0% found this document useful (0 votes)
53 views3 pages

Summary of Motor Greasing: Total Compliance %

The document summarizes the greasing of motors at a power plant. It provides details on 107 high tension (HT) and low tension (LT) motors across various areas of the plant including turbines, electrostatic precipitators and air heaters, and boilers. The report lists the motor name, rating, grease type used, and status of greasing for each motor. It notes issues like pipe issues, unit shutdowns, or motors being in an off condition that prevented some greasing from occurring as scheduled.

Uploaded by

Amaresh Nayak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views3 pages

Summary of Motor Greasing: Total Compliance %

The document summarizes the greasing of motors at a power plant. It provides details on 107 high tension (HT) and low tension (LT) motors across various areas of the plant including turbines, electrostatic precipitators and air heaters, and boilers. The report lists the motor name, rating, grease type used, and status of greasing for each motor. It notes issues like pipe issues, unit shutdowns, or motors being in an off condition that prevented some greasing from occurring as scheduled.

Uploaded by

Amaresh Nayak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Summary of Motor Greasing

SR No. Area Total no. of motor

1 HT Motor BOILER 12

2 HT Motor ESP&AHP 23

3 HT Motor TURBINE 24

4 LT motor AHP 31

5 LT motor BOILER 14

6 LT motor SILO 3

7 LT motor TURBINE 26

8 LT motor BOP 45

Total
Compliance %
Site: 3X660 MW, M/s Talwandi SABO Power Ltd, Mansa, Punjab.

HT Motors Greasing Progress Report Greasing Date

Sr. No Area Description of HT Motors Rating Grease Type Actual Remarks Scheduled
2 TURBINE OCCW PUMP - 1B 220KW LGHP-2
13 TURBINE CEP - 1A 2200KW LGHP-2 Pipe issue

15 TURBINE CEP - 2A 2200KW LGHP-2 Unit Shutdown

20 TURBINE CWP - 1B (only DE side) 5250KW EP3


21 TURBINE CWP - 2A 5250KW EP3 Unit Shutdown
22 TURBINE CWP - 2B 5250KW EP3 Unit Shutdown
55 ESP&AHP ASH AIR COMPRESSOR - 19 350KW Unirex
56 ESP&AHP HCSD PUMP - A 925KW Servo gem2 In off condition
57 ESP&AHP HCSD PUMP - B 925KW Servo gem2 In off condition
58 ESP&AHP HCSD PUMP - C 925KW Servo gem2 In off condition
59 ESP&AHP HCSD PUMP - D 925KW Servo gem2 In off condition
Site: 3X660 MW, M/s Talwandi SABO Power Ltd, Mansa, Punjab.
LT Motors Greasing Progress Report
Sr. No. Area Equipment Scheduled date Actual Scheduled date

TURBINE GEN STATOR COOLING WATER PUMP - 1B Greasing point not available
2 12/9/2020
18 TURBINE BARRING GEAR-TURBINE#3

BOILER DRN PMP OF STRT SPRTR DRN TNK - 2A Motor was in OFF condition
29 12/14/2020
BOILER DRN PMP OF STRT SPRTR DRN TNK - 2B Motor was in OFF condition
30 12/15/2020
BOILER DRN PMP OF STRT SPRTR DRN TNK - 3A Motor was in OFF condition
31 12/16/2020
BOILER DRN PMP OF STRT SPRTR DRN TNK - 3B Motor was in OFF condition
32 12/17/2020
36 BOILER MILL SEAL AIR FAN - 2B 12/21/2020 Unit shutdown
40 BOILER CONDENSATE WATER TRANSFER PUMP - 2B 12/24/2020 Unit shutdown