DHQC Cecb MB Ti Ar DW ML 02 80513

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTES :-
Dimension are in millimeters unless otherwise indicated.
Dimensions indicated in the drawing are approximate. Actual
sizes could vary at the site. It is contractor's responsibility to
A A
check the actual sizes and do the minor changes accordingly.
For details of Iron Mongery, refer Schedule of door hardware
sets and Master Schedule of door hardware, fittings and
accessories.

Frame Width 1190

Door Sash Width 1084


DETAIL - B1
ML-02-80529
B 225 B
Top frame (type F3 )
225

AC coated door sash

Finish Opening height 2100


Door Frame height 2095
Door Opening height 2045
EQ

300mm Long Pull handle


(Back to back fixing)
300mm Long Pull handle

300

300
C C

Door Height 2032


Frame Height 2095
(Back to back fixing)
EQ

OUT IN
Automatic door bottom seal
DETAIL - B2
D D
225

ML-02-80529
FFL. FFL. FFL.
OUT SIDE ELEVATION INSIDE ELEVATION
BLOCK 5C

ELEVATIONS 2 ELEVATIONS 33 SECTION


SECTION -- A
A ZONE 4C ZONE 4D ZONE 6C ZONE 6D

BLOCK 5B

1:25 - Scale 1:25 - Scale 1:25 ZONE 4B ZONE 4A ZONE 6B ZONE 6A

BLOCK 5A

ZONE 9B
ZONE 3C ZONE 3D ZONE 7C ZONE 7D

A
E - ZONE 9A
E
DOOR SASH DETAIL
ZONE 3B ZONE 3A ZONE 7B ZONE 7A

ZONE 1B ZONE 1C

01. Thickness 40mm


ZONE 2B ZONE 2A ZONE 8B ZONE 8A

Finish Masonary opening width1200 02. Size 1084(w) x 2032(h) ZONE 1A

03. Stile 32(t) x 50(w)mm hardwood


Door Frame width 1190 04. Top, Bottom& Intermediate Rail 32(t) x 50(w)mm hardwood
DETAIL - B3 KEY PLAN
Door opening width 1060 06. Lock Block 32(t) x 50(w)mm hardwood
ML-02-80529
07. Door Core 32mm Thick Fenlite core min density
IN 08. face 3.6(t) mm MR plywood
200

09. Lipping 10(t) x 40(w)mm Teak lipping


F F
10. Finish AC Type Coating Rev. Date Desd. Description Drwn. Chk'd App'd
11. Vision Panel N/A This drawing was prepared by CECB based on Architectural design drawings prepared by M/s Muditha Jayakody Associates Pvt.
Ltd, who was the Main Consultant/Architectural Consultant for Defence Headquarters Complex Project, Akuregoda till 30.09.2016.
12. Glass Beading N/A
OUT Client DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
MINISTRY OF DEFENCE
Project
DEFENCE HEADQUARTERS COMPLEX - AKUREGODA
A
- Project Management & Procurement
PROJECT MANAGEMENT UNIT OF THE ARMED FORCES

Architectural Consultant (with effect from 01-10-2016)

CENTRAL ENGINEERING CONSULTANCY BUREAU


G G
Engineering , Quantity Surveying & Construction Management

CENTRAL ENGINEERING CONSULTANCY BUREAU


415, Bauddhaloka Mawatha, Colombo 07.
TEL : 0112668800 FAX: 0112687369
1 PLAN Construction by

- Scale 1:25 CONSTRUCTION MANAGEMENT UNIT OF THE ARMED FORCES


Drawing Title
MAIN BUILDING
BLOCK 02
DOOR TYPE-B1e1 (HARDWARE SET NO. 15)
TYPICAL DETAILED PLAN,ELEVATION & SECTION
Designed Recommended
YGAD ...............................................
CONSULTANT ARCHITECT / SENIOR ARCHITECT
Drawn DSS/KKD
H Approved H
........................................
Checked TOT DGM (Architectural)
Submitted Scale Date Status
TGRS 1:25 23.12.2020
CAD File P:\02_Bldgs\01_MB\MB_AR\ARPrint\TI\DETAILS\TIMBER DOORS\Block 2 TEN
Sheet Size Drawing No. Rev. No.
This drawing is sole property of CECB. Data contained on this drawing shall not to be used, reproduced, duplicated in whole or part without the A3 DHQC-CECB-MB-TI-AR-DW-ML-02-80513 -
prior permission of CECB. CECB shall not be held responsible for the unauthorized use of this drawing on Projects other than for which it was used.