0% found this document useful (0 votes)
67 views21 pages

Wiring Diagram

The document appears to be an engineering document consisting of 18 pages describing various systems and components. It includes tables listing symbols, keys, descriptions and types. It also includes schematic diagrams and drawings of pumps, boilers, storage tanks and other mechanical and electrical equipment. Page headers provide information about the date, project name, title, item name and sheet number.

Uploaded by

kikokiko Karim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views21 pages

Wiring Diagram

The document appears to be an engineering document consisting of 18 pages describing various systems and components. It includes tables listing symbols, keys, descriptions and types. It also includes schematic diagrams and drawings of pumps, boilers, storage tanks and other mechanical and electrical equipment. Page headers provide information about the date, project name, title, item name and sheet number.

Uploaded by

kikokiko Karim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21

No. SYMBOL KEY DESCRIPTION TYPE No.

SYMBOL KEY DESCRIPTION TYPE

Cabur

Emas

Emas

Emas

Emas

Emas

Emas

ABB

ABB

ENTES

ENTES

ABB

Hobut

ENTES

Hobut

03 Date: Project name: Tittle: Item Name:


PART LIST Sheet: L
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: --- Year 2021
REV. Date Name
Date: Project name: Tittle: Item Name: Sheet: 1
Prepared: Project name: Item no: Item Name:
Order no.: Drawing no.: Total Sheets:
Checked: Approved: Year 2021 Item no:
Name
03 Date: Project name: Tittle: Item Name:
MEASURING Sheet: 2
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: --- Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Item Name:
INSTRUMENTAL& ACTUATORS Sheet: 3
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: 0118 Year 2021 Total Sheets:
REV. Date Name
Date: Project name: Tittle: Item Name: Sheet : 4
Prepared: Item no:
Order no.: Drawing no.: Total Sheets:
Checked: Approved: --- Year 2021
Name
03 Date: Project name: Tittle: Item Name: Sheet: 5
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Item Name: Sheet: 6
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: Year 2021 Total Sheets:
REV. Date Name Mohamed Besher
03 Date: Project name: Tittle: Item Name: Sheet: 7
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Item Name: Sheet: 8
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Item Name: Sheet: 9
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: Year 2021 Total Sheets:
REV. Date Name
3PUMPS (1 IN DUTY & 2 IN STANDBY)
03 Date: Project name: Tittle: Primary pumps Item Name:
INTEGRATION CONTROL Item no: Sheet: 10
02 Prepared:
01 Order no.: Drawing no.:
Checked: Approved: Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Primary pumps power Item Name: Sheet: 11
02 Prepared: STORAGE CALORIFIERES Item no:
01 Order no.: Drawing no.:
Checked: Approved: Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Primary pumps power Item Name: Sheet: 12
02 Prepared: STORAGE CALORIFIERES Item no:
01 Order no.: Drawing no.:
Checked: Approved: Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Primary pump 1 Item Name: Sheet: 13
02 Prepared: Y/D CONTROL Item no:
01 Order no.: Drawing no.:
Checked: Approved: Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Primary pump 2 Item Name: Sheet: 14
02 Prepared: Y/D CONTROL Item no:
01 Order no.: Drawing no.:
Checked: Approved: Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Primary pump 3 Item Name: Sheet: 15
02 Prepared: Y/D CONTROL Item no:
01 Order no.: Drawing no.:
Checked: Approved: Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Item Name:
H.W BOILERS Sheet: 16
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: --- Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Item Name:
H.W BOILERS TRIPS Sheet: 17
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: --- Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Item Name:
STEAM BOILERS Sheet: 18
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: --- Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Item Name:
STEAM BOILERS TRIPS Sheet: 19
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: --- Year 2021 Total Sheets:
REV. Date Name
03 Date: Project name: Tittle: Item Name:
STEAM UTILITIES Sheet: 20
02 Prepared: Item no:
01 Order no.: Drawing no.:
Checked: Approved: 0118 Year 2021 Total Sheets:
REV. Date Name

You might also like