Question 1
The time between successive units coming off an assembly line is called
lead time
cycle time
replenishment time
none of these
QUESTION 2
.
When developing inventory cost models, which of the following are not
included as costs to place an order?
.
Taxes
QUESTION 4
.
QUESTION 8
.
Which of the following dispatching rules ordinarily gives the best results when
the criterion is lowest time for completion of the full sequence of jobs?
shortest processing time (SPT)
QUESTION 9
.
The output of a production system is
Goods and Services
QUESTION 10
.
Which of the following statements is true of Lean-Six Sigma?
Lean principles include the 5Ss framework and practices.
QUESTION 11
.
QUESTION 12
.
QUESTION 13
.
QUESTION 14
.
The normal application of a p-chart is in
process control by attributes
QUESTION 15
.
Which of the following dispatching rules tends to minimize job flow time?
SPT: shortest processing time
QUESTION 17
.
Motivation is a result of
MBO
QUESTION 18
.
Purchase involves
Identifying need of material
Placing purchase order
Verifying received goods
QUESTION 21
.
QUESTION 23
.
QUESTION 25
.
QUESTION 26
.
QUESTION 27
.
A characteristic that was once an order winner may become an order qualifier,
and vice versa.
True
QUESTION 28
.
QUESTION 29
.
QUESTION 30
.
Darryl is a chemist at a pharmaceutical company, and he was asked by the decision-making unit at his company to visit and
evaluate potential vendors that will supply his company with the chemicals required to manufacture their products and to
conduct laboratory tests of a new product that can be used in the manufacture of their products. Then is Darryl is assisting
the company with informal information search.
False
QUESTION 31
.
QUESTION 32
.
False
QUESTION 33
.
QUESTION 34
.
Smoothing coefficient is low for new products for which demand is shifting
False
QUESTION 35
.
QUESTION 36
.
QUESTION 37
.
QUESTION 38
.
QUESTION 39
.
The process improvement technique that sorts the vital few from the trivial
many is Pareto analysis.
True
QUESTION 40
.
QUESTION 42
.
Decision-making units are likely to vary over the product life cycle
True
QUESTION 43
.
QUESTION 44
.
QUESTION 45
.
QUESTION 46
.
QUESTION 47
.
1 points
QUESTION 49
.
QUESTION 52
.
The center of gravity method to determine facility location looks only distance
travelled
False
QUESTION 53
.
QUESTION 54
.
QUESTION 55
.
QUESTION 56
.
QUESTION 58
.
For products in introduction stage of the product life cycle the engineering and
R&D likely to be key functions influencing the purchase decision.
True
QUESTION 59
.
QUESTION 60
.
QUESTION 62
.
QUESTION 63
.
QUESTION 1
.
A plant has an annual fixed cost of Rs. 1, 00,000 and a variable cost of Rs.
2000. If the product can be sold for Rs 3000, the breakeven quantity is
100
QUESTION 2
.
Wastivity is
Inversely proportional to Productivity
QUESTION 4
.
QUESTION 5
.
Productivity and efficiency are different names for the same thing.
False
QUESTION 6
.
People who work in the field of operations should have skills that include both
knowledge and people skills.
True
QUESTION 7
.
Operations, marketing, and finance function independently of each other in
most organizations
False
QUESTION 8
.
QUESTION 9
.
QUESTION 10
.
QUESTION 11
.
QUESTION 12
.
QUESTION 13
.
QUESTION 14
.
QUESTION 15
.
QUESTION 16
.
QUESTION 17
.
QUESTION 19
.
Microsoft is a company that has derived a great deal of success from leading
change, and other computer-related companies look to Microsoft for cues as
to where technology will be heading in the future. Then Microsoft would be
classified as supportive firm user reference group.
True
QUESTION 20
.
QUESTION 21
.
QUESTION 22
.
QUESTION 23
.
QUESTION 24
.
QUESTION 25
.
The term robust design refers to a product that has exceptional strength.
False
QUESTION 27
.
Moving average method considers all past demands
False
QUESTION 28
.
QUESTION 29
.
The Uniform Commercial Code specified that a product must be suitable for
its intended purpose.
True
QUESTION 30
.
IS mark is for system quality
False
QUESTION 31
.
QUESTION 32
.
If value of input is more than the value of output, it is a value adding process
False
QUESTION 33
.
QUESTION 34
.
In the maximin principle, the substitute with the best out of the worst payoffs is
selected
True
QUESTION 35
.
For new products in a strong growth mode, a low alpha will minimize forecast
errors when using exponential smoothing techniques.
False
QUESTION 36
.
QUESTION 37
.
Robustness of a product is _____________ related with the probability of failure
Inversely
QUESTION 38
.
Incoming inspection
QUESTION 39(DOUBT)
.
QUESTION 40
.
QUESTION 41
.
QUESTION 42
.
Purchase involves
.
QUESTION 43
.
Orders are processed in the sequence in which they arrive if (the) ~*~ rule
sequences the jobs.
first come, first serve
QUESTION 45
.
QUESTION 47
.
QUESTION 48
.
QUESTION 49
.
According to the text, the most common choice for limits for control charts is
usually
±3 standard deviations
QUESTION 50
.
The ______ is the input to Materials Requirements Planning which lists the
assemblies, subassemblies, parts and raw materials needed to produce one
unit of finished product.
.
bill of materials
QUESTION 51
.
A company wants to determine its reorder point (R). Demand is variable and they want to build a safety stock into R. If the
average daily demand is 12, the lead time is 5 days, the desired “z” value is 1.96, and the standard deviation of usage during
lead time is 3, which of the following is the desired value of R?
66
QUESTION 52
.
QUESTION 53
.
QUESTION 54
.
Decentralization of power
QUESTION 55
.
A manufacturer uses statistical process control to control the quality of the firm's products. Samples of 50 of Product A are
taken, and a defective/acceptable decision is made on each unit sampled. For Product B,the number of flaws per unit is
counted. What type(s) of control charts should be used?
p-chart for A, c-chart for B
QUESTION 56
.
C chart or Np chart
4. Product design is a
- Strategic decision
5. A scheduling technique used to achieve optimum, one-to-one matching of tasks and
resources is
- the assignment method
8. TQM is applicable to
- All above
— TQM is considered a customer-focused process and aims for continual
improvement of business operations. It strives to ensure all associated employees
work toward the common goals of improving product or service quality, as well as
improving the procedures that are in place for production
11. Assuming no safety stock, what is the re-order point (R) given an average daily
demand of 50 units, a lead time of 10 days and 625 units on hand?
-500
12. Using the ABC classification system for inventory, which of the following is a true
statement?
- The "A" items are of high dollar volume
The ABC classification scheme divides inventory items into three groupings: high dollar volume
(A), moderate dollar volume (B), and low dollar volume (C).
14. Which one of the following descriptions best defines the cycle-service level as a
measure of customer service?
- The desired probability of not running out of stock in any one inventory cycle
17. If a sample of items is measured and the mean of the sample is outside the control
limits the process is
- out of control and the cause can be established
20. The material productivity of a production system is 2.5 Kg steel per unit of product.
Total steel consumed on a particular day is 250 Kg. if the system is designed
to produce 200 units in a day, the efficiency of the system is
-0.5
21. The collective learning in the organization, especially how to coordinate diverse
production skills and integrate multiple streams of technologies, is called
- core competency.
22. Completion of any operations depends upon the slowest process in the assembly
line. What operations managers need to do in order to be successful?
- Target and eliminate bottlenecks
23. Which of the following shows the quality and timing of specific end items for a
scheduled horizon?
- Master Planning
26. According to the Pareto principle, a relatively few factors are very important in
achieving an objective or solving a problem.
- True
30. The mission of a firm should be designed to support the firm's overall strategy.
-False
31. The use of models will guarantee the best possible decisions
- False
Models are useful, but their use does not guarantee the best decision
32. Bob is an engineer. So for introduction stage of the product life cycle he is likely to be a
member of a key function influencing purchase decisions.
- False
37. A document describing quantity of end items to be produced within specified periods of
time is called MPS
- True
41. Based on his 14 Points, Deming is a strong proponent of looking for the cheapest
supplier.
- False
Based on his 14 Points, Deming is a strong proponent of training and knowledge
43. The Delphi approach involves the use of a series of questionnaires to achieve a
consensus forecast.
- True
45. Smoothing coefficient is low for new products for which demand is shifting
- True
48. Correlation measures the strength and direction of a relationship between variables
- True
51. An organization that is twice as productive as its competitor will be twice as profitable.
- False
52. A supply chain is a sequence of organizations that are involved in producing goods and/or
producing services
- True
54. The principal activity in all production operations is to convert inputs into outputs that
satisfy consumer wants.
- True
60. In most acceptance sampling plans, when a lot is rejected, the entire lot is inspected and
all defective items are replaced. When using this technique the AOQ is not affected, but the
AQL is improved.
- False
improves (AOQ becomes a smaller fraction
62. Power, prestige, security, and similar noneconomic criteria have no role in business
purchase decisions.
- False
1. Which file contains important information regarding an item's flow through the
shop?
- routing file
5. Basic research, applied research and development are all part of the product life
cycle.
- False
9. Site visits to potential vendors, laboratory tests of a new product, and investigation
of possible product specifications are part of formal information search.
- True
14. If the average number of defects is 9, the lower control limit in a c chart is 3
- False
Number of defects per unit c = Σc / Σn = Σc / m.
Upper control limit (UCL) = c + 3√c.
Lower control limit (LCL) = c – 3√c.
15. Maria is a pharmaceutical sales representative that calls on hospitals. She is taking
on a new territory, and she is trying to learn the internal influences on each
hospital's culture. Then she should consider lead users with respect to internal
influences.
- True
16. Limited rebuy is the approach used in an organizational buying situation when the
purchase is moderately important to the firm or the choice is somewhat complex.
- False
p control chart
The p control chart is used to determine if
the fraction of defective items in a group of items is consistent over
time. A product or service is defective if it fails to conform to
specifications or a standard in some respect.
Services are intangible because they can often not be seen, tasted, felt, heard, or
smelled before they are purchased. ... Services are inseparable from their production
because they are typically produced and consumed simultaneously.
24. The product of achievable capacity and efficiency is called maximum capacity
- False
32. In exponential smoothing, an alpha of 1.0 will generate the same forecast that a
naïve forecast would yield.
-True
35. The greater the degree of customer involvement, the more challenging the design
and management of operations.
- True
36. If a sample of parts is measured and the mean of the measurements is outside the
control limits the process is out of control and the process should be investigated
for assignable variation.
- False
If a sample of parts is measured and the mean of the sample measurements is
outside the control limits
Your the process is out of control and the cause can be established
Answer:
42 Purchase involves
- Placing purchase order
43. The fundamental purpose for the existence of any organization is described by its:
*- Mission
44. Use of the sequencing rule Shortest Processing Time generally results in
- minimum average flow time
45. The mean absolute deviation (MAD) is used to:
- measure forecast accuracy
46. Which of the following dispatching rules tends to minimize job flow time?
- SPT: shortest processing time
47.
Which of the following lot-sizing-techniques results in the lowest holding costs?
- lot-for-lot
48. Moving from the aggregate plan to a master production schedule requires
Disaggregation
49. Up to three points above or below centerline is the amount of variation that statistical
process control allows for
- natural variation
50. A persistent tendency for forecasts to be greater than or less than the actual values is
called:
- bias
51. A set of simultaneous equations that has more variables than constraints has
- an infinite number of solution
54. Given forecast errors of 4, 8, and - 3, what is the mean absolute deviation?
-5
56. Control charts for variables are based on data that comes from
- average of small samples.