = 229⁰ 22' 20''
D2 = 155⁰ 59' 25'' + ( 253⁰ 16' 15'' - 180⁰ ) = 229⁰ 15' 40''
D3 = 155⁰ 59' 25'' + ( 252⁰ 43' 45'' - 180⁰ ) = 228⁰ 43' 10'' P13
D4 = 155⁰ 59' 25'' + ( 252⁰ 42' 45'' - 180⁰ ) = 228⁰ 42' 10''
P4 - AJ = 158⁰ 45⁰ 55⁰ + ( 259⁰ 7' 5'' - 180⁰ ) = 237⁰ 52' 60''
BJ = 158⁰ 45' 55'' + ( 261⁰ 46' 0'' - 180⁰ ) = 240⁰ 31' 55''
D1 = 158⁰ 45' 55'' + ( 267⁰ 44' 15'' - 180⁰ ) = 246⁰ 30' 10''
D2 = 158⁰ 45' 55'' + ( 263⁰ 7' 15'' - 180⁰ ) = 241⁰ 53' 10'' P14
D3 = 158⁰ 45' 55'' + ( 262⁰ 14' 40'' - 180⁰ ) = 241⁰ 0' 35''
D4 = 158⁰ 45' 55'' + ( 262⁰ 3' 30'' - 180⁰ ) = 240⁰ 49' 25''
P5 - AJ = 171⁰ 65⁰ 10⁰ + ( 264⁰ 5' 20'' - 180⁰ ) = 256⁰ 10' 30''
BJ = 171⁰ 65' 10'' + ( 262⁰ 54' 25'' - 180⁰ ) = 254⁰ 59' 35'' P15
A1 = 171⁰ 65' 10'' + ( 261⁰ 54' 25'' - 180⁰ ) = 253⁰ 59' 35''
A2 = 171⁰ 65' 10'' + ( 262⁰ 2' 25'' - 180⁰ ) = 254⁰ 7' 35''

88
P16
D5

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P6 - AJ = 143⁰ 3' 40'' + ( 252⁰ 39' 5'' - 180⁰ ) = 215⁰ 42' 45''
BJ = 143⁰ 3' 40'' + ( 252⁰ 56' 45'' - 181⁰ ) = 215⁰ 0' 25''
A1 = 143⁰ 3' 40'' + ( 253⁰ 26' 10'' - 182⁰ ) = 214⁰ 29' 50''
A2 = 143⁰ 3' 40'' + ( 252⁰ 50' 45'' - 183⁰ ) = 212⁰ 54' 25''
P7 - AJ = 171⁰ 65⁰ 10⁰ + ( 276⁰ 7' 45'' - 180⁰ ) = 268⁰ 12' 55''
BJ = 171⁰ 65' 10'' + ( 285⁰ 56' 50'' - 185⁰ ) = 273⁰ 2' 0'' P0
A1 = 171⁰ 65' 10'' + ( 284⁰ 22' 5'' - 186⁰ ) = 270⁰ 27' 15''
A2 = 171⁰ 65' 10'' + ( 283⁰ 52' 20'' - 187⁰ ) = 268⁰ 57' 30''
P8 - AJ = 159⁰ 32⁰ 35⁰ + ( 279⁰ 26' 19'' - 180⁰ ) = 258⁰ 58' 54''
BJ = 159⁰ 32⁰ 35⁰ + ( 275⁰ 26' 15'' - 181⁰ ) = 253⁰ 58' 50''
A1 = 159⁰ 32⁰ 35⁰ + ( 271⁰ 27' 30'' - 182⁰ ) = 249⁰ 0' 5''
A2 = 159⁰ 32⁰ 35⁰ + ( 272⁰ 12' 30'' - 183⁰ ) = 248⁰ 45' 5'' P1
P9 - AJ = 167⁰ 21⁰ 55⁰ + ( 273⁰ 54' 55'' - 0⁰ ) = 441⁰ 16' 50''
BJ = 167⁰ 21' 55'' + ( 270⁰ 15' 25'' - 0⁰ ) = 437⁰ 37' 20''
A1 = 167⁰ 21' 55'' + ( 269⁰ 32' 35'' - 0⁰ ) = 436⁰ 54' 30''
A2 = 167⁰ 21' 55'' + ( 267⁰ 55' 10'' - 0⁰ ) = 435⁰ 17' 5''
P10 - AS = 173⁰ 57⁰ 5⁰ + ( 269⁰ 10' 55'' - 0⁰ ) = 443⁰ 7' 60''
BJ = 173⁰ 57' 5'' + ( 272⁰ 25' 30'' - 0⁰ ) = 446⁰ 22' 35'' P2
A1 = 173⁰ 57' 5'' + ( 273⁰ 25' 40'' - 0⁰ ) = 447⁰ 22' 45''
A2 = 173⁰ 57' 5'' + ( 273⁰ 4' 15'' - 0⁰ ) = 447⁰ 1' 20''
P11 - AS = 155⁰ 57⁰ 20⁰ + ( 268⁰ 25' 20'' - 0⁰ ) = 424⁰ 22' 40''
BJ = 155⁰ 57' 20'' + ( 267⁰ 8' 40'' - 0⁰ ) = 423⁰ 6' 0''
A1 = 155⁰ 57' 20'' + ( 267⁰ 8' 40'' - 0⁰ ) = 423⁰ 6' 0''
A2 = 155⁰ 57' 20'' + ( 265⁰ 27' 15'' - 0⁰ ) = 421⁰ 24' 35'' P3
P12 - AS = 166⁰ 10⁰ 45⁰ + ( 260⁰ 42' 10'' - 0⁰ ) = 426⁰ 52' 55''
BJ = 166⁰ 10' 45'' + ( 265⁰ 38' 55'' - 0⁰ ) = 431⁰ 49' 40''
A1 = 166⁰ 10' 45'' + ( 267⁰ 26' 0'' - 0⁰ ) = 433⁰ 36' 45''
A2 = 166⁰ 10' 45'' + ( 271⁰ 15' 40'' - 0⁰ ) = 437⁰ 26' 25''
P13 - AJ = 165⁰ 29⁰ 20⁰ + ( 260⁰ 49' 20'' - 0⁰ ) = 426⁰ 18' 40''
BJ = 165⁰ 29' 20'' + ( 259⁰ 1' 20'' - 0⁰ ) = 424⁰ 30' 40'' P4
A1 = 165⁰ 29' 20'' + ( 258⁰ 26' 55'' - 0⁰ ) = 423⁰ 56' 15''
A2 = 165⁰ 29' 20'' + ( 258⁰ 40' 35'' - 0⁰ ) = 424⁰ 9' 55''
A3 = 165⁰ 29' 20'' + ( 255⁰ 55' 50'' - 0⁰ ) = 421⁰ 25' 10''
P14 - AJ = 155⁰ 24⁰ 40⁰ + ( 248⁰ 55' 25'' - 0⁰ ) = 404⁰ 20' 5''
BJ = 155⁰ 24' 40'' + ( 251⁰ 48' 15'' - 0⁰ ) = 407⁰ 12' 55''
A1 = 155⁰ 24' 40'' + ( 251⁰ 48' 15'' - 0⁰ ) = 407⁰ 12' 55'' P5
A2 = 155⁰ 24' 40'' + ( 252⁰ 58' 30'' - 0⁰ ) = 408⁰ 23' 10''
P15 - AJ = 145⁰ 42⁰ 55⁰ + ( 206⁰ 30' 55'' - 0⁰ ) = 352⁰ 13' 50''
BJ = 145⁰ 42' 55'' + ( 208⁰ 46' 50'' - 0⁰ ) = 354⁰ 29' 45''
A1 = 145⁰ 42' 55'' + ( 209⁰ 46' 20'' - 0⁰ ) = 355⁰ 29' 15'' P6
A2 = 145⁰ 42' 55'' + ( 208⁰ 56' 20'' - 0⁰ ) = 354⁰ 39' 15''

88
P16 - AJ = 206⁰ 30⁰ 55⁰ + ( 298⁰ 24' 20'' - 0⁰ ) = 504⁰ 55' 15''
BJ = 206⁰ 30' 55'' + ( 288⁰ 9' 30'' - 0⁰ ) = 494⁰ 40' 25''

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate J

P7
Rumus :
m = 90◦ - V

P0 - AJ = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25'' P8


BJ = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25''
D1 = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25''
D2 = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25''
D3 = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25'' P9
D4 = 90⁰ - 94⁰ 49' 35'' = -5⁰ 10' 25''
P1 - AJ = 90⁰ - 92⁰ 9⁰ 0⁰ = -3⁰ 50' 60''
BJ = 90⁰ - 92⁰ 8⁰ 55⁰ = -3⁰ 51' 5''
D1 = 90⁰ - 92⁰ 8⁰ 55⁰ = -3⁰ 51' 5'' P10
D2 = 90⁰ - 92⁰ 8⁰ 55⁰ = -3⁰ 51' 5''
D3 = 90⁰ - 92⁰ 8⁰ 55⁰ = -3⁰ 51' 5''
D4 = 90⁰ - 92⁰ 8⁰ 55⁰ = -3⁰ 51' 5''
P2 - AJ = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0'' P11
BJ = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0''
D1 = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0''
D2 = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0''
D3 = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0'' P12
D4 = 90⁰ - 92⁰ 34' 0'' = -3⁰ 26' 0''
P3 - AJ = 90⁰ - 94⁰ 11' 35'' = -5⁰ 48' 25''
BJ = 90⁰ - 95⁰ 42' 40'' = -6⁰ 17' 20''
D1 = 90⁰ - 91⁰ 54' 45'' = -2⁰ 5' 15'' P13
D2 = 90⁰ - 91⁰ 54' 45'' = -2⁰ 5' 15''
D3 = 90⁰ - 91⁰ 54' 45'' = -2⁰ 5' 15''
D4 = 90⁰ - 91⁰ 54' 45'' = -2⁰ 5' 15''
P4 - AJ = 90⁰ - 92⁰ 16' 25'' = -3⁰ 43' 35''
BJ = 90⁰ - 92⁰ 16' 26'' = -3⁰ 43' 34'' P14
D1 = 90⁰ - 92⁰ 16' 25'' = -3⁰ 43' 35''
D2 = 90⁰ - 92⁰ 16' 25'' = -3⁰ 43' 35''
D3 = 90⁰ - 92⁰ 16' 25'' = -3⁰ 43' 35''
D4 = 90⁰ - 92⁰ 16' 25'' = -3⁰ 43' 35'' P15
P5 - AJ = 90⁰ - 93⁰ 8' 15'' = -4⁰ 51' 45''
BJ = 90⁰ - 93⁰ 8' 15'' = -4⁰ 51' 45''
A1 = 90⁰ - 93⁰ 8' 15'' = -4⁰ 51' 45''
A2 = 90⁰ - 93⁰ 8' 15'' = -4⁰ 51' 45'' P16
P6 - AJ = 90⁰ - 96⁰ 11' 40'' = -7⁰ 48' 20''
BJ = 90⁰ - 96⁰ 11' 40'' = -7⁰ 48' 20''

88
A1 = 90⁰ - 96⁰ 11' 40'' = -7⁰ 48' 20''

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate J

A2 = 90⁰ - 96⁰ 11⁰ 40⁰ = -7⁰ 48' 20''


P7 - AJ = 90⁰ - 96⁰ 28⁰ 30⁰ = -7⁰ 31' 30''
BJ = 90⁰ - 96⁰ 28⁰ 30⁰ = -7⁰ 31' 30''
A1 = 90⁰ - 96⁰ 28⁰ 30⁰ = -7⁰ 31' 30'' 4.3.2.4. Perhitungan
A2 = 90⁰ - 96⁰ 28⁰ 30⁰ = -7⁰ 31' 30'' Rumus :
P8 - AJ = 90⁰ - 100⁰ 28⁰ 45⁰ = -11⁰ 31' 15''
BJ = 90⁰ - 100⁰ 28⁰ 45⁰ = -11⁰ 31' 15''
A1 = 90⁰ - 94⁰ 19⁰ 10⁰ = -5⁰ 40' 50'' P0
A2 = 90⁰ - 91⁰ 36⁰ 25⁰ = -2⁰ 23' 35''
P9 - AS = 90⁰ - 103⁰ 51⁰ 35⁰ = -14⁰ 8' 25''
BJ = 90⁰ - 98⁰ 25⁰ 30⁰ = -9⁰ 34' 30''
A1 = 90⁰ - 98⁰ 25⁰ 30⁰ = -9⁰ 34' 30''
A2 = 90⁰ - 98⁰ 25⁰ 30⁰ = -9⁰ 34' 30''
P10 - AS = 90⁰ - 94⁰ 9⁰ 40⁰ = -5⁰ 50' 20'' P1
BJ = 90⁰ - 94⁰ 99⁰ 40⁰ = -6⁰ 20' 20''
A1 = 90⁰ - 94⁰ 9⁰ 40⁰ = -5⁰ 50' 20''
A2 = 90⁰ - 94⁰ 9⁰ 40⁰ = -5⁰ 50' 20''
P11 - AS = 90⁰ - 88⁰ 18⁰ 30⁰ = 1⁰ 41' 30''
BJ = 90⁰ - 88⁰ 18⁰ 35⁰ = 1⁰ 41' 25''
A1 = 90⁰ - 88⁰ 18⁰ 35⁰ = 1⁰ 41' 25'' P2
A2 = 90⁰ - 88⁰ 18⁰ 30⁰ = 1⁰ 41' 30''
P12 - AS = 90⁰ - 96⁰ 58⁰ 55⁰ = -7⁰ 1' 5''
BJ = 90⁰ - 96⁰ 58⁰ 5⁰ = -7⁰ 1' 55''
A1 = 90⁰ - 96⁰ 58⁰ 10⁰ = -7⁰ 1' 50''
A2 = 90⁰ - 96⁰ 52⁰ 0⁰ = -7⁰ 8' 0''
P13 - AJ = 90⁰ - 99⁰ 36⁰ 0⁰ = -10⁰ 24' 0'' P3
BJ = 90⁰ - 99⁰ 36⁰ 0⁰ = -10⁰ 24' 0''
A1 = 90⁰ - 99⁰ 36⁰ 0⁰ = -10⁰ 24' 0''
A2 = 90⁰ - 99⁰ 36⁰ 0⁰ = -10⁰ 24' 0''
A3 = 90⁰ - 99⁰ 36⁰ 0⁰ = -10⁰ 24' 0''
P14 - AJ = 90⁰ - 97⁰ 13⁰ 10⁰ = -8⁰ 46' 50''
BJ = 90⁰ - 97⁰ 13⁰ 15⁰ = -8⁰ 46' 45'' P4
A1 = 90⁰ - 97⁰ 13⁰ 15⁰ = -8⁰ 46' 45''
A2 = 90⁰ - 97⁰ 13⁰ 15⁰ = -8⁰ 46' 45''
P15 - AJ = 90⁰ - 98⁰ 42⁰ 55⁰ = -9⁰ 17' 5''
BJ = 90⁰ - 98⁰ 42⁰ 55⁰ = -9⁰ 17' 5''
A1 = 90⁰ - 98⁰ 59⁰ 10⁰ = -9⁰ 0' 50''
A2 = 90⁰ - 98⁰ 59⁰ 5⁰ = -9⁰ 0' 55'' P5
P16 - AJ = 90⁰ - 95⁰ 8⁰ 30⁰ = -6⁰ 51' 30''
BJ = 90⁰ - 95⁰ 8⁰ 30⁰ = -6⁰ 51' 30''
A1 = 90⁰ - 95⁰ 8⁰ 30⁰ = -6⁰ 51' 30''

88
P6

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

A2 = 90⁰ - 95⁰ 8⁰ 30⁰ = -6⁰ 51' 30''


AJ1 = 90⁰ - 95⁰ 15⁰ 35⁰ = -6⁰ 44' 25''
AJ2 = 90⁰ - 95⁰ 14⁰ 35⁰ = -6⁰ 45' 25''
4.3.2.4. Perhitungan Jarak Optis Patok Detail
Rumus :
Dopt = (Ba - Bb) x 100

P0 - AJ = ( 1.254 - 1.222 ) x 100 = 3.2 m


BJ = ( 1.180 - 1.128 ) x 100 = 5.2 m
D1 = ( 1.234 - 1.176 ) x 100 = 5.8 m
D2 = ( 1.762 - 1.702 ) x 100 = 6.0 m
D3 = ( 1.745 - 1.683 ) x 100 = 6.2 m
D4 = ( 1.215 - 1.152 ) x 100 = 6.3 m
P1 - AJ = ( 1.260 - 1.230 ) x 100 = 3.0 m
BJ = ( 1.255 - 1.209 ) x 100 = 4.6 m
D1 = ( 1.209 - 1.155 ) x 100 = 5.4 m
D2 = ( 1.754 - 1.696 ) x 100 = 5.8 m
D3 = ( 1.733 - 1.674 ) x 100 = 5.9 m
D4 = ( 1.175 - 1.113 ) x 100 = 6.2 m
P2 - AS = ( 1.312 - 1.286 ) x 100 = 2.6 m
BJ = ( 1.314 - 1.262 ) x 100 = 5.2 m
D1 = ( 1.465 - 1.397 ) x 100 = 6.8 m
D2 = ( 2.018 - 1.946 ) x 100 = 7.2 m
D3 = ( 2.004 - 1.931 ) x 100 = 7.3 m
D4 = ( 1.484 - 1.410 ) x 100 = 7.4 m
P3 - AS = ( 1.011 - 0.979 ) x 100 = 3.2 m
BJ = ( 0.522 - 0.456 ) x 100 = 6.6 m
D1 = ( 0.980 - 0.900 ) x 100 = 8.0 m
D2 = ( 1.524 - 1.443 ) x 100 = 8.1 m
D3 = ( 1.630 - 1.548 ) x 100 = 8.2 m
D4 = ( 0.977 - 0.894 ) x 100 = 8.3 m
P4 - AS = ( 1.160 - 1.150 ) x 100 = 1.0 m
BJ = ( 1.018 - 0.962 ) x 100 = 5.6 m
D1 = ( 0.922 - 0.848 ) x 100 = 7.4 m
D2 = ( 1.421 - 1.346 ) x 100 = 7.5 m
D3 = ( 1.401 - 1.319 ) x 100 = 8.2 m
D4 = ( 0.882 - 0.799 ) x 100 = 8.3 m
P5 AJ = ( 1.225 - 1.199 ) x 100 = 2.6 m
BJ = ( 1.180 - 1.128 ) x 100 = 5.2 m
A1 = ( 0.946 - 0.880 ) x 100 = 6.6 m
A2 = ( 0.865 - 0.787 ) x 100 = 7.8 m

88
P6 AJ = ( 1.135 - 1.115 ) x 100 = 2.0 m
BJ = ( 0.983 - 0.953 ) x 100 = 3.0 m

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

6
100 12

3.2 p0 6.3 p4 8.3 p8 7.5 p12 7.7 p16 9.4


5.2 p1 6.2 p5 7.8 p9 6.0 p13 6.3
5.8 p2 7.4 p6 5.0 p10 6.1 p14 5.2
6.3
6.0 p3 8.3 p7 4.9 p11 7.0 p15 9.2
6.2
6.3
3.0 69
4.6
5.4
6.2
5.8
5.9
6.2
2.6
5.2
6.8
7.4
7.2
7.3
7.4
3.2
6.6
8.0
8.3
8.1
8.2
8.3
1.0
5.6
7.4
8.3
7.5
8.2
8.3
2.6
5.2
7.8
6.6
7.8

88
2.0
3.0
5.0

88
ate

33.8

81.2
62.3
59.7
65.4

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

4.3.2.5. Perhitungan Jarak Datar Patok Detail


Rumus :
D = Doptis . Cos2 . m

P0 - AJ = 3.2 . Cos2 -5⁰ 10' 25'' = 3.177 m


BJ = 5.2 . Cos3 -5⁰ 10' 25'' = 5.163 m
D1 = 5.8 . Cos4 -5⁰ 10' 25'' = 5.759 m
D2 = 6.0 . Cos5 -5⁰ 10' 25'' = 5.958 m
D3 = 6.2 . Cos6 -5⁰ 10' 25'' = 6.156 m
D4 = 6.3 . Cos7 -5⁰ 10' 25'' = 6.255 m
P1 - AJ = 3.0 . Cos8 -3⁰ 50' 60'' = 2.996 m
BJ = 4.6 . Cos9 -3⁰ 51' 5'' = 4.594 m
D1 = 5.4 . Cos10 -3⁰ 51' 5'' = 5.392 m
D2 = 5.8 . Cos11 -3⁰ 51' 5'' = 5.792 m
D3 = 5.9 . Cos12 -3⁰ 51' 5'' = 5.892 m
D4 = 6.2 . Cos13 -3⁰ 51' 5'' = 6.191 m
P2 - AS = 2.6 . Cos14 -3⁰ 26' 0'' = 2.595 m
BJ = 5.2 . Cos15 -3⁰ 26' 0'' = 5.190 m
D1 = 6.8 . Cos16 -3⁰ 26' 0'' = 6.786 m
D2 = 7.2 . Cos17 -3⁰ 26' 0'' = 7.186 m
D3 = 7.3 . Cos18 -3⁰ 26' 0'' = 7.285 m
D4 = 7.4 . Cos19 -3⁰ 26' 0'' = 7.385 m
P3 - AS = 3.2 . Cos20 -5⁰ 48' 25'' = 3.183 m
BJ = 6.6 . Cos21 -6⁰ 17' 20'' = 6.535 m
D1 = 8.0 . Cos22 -2⁰ 5' 15'' = 7.991 m
D2 = 8.1 . Cos23 -2⁰ 5' 15'' = 8.091 m
D3 = 8.2 . Cos24 -2⁰ 5' 15'' = 8.191 m
D4 = 8.3 . Cos25 -2⁰ 5' 15'' = 8.291 m
P4 - AS = 1.0 . Cos26 -3⁰ 43' 35'' = 0.998 m
BJ = 5.6 . Cos27 -3⁰ 43' 34'' = 5.591 m
D1 = 7.4 . Cos28 -3⁰ 43' 35'' = 7.388 m
D2 = 7.5 . Cos29 -3⁰ 43' 35'' = 7.488 m
D3 = 8.2 . Cos30 -3⁰ 43' 35'' = 8.187 m
D4 = 8.3 . Cos31 -3⁰ 43' 35'' = 8.287 m

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P5 AJ = 2.6 . Cos32 -4⁰ 51' 45'' = 2.592 m


BJ = 5.2 . Cos33 -4⁰ 51' 45'' = 5.184 m
A1 = 6.6 . Cos34 -4⁰ 51' 45'' = 6.580 m
A2 = 7.8 . Cos35 -4⁰ 51' 45'' = 7.777 m
P6 AJ = 2.0 . Cos36 -7⁰ 48' 20'' = 1.977 m
BJ = 3.0 . Cos37 -7⁰ 48' 20'' = 2.965 m
A1 = 4.0 . Cos38 -7⁰ 48' 20'' = 3.953 m
A2 = 5.0 . Cos39 -7⁰ 48' 20'' = 4.942 m
P7 AJ = 2.0 . Cos40 -7⁰ 31' 30'' = 1.975 m
BJ = 4.6 . Cos41 -7⁰ 31' 30'' = 4.542 m
A1 = 4.8 . Cos42 -7⁰ 31' 30'' = 4.739 m
A2 = 4.9 . Cos43 -7⁰ 31' 30'' = 4.838 m
P8 AJ = 2.4 . Cos44 -11⁰ 31' 15'' = 2.321 m
BJ = 3.4 . Cos45 -11⁰ 31' 15'' = 3.288 m
A1 = 7.4 . Cos46 -5⁰ 40' 50'' = 7.358 m
A2 = 7.5 . Cos47 -2⁰ 23' 35'' = 7.494 m
P9 AS = 2.0 . Cos48 -14⁰ 8' 25'' = 1.885 m
BJ = 3.4 . Cos49 -9⁰ 34' 30'' = 3.327 m
A1 = 3.8 . Cos50 -9⁰ 34' 30'' = 3.718 m
A2 = 6.0 . Cos51 -9⁰ 34' 30'' = 5.871 m
P10 AS = 2.2 . Cos52 -5⁰ 50' 20'' = 2.188 m
BJ = 5.0 . Cos53 -6⁰ 20' 20'' = 4.951 m
A1 = 6.0 . Cos54 -5⁰ 50' 20'' = 5.968 m
A2 = 6.1 . Cos55 -5⁰ 50' 20'' = 6.068 m
P11 AS = 2.4 . Cos56 1⁰ 41' 30'' = 2.398 m
BJ = 5.2 . Cos57 1⁰ 41' 25'' = 5.195 m
A1 = 6.2 . Cos58 1⁰ 41' 25'' = 6.195 m
A2 = 7.0 . Cos59 1⁰ 41' 30'' = 6.994 m
P12 AS = 4.5 . Cos60 -7⁰ 1' 5'' = 4.434 m
BJ = 5.1 . Cos61 -7⁰ 1' 55'' = 5.025 m
A1 = 6.8 . Cos62 -7⁰ 1' 50'' = 6.700 m
A2 = 7.7 . Cos63 -7⁰ 8' 0'' = 7.590 m
P13 AJ = 2.0 . Cos64 -10⁰ 24' 0'' = 1.944 m
BJ = 4.2 . Cos65 -10⁰ 24' 0'' = 4.083 m
A1 = 4.7 . Cos66 -10⁰ 24' 0'' = 4.569 m
A2 = 4.8 . Cos67 -10⁰ 24' 0'' = 4.667 m
A3 = 6.3 . Cos68 -10⁰ 24' 0'' = 6.125 m
P14 AJ = 1.6 . Cos69 -8⁰ 46' 50'' = 1.575 m
BJ = 3.4 . Cos70 -8⁰ 46' 45'' = 3.346 m
A1 = 4.0 . Cos71 -8⁰ 46' 45'' = 3.937 m
A2 = 5.2 . Cos72 -8⁰ 46' 45'' = 5.118 m

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P15 AJ = 2.6 . Cos73 -8⁰ 17' 45'' = 2.553 m


BJ = 4.8 . Cos74 -9⁰ 17' 5'' = 4.690 m
A1 = 6.6 . Cos75 -9⁰ 0' 5'' = 6.439 m
A2 = 9.2 . Cos76 -9⁰ 0' 50'' = 8.976 m
P16 AJ = 2.6 . Cos77 -9⁰ 51' 55'' = 2.548 m
BJ = 5.7 . Cos78 -6⁰ 51' 30'' = 5.654 m
A1 = 6.5 . Cos79 -6⁰ 51' 30'' = 6.448 m
A2 = 8.6 . Cos80 -6⁰ 51' 30'' = 8.531 m
AJ1 = 9.3 . Cos81 -6⁰ 44' 30'' = 9.222 m
AJ2 = 9.4 . Cos82 -6⁰ 45' 25'' = 9.322 m
∑ = 250.777 m

4.3.2.6. Perhitungan D.Sin & D.Cos Patok Detail


A. Menghitung Dx
Rumus :
Dx = D sin a
P0 - AJ = 3.177 Sin 189⁰ 32⁰ ### = -0.527 m
BJ = 5.163 Sin 189⁰ 0⁰ ### = -0.809 m
D1 = 5.759 Sin 189⁰ 19⁰ ### = -0.934 m
D2 = 5.958 Sin 190⁰ 36⁰ ### = -1.097 m
D3 = 6.156 Sin 190⁰ 38⁰ ### = -1.137 m
D4 = 6.255 Sin 191⁰ 1⁰ ### = -1.197 m
P1 - AJ = 2.996 Sin 266⁰ 24⁰ ### = -2.990 m
BJ = 4.594 Sin 268⁰ 24⁰ ### = -4.592 m
D1 = 5.392 Sin 267⁰ 55⁰ ### = -5.389 m
D2 = 5.792 Sin 268⁰ 1⁰ ### = -5.788 m
D3 = 5.892 Sin 268⁰ 1⁰ ### = -5.888 m
D4 = 6.191 Sin 267⁰ 54⁰ ### = -6.187 m
P2 - AJ = 2.595 Sin 227⁰ 30⁰ ### = -1.914 m
BJ = 5.190 Sin 228⁰ 24⁰ ### = -3.881 m
D1 = 6.786 Sin 230⁰ 45⁰ ### = -5.256 m
D2 = 7.186 Sin 230⁰ 24⁰ ### = -5.537 m
D3 = 7.285 Sin 230⁰ 45⁰ ### = -5.642 m
D4 = 7.385 Sin 230⁰ 18⁰ ### = -5.682 m
P3 - AJ = 3.183 Sin 230⁰ 35⁰ ### = -2.459 m
BJ = 6.535 Sin 230⁰ 22⁰ ### = -5.033 m
D1 = 7.991 Sin 229⁰ 22⁰ ### = -6.065 m
D2 = 8.091 Sin 229⁰ 15⁰ ### = -6.130 m
D3 = 8.191 Sin 228⁰ 43⁰ ### = -6.155 m
D4 = 8.291 Sin 228⁰ 42⁰ ### = -6.229 m
P4 - AJ = 0.998 Sin 237⁰ 52⁰ ### = -0.846 m

88
BJ = 5.591 Sin 240⁰ 31⁰ ### = -4.868 m

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

D1 = 7.388 Sin 246⁰ 30⁰ ### = -6.776 m


D2 = 7.488 Sin 241⁰ 53⁰ ### = -6.605 m
D3 = 8.187 Sin 241⁰ 0⁰ ### = -7.161 m
D4 = 8.287 Sin 240⁰ 49⁰ ### = -7.236 m
P5 - AJ = 2.592 Sin 256⁰ 10⁰ ### = -2.517 m
BJ = 5.184 Sin 254⁰ 59⁰ ### = -5.008 m
A1 = 6.580 Sin 253⁰ 59⁰ ### = -6.325 m
A2 = 7.777 Sin 254⁰ 7⁰ ### = -7.480 m
P6 - AJ = 1.977 Sin 215⁰ 42⁰ ### = -1.154 m
BJ = 2.965 Sin 215⁰ 0⁰ ### = -1.701 m
A1 = 3.953 Sin 214⁰ 29⁰ ### = -2.239 m
A2 = 4.942 Sin 212⁰ 54⁰ ### = -2.685 m
P7 - AJ = 1.975 Sin 268⁰ 12⁰ ### = -1.974 m
BJ = 4.542 Sin 273⁰ 2⁰ ### = -4.535 m
A1 = 4.739 Sin 270⁰ 27⁰ ### = -4.739 m
A2 = 4.838 Sin 268⁰ 57⁰ ### = -4.837 m
P8 - AJ = 2.321 Sin 258⁰ 58⁰ ### = -2.278 m
BJ = 3.288 Sin 253⁰ 58⁰ ### = -3.160 m
A1 = 7.358 Sin 249⁰ 0⁰ ### = -6.869 m
A2 = 7.494 Sin 248⁰ 45⁰ ### = -6.985 m
P9 - AS = 1.885 Sin 441⁰ 16⁰ ### = 1.863 m
BJ = 3.327 Sin 437⁰ 37⁰ ### = 3.250 m
A1 = 3.718 Sin 436⁰ 54⁰ ### = 3.622 m
A2 = 5.871 Sin 435⁰ 17⁰ ### = 5.679 m
P10 - AS = 2.188 Sin 443⁰ 7⁰ ### = 2.173 m
BJ = 4.951 Sin 446⁰ 22⁰ ### = 4.941 m
A1 = 5.968 Sin 447⁰ 22⁰ ### = 5.962 m
A2 = 6.068 Sin 447⁰ 1⁰ ### = 6.060 m
P11 - AS = 2.398 Sin 424⁰ 22⁰ ### = 2.162 m
BJ = 5.195 Sin 423⁰ 6⁰ ### = 4.633 m
A1 = 6.195 Sin 423⁰ 6⁰ ### = 5.524 m
A2 = 6.994 Sin 421⁰ 24⁰ ### = 6.141 m
P12 - AS = 4.434 Sin 426⁰ 52⁰ ### = 4.077 m
BJ = 5.025 Sin 431⁰ 49⁰ ### = 4.774 m
A1 = 6.700 Sin 433⁰ 36⁰ ### = 6.428 m
A2 = 7.590 Sin 437⁰ 26⁰ ### = 7.408 m
P13 - AJ = 1.944 Sin 426⁰ 18⁰ ### = 1.781 m
BJ = 4.083 Sin 424⁰ 30⁰ ### = 3.686 m
A1 = 4.569 Sin 423⁰ 56⁰ ### = 4.105 m
A2 = 4.667 Sin 424⁰ 9⁰ ### = 4.200 m
A3 = 6.125 Sin 421⁰ 25⁰ ### = 5.378 m

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P14 - AJ = 1.575 Sin 404⁰ 20⁰ ### = 1.100 m


BJ = 3.346 Sin 407⁰ 12⁰ ### = 2.456 m
A1 = 3.937 Sin 407⁰ 12⁰ ### = 2.889 m
A2 = 5.118 Sin 408⁰ 23⁰ ### = 3.826 m
P15 - AJ = 2.553 Sin 352⁰ 13⁰ ### = -0.345 m
BJ = 4.690 Sin 354⁰ 29⁰ ### = -0.450 m
A1 = 6.439 Sin 355⁰ 29⁰ ### = -0.507 m
A2 = 8.976 Sin 354⁰ 39⁰ ### = -0.836 m
P16 - AJ = 2.548 Sin 504⁰ 55⁰ ### = 1.464 m
BJ = 5.654 Sin 494⁰ 40⁰ ### = 4.021 m
A1 = 6.448 Sin 494⁰ 19⁰ ### = 4.612 m
A2 = 8.531 Sin 494⁰ 41⁰ ### = 6.064 m
AJ1 = 9.222 Sin 398⁰ 15⁰ ### = 5.710 m
AJ2 = 9.322 Sin 391⁰ 45⁰ ### = 4.905 m
∑ = -65.735 m

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

B. Menghitung Dy
Rumus :
Dy = D cos a

P0 - AJ = 3.200 Cos 189⁰ 32' 50'' = -3.156


BJ = 5.200 Cos 189⁰ 0' 35'' = -5.136
D1 = 5.800 Cos 189⁰ 19' 50'' = -5.723
D2 = 6.000 Cos 190⁰ 36' 25'' = -5.897
D3 = 6.200 Cos 190⁰ 38' 50'' = -6.093
D4 = 6.300 Cos 191⁰ 1' 40'' = -6.184
P1 - AJ = 3.000 Cos 266⁰ 24' 40'' = -0.188
BJ = 4.600 Cos 268⁰ 24' 40'' = -0.128
D1 = 5.400 Cos 267⁰ 55' 45'' = -0.195
D2 = 5.800 Cos 268⁰ 1' 15'' = -0.200
D3 = 5.900 Cos 268⁰ 1' 15'' = -0.204
D4 = 6.200 Cos 267⁰ 54' 55'' = -0.226
P2 - AJ = 2.600 Cos 227⁰ 30' 55'' = -1.756
BJ = 5.200 Cos 228⁰ 24' 25'' = -3.452
D1 = 6.800 Cos 230⁰ 45' 30'' = -4.302
D2 = 7.200 Cos 230⁰ 24' 25'' = -4.589
D3 = 7.300 Cos 230⁰ 45' 30'' = -4.618
D4 = 7.400 Cos 230⁰ 18' 0'' = -4.727
P3 - AJ = 3.200 Cos 230⁰ 35' 50'' = -2.031
BJ = 6.600 Cos 230⁰ 22' 20'' = -4.209
D1 = 8.000 Cos 229⁰ 22' 20'' = -5.209
D2 = 8.100 Cos 229⁰ 15' 40'' = -5.286
D3 = 8.200 Cos 228⁰ 43' 10'' = -5.410
D4 = 8.300 Cos 228⁰ 42' 10'' = -5.478
P4 - AJ = 1.000 Cos 237⁰ 52' 60'' = -0.532
BJ = 5.600 Cos 240⁰ 31' 55'' = -2.755
D1 = 7.388 Cos 246⁰ 30⁰ ### = -2.946
D2 = 7.488 Cos 241⁰ 53⁰ ### = -3.529
D3 = 8.187 Cos 241⁰ 0⁰ ### = -3.968
D4 = 8.287 Cos 240⁰ 49⁰ ### = -4.040
P5 AJ = 2.592 Cos 256⁰ 10⁰ ### = -0.619
BJ = 5.184 Cos 254⁰ 59⁰ ### = -1.342
A1 = 6.580 Cos 253⁰ 59⁰ ### = -1.815
A2 = 7.777 Cos 254⁰ 7⁰ ### = -2.127
P6 AJ = 1.977 Cos 215⁰ 42⁰ ### = -1.605
BJ = 2.965 Cos 215⁰ 0⁰ ### = -2.429
A1 = 3.953 Cos 214⁰ 29⁰ ### = -3.258

88
A2 = 4.942 Cos 212⁰ 54⁰ ### = -4.149

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P7 AJ = 1.975 Cos 268⁰ 12⁰ ### = -0.061 m


BJ = 4.542 Cos 273⁰ 2⁰ ### = 0.240 m
A1 = 4.739 Cos 270⁰ 27⁰ ### = 0.038 m
A2 = 4.838 Cos 268⁰ 57⁰ ### = -0.088 m
m P8 AJ = 2.321 Cos 258⁰ 58⁰ ### = -0.444 m
m BJ = 3.288 Cos 253⁰ 58⁰ ### = -0.907 m
m A1 = 7.358 Cos 249⁰ 0⁰ ### = -2.637 m
m A2 = 7.494 Cos 248⁰ 45⁰ ### = -2.716 m
m P9 AS = 1.885 Cos 441⁰ 16⁰ ### = 0.286 m
m BJ = 3.327 Cos 437⁰ 37⁰ ### = 0.713 m
m A1 = 3.718 Cos 436⁰ 54⁰ ### = 0.842 m
m A2 = 5.871 Cos 435⁰ 17⁰ ### = 1.491 m
m P10 AS = 2.188 Cos 443⁰ 7⁰ ### = 0.262 m
m BJ = 4.951 Cos 446⁰ 22⁰ ### = 0.313 m
m A1 = 5.968 Cos 447⁰ 22⁰ ### = 0.273 m
m A2 = 6.068 Cos 447⁰ 1⁰ ### = 0.315 m
m P11 AS = 2.398 Cos 424⁰ 22⁰ ### = 1.037 m
m BJ = 5.195 Cos 423⁰ 6⁰ ### = 2.351 m
m A1 = 6.195 Cos 423⁰ 6⁰ ### = 2.803 m
m A2 = 6.994 Cos 421⁰ 24⁰ ### = 3.347 m
m P12 AS = 4.434 Cos 426⁰ 52⁰ ### = 1.741 m
m BJ = 5.025 Cos 431⁰ 49⁰ ### = 1.567 m
m A1 = 6.700 Cos 433⁰ 36⁰ ### = 1.890 m
m A2 = 7.590 Cos 437⁰ 26⁰ ### = 1.650 m
m P13 AJ = 1.944 Cos 426⁰ 18⁰ ### = 0.781 m
m BJ = 4.083 Cos 424⁰ 30⁰ ### = 1.757 m
m A1 = 4.569 Cos 423⁰ 56⁰ ### = 2.008 m
m A2 = 4.667 Cos 424⁰ 9⁰ ### = 2.034 m
m A3 = 6.125 Cos 421⁰ 25⁰ ### = 2.930 m
m P14 AJ = 1.575 Cos 404⁰ 20⁰ ### = 1.126 m
m BJ = 3.346 Cos 407⁰ 12⁰ ### = 2.273 m
m A1 = 3.937 Cos 407⁰ 12⁰ ### = 2.674 m
m A2 = 5.118 Cos 408⁰ 23⁰ ### = 3.399 m
m P15 AJ = 2.553 Cos 352⁰ 13⁰ ### = 2.530 m
m BJ = 4.690 Cos 354⁰ 29⁰ ### = 4.668 m
m A1 = 6.439 Cos 355⁰ 29⁰ ### = 6.419 m
m A2 = 8.976 Cos 354⁰ 39⁰ ### = 8.937 m
m P16 AJ = 2.548 Cos 504⁰ 55⁰ ### = -2.085 m
m BJ = 5.654 Cos 494⁰ 40⁰ ### = -3.975 m
m A1 = 6.448 Cos 494⁰ 19⁰ ### = -4.506 m
m A2 = 8.531 Cos 494⁰ 41⁰ ### = -6.000 m

88
m AJ1 = 9.222 Cos 398⁰ 15⁰ ### = 7.242 m

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

AJ2 = 9.322 Cos 391⁰ 45⁰ ### = 7.926 m


∑ = -65.067 m
4.3.2.7. Perhitungan Kordinat Titik Detail

Data Kordinat Awal :


x P0 = 22 m
y P0 = 35 m

A. arah x
Rumus :
x = Xawal ± D sin α awal

P0 - AJ = 22 + -0.527 = 21.473 m
- BJ = 22 + -0.809 = 21.191 m
- D1 = 22 + -0.934 = 21.066 m
- D2 = 22 + -1.097 = 20.903 m
- D3 = 22 + -1.137 = 20.863 m
- D4 = 22 + -1.197 = 20.803 m
P1 - AJ = 6.2 + -2.990 = 3.213 m
- BJ = 6.202441 + -4.592 = 1.611 m
- D1 = 6.202441 + -5.389 = 0.814 m
- D2 = 6.202441 + -5.788 = 0.414 m
- D3 = 6.202441 + -5.888 = 0.314 m
- D4 = 6.202441 + -6.187 = 0.015 m
P2 - AJ = 3.641438 + -1.914 = 1.728 m
- BJ = 3.641438 + -3.881 = -0.240 m
- D1 = 3.641438 + -5.256 = -1.614 m
- D2 = 3.641438 + -5.537 = -1.896 m
- D3 = 3.641438 + -5.642 = -2.001 m
- D4 = 3.641438 + -5.682 = -2.041 m
P3 - AJ = 1.930496 + -2.459 = -0.529 m
- BJ = 1.930496 + -5.033 = -3.103 m
- D1 = 1.930496 + -6.065 = -4.134 m
- D2 = 1.930496 + -6.130 = -4.200 m
- D3 = 1.930496 + -6.155 = -4.225 m
- D4 = 1.930496 + -6.229 = -4.298 m
P4 - AJ = 6.65056 + -0.846 = 5.805 m
- BJ = 6.65056 + -4.868 = 1.783 m
- D1 = 6.65056 + -6.776 = -0.125 m
D2 = 6.65056 + -6.605 = 0.046 m
D3 = 6.65056 + -7.161 = -0.511 m

88
D4 = 6.65056 + -7.236 = -0.585 m

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P5 AJ = 8.347702 + -2.517 = 5.831 m


BJ = 8.347702 + -5.008 = 3.340 m
A1 = 8.347702 + -6.325 = 2.023 m
A2 = 8.347702 + -7.480 = 0.868 m
P6 AJ = 12.71648 + -1.154 = 11.563 m
BJ = 12.71648 + -1.701 = 11.015 m
A1 = 12.71648 + -2.239 = 10.477 m
A2 = 12.71648 + -2.685 = 10.032 m
P7 AJ = 15.47135 + -1.974 = 13.498 m
BJ = 15.47135 + -4.535 = 10.936 m
A1 = 15.47135 + -4.739 = 10.733 m
A2 = 15.47135 + -4.837 = 10.634 m
P8 AJ = 40.67678 + -2.278 = 38.399 m
BJ = 40.67678 + -3.160 = 37.517 m
A1 = 40.67678 + -6.869 = 33.807 m
A2 = 40.67678 + -6.985 = 33.692 m
P9 AS = 54.38103 + 1.863 = 56.244 m
BJ = 54.38103 + 3.250 = 57.631 m
A1 = 54.38103 + 3.622 = 58.003 m
A2 = 54.38103 + 5.679 = 60.060 m
P10 AS = 58.391 + 2.173 = 60.564 m
BJ = 58.391 + 4.941 = 63.332 m
A1 = 58.391 + 5.962 = 64.353 m
A2 = 58.391 + 6.060 = 64.451 m
P11 AS = 56.57132 + 2.162 = 58.733 m
BJ = 56.57132 + 4.633 = 61.205 m
A1 = 56.57132 + 5.524 = 62.096 m
A2 = 56.57132 + 6.141 = 62.712 m
P12 AS = 53.73263 + 4.077 = 57.810 m
BJ = 53.73263 + 4.774 = 58.507 m
A1 = 53.73263 + 6.428 = 60.160 m
A2 = 53.73263 + 7.408 = 61.141 m
P13 AJ = 50.42103 + 1.781 = 52.202 m
BJ = 50.42103 + 3.686 = 54.107 m
A1 = 50.42103 + 4.105 = 54.526 m
A2 = 50.42103 + 4.200 = 54.621 m
A3 = 50.42103 + 5.378 = 55.799 m
P14 AJ = 33.48354 + 1.100 = 34.584 m
BJ = 33.48354 + 2.456 = 35.939 m
A1 = 33.48354 + 2.889 = 36.373 m

88
A2 = 33.48354 + 3.826 = 37.310 m

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

P15 AJ = 39.07751 + -0.345 = 38.732 m


BJ = 39.07751 + -0.450 = 38.628 m
A1 = 39.07751 + -0.507 = 38.571 m
A2 = 39.07751 + -0.836 = 38.241 m
P16 AJ = 36.5369 + 1.464 = 38.001 m
BJ = 36.5369 + 4.021 = 40.558 m
A1 = 36.5369 + 4.612 = 41.149 m
A2 = 36.5369 + 6.064 = 42.601 m
AJ1 = 36.5369 + 5.710 = 42.247 m
AJ2 = 36.5369 + 4.905 = 41.442 m
B. arah y
Rumus :
y = Y awal ± D cos α awal

P0 - AJ = 35 + -3.156 = 31.84432 m
BJ = 35 + -5.136 = 29.86416 m
D1 = 35 + -5.723 = 29.27674 m
D2 = 35 + -5.897 = 29.10252 m
D3 = 35 + -6.093 = 28.90674 m
D4 = 35 + -6.184 = 28.81633 m
P1 - AJ = 49.31 + -0.188 = 49.12433 m
BJ = 49.31 + -0.128 = 49.18458 m
D1 = 49.31 + -0.195 = 49.117 m
D2 = 49.31 + -0.200 = 49.11181 m
D3 = 49.31 + -0.204 = 49.10836 m
D4 = 49.31 + -0.226 = 49.08659 m
P2 - AJ = 48.47 + -1.756 = 46.71136 m
BJ = 48.47 + -3.452 = 45.01544 m
D1 = 48.47 + -4.302 = 44.16576 m
D2 = 48.47 + -4.589 = 43.87861 m
D3 = 48.47 + -4.618 = 43.84946 m
D4 = 48.47 + -4.727 = 43.74051 m
P3 - AJ = 45.22 + -2.031 = 43.19066 m
BJ = 45.22 + -4.209 = 41.01246 m
D1 = 45.22 + -5.209 = 40.01278 m
D2 = 45.22 + -5.286 = 39.93576 m
D3 = 45.22 + -5.410 = 39.812 m
D4 = 45.22 + -5.478 = 39.74421 m
P4 - AJ = 18.07 + -0.532 = 17.53558 m
BJ = 18.07 + -2.755 = 15.31237 m

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

D1 = 18.07 + -2.946 = 15.12 m


D2 = 18.07 + -3.529 = 14.54 m
D3 = 18.07 + -3.968 = 14.1 m
D4 = 18.07 + -4.040 = 14.03 m
P5 - AJ = 15.29 + -0.619 = 14.67 m
BJ = 15.29 + -1.342 = 13.94 m
A1 = 15.29 + -1.815 = 13.47 m
A2 = 15.29 + -2.127 = 13.16 m
P6 - AJ = 14.35 + -1.605 = 12.74 m
BJ = 14.35 + -2.429 = 11.92 m
A1 = 14.35 + -3.258 = 11.09 m
A2 = 14.35 + -4.149 = 10.2 m
P7 - AJ = 14.85 + -0.061 = 14.79 m
BJ = 14.85 + 0.240 = 15.09 m
A1 = 14.85 + 0.038 = 14.89 m
A2 = 14.85 + -0.088 = 14.76 m
P8 - AJ = 35.96 + -0.444 = 35.52 m
BJ = 35.96 + -0.907 = 35.06 m
A1 = 35.96 + -2.637 = 33.33 m
A2 = 35.96 + -2.716 = 33.25 m
P9 - AS = 63.16 + 0.286 = 63.45 m
BJ = 63.16 + 0.713 = 63.87 m
A1 = 63.16 + 0.842 = 64 m
A2 = 63.16 + 1.491 = 64.65 m
P10 - AS = 89.49 + 0.262 = 89.75 m
BJ = 89.49 + 0.313 = 89.8 m
A1 = 89.49 + 0.273 = 89.76 m
A2 = 89.49 + 0.315 = 89.8 m
P11 - AS = 92.88 + 1.037 = 93.92 m
BJ = 92.88 + 2.351 = 95.23 m
A1 = 92.88 + 2.803 = 95.68 m
A2 = 92.88 + 3.347 = 96.23 m
P12 - AS = 94.68 + 1.741 = 96.42 m
BJ = 94.68 + 1.567 = 96.25 m
A1 = 94.68 + 1.890 = 96.57 m
A2 = 94.68 + 1.650 = 96.33 m
P13 - AJ = 94.69 + 0.781 = 95.47 m
BJ = 94.69 + 1.757 = 96.45 m
A1 = 94.69 + 2.008 = 96.7 m
A2 = 94.69 + 2.034 = 96.72 m
A3 = 94.69 + 2.930 = 97.62 m

88
LABORATORIUM ILMU UKUR TANAH L
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate Jl. Pe

P14 - AJ = 77.74 + 1.126 = 78.865394 m


BJ = 77.74 + 2.273 = 80.011985 m
A1 = 77.74 + 2.674 = 80.413094 m
A2 = 77.74 + 3.399 = 81.137836 m
P15 - AJ = 37.29 + 2.530 = 39.818668 m P0
BJ = 37.29 + 4.668 = 41.957003 m
A1 = 37.29 + 6.419 = 43.707411 m
A2 = 37.29 + 8.937 = 46.225343 m
P16 - AJ = 11.24 + -2.085 = 9.1514819 m
BJ = 11.24 + -3.975 = 7.2613146 m
A1 = 11.24 + -4.506 = 6.7306892 m P1
A2 = 11.24 + -6.000 = 5.2365895 m
AJ1 = 11.24 + 7.242 = 18.478302 m
AJ2 = 11.24 + 7.926 = 19.162937 m

P2

P3

P4

P5

P6

88
LABORATORIUM ILMU UKUR TANAH LA
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate Jl. Per

4.3.2.8. Perhitungan Beda Tinggi Titik Detail P7

P0 - AJ = 1.51 + 50 (1.25 - 1.22) sin 2 -5⁰ 10' 25'' - 1.238 = 0.0 m P8


BJ = 1.51 + 51 (1.18 - 1.13) sin 2 -5⁰ 10' 25'' - 1.154 = -0.1 m
D1 = 1.51 + 52 (1.23 - 1.18) sin 2 -5⁰ 10' 25'' - 1.205 = -0.2 m
D2 = 1.51 + 53 (1.76 - 1.70) sin 2 -5⁰ 10' 25'' - 1.732 = -0.8 m
D3 = 1.51 + 54 (1.75 - 1.68) sin 2 -5⁰ 10' 25'' - 1.714 = -0.8 m P9
D4 = 1.51 + 55 (1.22 - 1.15) sin 2 -5⁰ 10' 25'' - 1.1835 = -0.3 m
P1 - AJ = 1.44 + 56 (1.26 - 1.23) sin 2 -3⁰ 50' 60'' - 1.245 = 0.1 m
BJ = 1.44 + 57 (1.26 - 1.21) sin 2 -3⁰ 51' 5'' - 1.232 = 0.0 m
D1 = 1.44 + 58 (1.21 - 1.16) sin 2 -3⁰ 51' 5'' - 1.182 = 0.0 m P10
D2 = 1.44 + 59 (1.75 - 1.70) sin 2 -3⁰ 51' 5'' - 1.725 = -0.5 m
D3 = 1.44 + 60 (1.73 - 1.67) sin 2 -3⁰ 51' 5'' - 1.7035 = -0.5 m
D4 = 1.44 + 61 (1.18 - 1.11) sin 2 -3⁰ 51' 5'' - 1.144 = 0.0 m
P2 - AJ = 1.49 + 62 (1.31 - 1.29) sin 2 -3⁰ 26' 0'' - 1.299 = 0.0 m P11
BJ = 1.49 + 63 (1.31 - 1.26) sin 2 -3⁰ 26' 0'' - 1.288 = -0.1 m
D1 = 1.49 + 64 (1.47 - 1.40) sin 2 -3⁰ 26' 0'' - 1.431 = -0.3 m
D2 = 1.49 + 65 (2.02 - 1.95) sin 2 -3⁰ 26' 0'' - 1.982 = -0.9 m
D3 = 1.49 + 66 (2.00 - 1.93) sin 2 -3⁰ 26' 0'' - 1.9675 = -0.9 m P12
D4 = 1.49 + 67 (1.48 - 1.41) sin 2 -3⁰ 26' 0'' - 1.447 = -0.4 m
P3 - AJ = 1.49 + 68 (1.01 - 0.98) sin 2 -5⁰ 48' 25'' - 0.995 = 0.2 m
BJ = 1.49 + 69 (0.52 - 0.46) sin 2 -6⁰ 17' 20'' - 0.489 = 0.1 m
D1 = 1.49 + 70 (0.98 - 0.90) sin 2 -2⁰ 5' 15'' - 0.94 = 0.2 m P13
D2 = 1.49 + 71 (1.52 - 1.44) sin 2 -2⁰ 5' 15'' - 1.4835 = -0.4 m
D3 = 1.49 + 72 (1.63 - 1.55) sin 2 -2⁰ 5' 15'' - 1.589 = -0.5 m
D4 = 1.49 + 73 (0.98 - 0.89) sin 2 -2⁰ 5' 15'' - 0.9355 = 0.2 m
P4 - AJ = 1.48 + 74 (1.16 - 1.15) sin 2 -3⁰ 43' 35'' - 1.155 = 0.3 m
BJ = 1.48 + 75 (1.02 - 0.96) sin 2 -3⁰ 43' 34'' - 0.99 = 0.2 m P14
D1 = 1.48 + 76 (0.92 - 0.85) sin 2 -3⁰ 43' 35'' - 0.885 = 0.1 m
D2 = 1.48 + 77 (1.42 - 1.35) sin 2 -3⁰ 43' 35'' - 1.3835 = -0.4 m
D3 = 1.48 + 78 (1.40 - 1.32) sin 2 -3⁰ 43' 35'' - 1.36 = -0.4 m
D4 = 1.48 + 79 (0.88 - 0.80) sin 2 -3⁰ 43' 35'' - 0.8405 = 0.1 m P15
P5 - AJ = 1.48 + 80 (1.23 - 1.20) sin 2 -4⁰ 51' 45'' - 1.212 = 0.0 m
BJ = 1.48 + 81 (1.18 - 1.13) sin 2 -4⁰ 51' 45'' - 1.154 = -0.1 m
A1 = 1.48 + 82 (0.95 - 0.88) sin 2 -4⁰ 51' 45'' - 0.913 = 0.0 m
A2 = 1.48 + 83 (0.87 - 0.79) sin 2 -4⁰ 51' 45'' - 0.826 = -0.1 m P16
P6 - AJ = 0.41 + 84 (1.14 - 1.12) sin 2 -7⁰ 48' 20'' - 1.125 = -1.1 m
BJ = 0.41 + 85 (0.98 - 0.95) sin 2 -7⁰ 48' 20'' - 0.968 = -1.1 m
A1 = 0.41 + 86 (0.93 - 0.89) sin 2 -7⁰ 48' 20'' - 0.913 = -1.2 m

88
A2 = 0.41 + 87 (0.81 - 0.76) sin 2 -7' 48' ### - 0.787 = -1.3 m

88
LABORATORIUM ILMU UKUR TANAH
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

- AJ = 1.41 + 88 (1.15 - 1.13) sin 40 -7⁰ 31⁰


BJ = 1.41 + 89 (0.80 - 0.75) sin 41 -7⁰ 31⁰
A1 = 1.41 + 90 (0.77 - 0.73) sin 42 -7⁰ 31⁰
A2 = 1.41 + 91 (0.71 - 0.67) sin 43 -7⁰ 31⁰
- AJ = 1.36 + 92 (0.95 - 0.92) sin 44 -11⁰ 31⁰
BJ = 1.36 + 93 (0.61 - 0.58) sin 45 -11⁰ 31⁰
A1 = 1.36 + 94 (1.16 - 1.08) sin 46 -5⁰ 40⁰
A2 = 1.36 + 95 (1.28 - 1.21) sin 47 -2⁰ 23⁰
- AS = 1.32 + 96 (0.85 - 0.83) sin 48 -14⁰ 8⁰
BJ = 1.32 + 97 (0.82 - 0.79) sin 49 -9⁰ 34⁰
A1 = 1.32 + 98 (0.80 - 0.77) sin 50 -9⁰ 34⁰
A2 = 1.32 + 99 (1.23 - 1.17) sin 51 -9⁰ 34⁰
- AS = 1.32 + 100 (1.41 - 1.39) sin 52 -5⁰ 50⁰
BJ = 1.32 + 101 (1.33 - 1.28) sin 53 -6⁰ 20⁰
A1 = 1.32 + 102 (1.37 - 1.31) sin 54 -5⁰ 50⁰
A2 = 1.32 + 103 (1.33 - 1.27) sin 55 -5⁰ 50⁰
- AS = 1.32 + 104 (1.44 - 1.41) sin 56 1⁰ 41⁰
BJ = 1.32 + 105 (1.65 - 1.60) sin 57 1⁰ 41⁰
A1 = 1.32 + 106 (1.79 - 1.73) sin 58 1⁰ 41⁰
A2 = 1.32 + 107 (1.80 - 1.73) sin 59 1⁰ 41⁰
- AS = 1.375 + 108 (1.26 - 1.21) sin 60 -7⁰ 1⁰
BJ = 1.375 + 109 (1.03 - 0.98) sin 61 -7⁰ 1⁰
A1 = 1.375 + 110 (1.02 - 0.95) sin 62 -7⁰ 1⁰
A2 = 1.375 + 111 (0.73 - 0.65) sin 63 -7⁰ 8⁰
- AJ = 1.45 + 112 (1.06 - 1.04) sin 64 -10⁰ 24⁰
BJ = 1.45 + 113 (0.88 - 0.84) sin 65 -10⁰ 24⁰
A1 = 1.45 + 114 (0.86 - 0.82) sin 66 -10⁰ 24⁰
A2 = 1.45 + 115 (1.18 - 1.13) sin 67 -10⁰ 24⁰
A3 = 1.45 + 116 (1.19 - 1.12) sin 68 -10⁰ 24⁰
- AJ = 1.53 + 117 (1.33 - 1.31) sin 69 -8⁰ 46⁰
BJ = 1.53 + 118 (1.21 - 1.17) sin 70 -8⁰ 46⁰
A1 = 1.53 + 119 (1.33 - 1.29) sin 71 -8⁰ 46⁰
A2 = 1.53 + 120 (1.45 - 1.40) sin 72 -8⁰ 46⁰
- AJ = 1.47 + 121 (1.14 - 1.11) sin 73 -9⁰ 17⁰
BJ = 1.47 + 122 (0.97 - 0.92) sin 74 -9⁰ 17⁰
A1 = 1.47 + 123 (0.92 - 0.85) sin 75 -9⁰ 0⁰
A2 = 1.47 + 124 (0.55 - 0.46) sin 76 -9⁰ 0⁰
- AJ = 1.52 + 125 (1.24 - 1.22) sin 77 -6⁰ 51⁰
BJ = 1.52 + 126 (1.08 - 1.03) sin 78 -6⁰ 51⁰
A1 = 1.52 + 127 (1.08 - 1.01) sin 79 -6⁰ 51⁰
A2 = 1.52 + 128 (0.91 - 0.83) sin 80 -6⁰ 51⁰

88
AJ1 = 1.52 + 129 (1.44 - 1.35) sin 81 -6⁰ 44⁰
AJ2 = 1.52 + 130 (1.36 - 1.26) sin 82 -6⁰ 45⁰