Choky Donal H. Nasution


Current Position FOM- Field Operation Manager

Birth Date/Place/ January 23, 1971 / Pekanbaru, Indonesia

Marital Status/Religious Married / Christian.

Nationality Indonesia
P & A and De-commissioning experience
Geothermal & ERD
Project brief Campion for the first SMR-D Platform De-commissioning at Petronas Carigali, Malaysia
(offshore). 2 Exploration well at PetroChina Salawati, offshore (dry hole, mud line
suspension).
GEOTHERMAL EXPERIENCE

As Field Engineer, Sr. Drilling Supervisor and FOM-Field Ops. Manager, with Halliburton at
SOL-Sarula Ops.Ltd, Unocal Geothermal (Sarulla field), Patuha Energy (Java), Bali Energy
(Bali). Operation: Air Drilling system (foam & Aerated system, UBD-under balance drill,
multiple side track well, total loss formation (poor consolidated), RCD, corrosion and H2S
hazards.
Tiaka North ERD-Extended Reach Drilling (onshore remote)

Tiaka North wells will be drilled directionally using Rotary Steerable System (RSS) which
will have a near horizontal or high deviated wellbore ranging from 68° to 83° inclination. The
total distance of this well will be about 3.3 to 3.6 Km. The longest reach well was Tiaka-13
that has ratio of 2.11.

Work Summary 19 years industry experiences in managing Oil & Gas and Geothermal drilling
operation and engineering. Extensive exposure to well service/well intervention,
work over, drilling both on shore and offshore operation. All rounded & quantify
track record safety leadership & operation supervisory.
 Drilling activities: Oil & Gas Operation and Geothermal, both offshore and onshore,
Description Specialties Exploration, Appraisal, and Development well; Directional Drilling, Drilling Fluids
& Cement Op. Design /Operation.
 Completion Activities: Completion, well intervention, well services activity and
work over operation, Well Testing (Oil), Well Testing (Gas), Gravel Pack, Dual
Completion, Perforating, Swell Packer, Liner Hanger, Compact well head, RSS;
Power Drive; UBD-under balance drilling; Air Drilling; HPHT.
 Deliver drilling & work over program, AFE & WP&B for oil & gas development
wells; Well Completion Reports/ Final Well Report, FDP-Field Development Plan.
 Monitors daily drilling operations and provides technical and engineering support to
drilling operations.
 Evaluates new drilling technology & SOP to reduce cost and increase drilling
efficiently.
 Assists in the training and coaching of new engineers.
 Certified in several international safety regulation requirements, such as: Well
Control (IWCF & IADC), Sea Survival, HUET (Helicopter Under water Escape),

CV-Choky_2015-11-02.FOM. Page 1
ABS (Apparatus Breathing System), Defensive Safety Driving, STOP program,
IMO (Int. Marine Organization) Level-2 for Oil Spill Prevention, & Fire Fighting.
 Knowledge drilling software tools: Halliburton Landmark (DIMS, Compass, Stress
Check, Open Well & Well plan); Well File (PELETON).
 WO-Rigless: Simultaneous Drilling, Completion job, Well Stimulation (Acid,
Fracturing, /Gravel Pack Jobs, etc), CT- coiled tubing milling-drilling, UB (under
balance) CT.
 Design & Eng., Completion, SIMOP-Simultaneous Operation, Wellbore
Stability/Sand Production/Prediction &Control.

Experience March 2014 – Present IPM Halliburton Project Management.

Sr. DSV and been promote to FOM-Field Operation Manager Geothermal


 Manage field operation of 4 Onshore Rig, 1500 HP, project cost USD 300 M, 36 wells
 HT well, RCD, Air Drilling.

Sep 2013 – Feb. 2014 JOB (Joint Operating Body) Pertamina- PetroChina Salawati
Senior Drilling Supervisor  PROJECT COMPLETED
 Supervise operation Offshore Rig, Jack Up Bohai-8 (CSOL Drilling), 1500 HP, USD 40M
project.
 2 exploration wells at Salawati field, Papua, Indonesia, directional S-type well, oil
objective, Kais carbonate formation, drilling & well testing with ESP, coring, CTU-coil
tubing, Acid stimulation, Coring, VSP-seismic while drilling, P&A with MLH- mud line
hanger (mud line suspension)

April 2012 – 20 Sept. 2013 JOB (Joint Operating Body) Pertamina-Medco E&P, Indonesia
Drilling Superintendent  PROJECT COMPLETED
 Supervise operation IPM- integrated project management by PT.APS, Onshore Rig, 2000
HP, Skid type, batch drilling, Cyber Rig, SIMOP-simultaneous operation, US$ 90 M
project.
 Supervise 3 ERD well (Extended Reach Drilling) up to 17,000 ft MD, SOBM (Synthetic
Oil Base) mud system, 3D Directional with RSS & mud motor, Batch Drilling, combine
onshore and offshore operation, CTU-coil tubing, Acid stimulation, Well Testing, in
Tomori carbonate formation.

April 2007 – Mar 2012 Petronas Carigali Sdn. Bhd.Kuala Lumpur, Malaysia
Lead Engineer Work Over/ Intervention; Sep. 2011 – Mar 2012  CONTRACT COMPLETED
 Daily Monitoring and coordination with 3 regional (Peninsula Malaysia, Sabah and
Sarawak) for Rig-less operation, with 7 Coiled Tubing Unit, 34 Slick line Unit, 4 E-line.
 Report to GM Well Delivery Intervention for Rigless operation and SM Work Over.
Utilized HWU-Hydraulic Snubbing Unit, Gait-2&3.
 Lead 5 engineers for design & execute work over program. Acting Drilling Superintendent
 Campion for the first SMR-D Platform De-commissioning at Petronas Carigali, Malaysia
(offshore).

Senior Drilling Engineer; April 2009 – Aug.2011


 Technology Scouting), SQM-service quality monitor.
 Support CBD-Corporate Business Development to asses & analysis of acquisition-farm
in-farm out-direct negotiation opportunities. Successes to bring in Oman block-6, Natih,
on 2007 Oman Bid Round campaign & Farm in Blok-402 &403, Total Australia in
2009.

Senior Drilling Engineer; April 2007 – April.2009


 Seconded to KPOC (JV of Shell, ConocoPhillips & Petronas); prepare Offset Well
Data, bit analysis, geo-mechanic, DRC-drilling review presentation.
 Designing well and details of drilling program for a well construction project (onshore &
offshore) including all technical/engineering plan, cost estimation, material purchase plan
and drilling equipment (Well Construction Program)

CV-Choky_2015-11-02.FOM. Page 2
Nov. 2006- Mar.2007 VICO (JV BP & ENI). Indonesia
Contract Custodian (Consultant)
 Deliver pre-award contract, development, evaluation, and negotiation; and/or post award
contract management/administration.
 Manage post-award activities including change order management and cost control.
 Interface with project team, procurement, attorneys, business partners, and contractors.

Oct. 2004- Oct.2006 CNOOC SES Ltd. South Sumatra, Indonesia


Night Drilling Supervisor & Work Over (WO) Supervisor CONTRACT COMPLETED
 1 year as NDSV @ Bohai-4 jack up: Drill & Completion: 12 wells/ year.
 1 year as WO-work over Supervisor @ Toba Barge: Stimulation, ESP Pump Repair, Work
Over, Fracturing, Fishing, ESS-Expendable Sand Screen, etc.
 Drilling Ops: Development & Exploration well, Drill Directional well, Completion

Dec. 2003- Sept. 2004 Amerada Hess Indonesia Ltd. Surabaya, Indonesia
Night Drilling Supervisor (Consultant)  PROJECT COMPLETED
 Night Drilling Supervisor for Jack up Drilling Rig, Sovereign, Offshore Field.
 Drilled 3 Appraisal well, oil & gas, casing drilling, Directional, Well Testing.
 Report to Senior Drilling Supervisor.

May 2003- Dec.2003 JOB Pertamina-Pearl Oil Jambi Jambi, Sumatera.


Drilling Superintendent (Employee).
 Supervise Drilling-Completion (1500HP rig) and 3 Work Over Rig (250HP to 550HP) at
Onshore Field, Jambi, Sumatra.
 Drilled 8 oil wells development, directional, ESP & suckers rod completion.
 Report to Field Operation Superintendent & Drilling Manager.

Nov. 2002- May 2003 Caltex Pacific Indonesia (Chevron) Riau, Sumatera
Drilling Site Manager (Company Man Consultant)
 Supervise & Drilled 20 wells, onshore, mobile drill rig, at Duri Steam Flood.
 Report to Drilling Team Manager. Mature field, drilling through loss circulation zone.
 Operation: Vertical drill, gravel pack, Sucker Rod completion, 500ft &700ft.

Feb. 2002- June 2002 Maxus YPF Repsol SES, BV(CNOOC SES, BV) Jakarta
Work Over Supervisor (Company Man Consultant)  CONTRACT COMPLETED
 Supervise operation at Offshore Field (Work Over Barge/TAD-tender assist. drill. barge)
 Report to Work Over Superintendent.
 Operation: ESP Installation, Pump Repair, Work Over, mini fracturing, etc.

June. 1999– Jan. 2002 BP Indonesia (ARCO Indonesia) Jakarta


Well Service Eng/Supervisor / Wireline Supervisor (Company Man), Nov.2000-Jan.2002
 Make procedure and Cost Estimate for Well Service Job. Report to Well Service Manager.
 Supervise Coiled Tubing & Wireline operation, offshore, use Jack up.
 Operation: Simulation, Gas Lift installation, Sand Clean out, CT- coilded tubing milling-
drilling, UB CT.

Procurement Specialist and Formalities Specialist, June 1999- Nov. 2000


 Manage and deliver export import Master List of Category I and II
 Maintain a good relation with Government (Custom, Migas, Pertamina)
 Vendor assessment, CSMS , RFQ-request for quotation, Oracle software, MR-material
request, negotiation and monitoring deliveries

1997–1998 Halliburton Indonesia Jakarta


Field Engineer
 Design Cementing Program & Organize Cementing Job

CV-Choky_2015-11-02.FOM. Page 3
 Cement job at Oil & Gas and Geothermal well (Sarulla, Bali Energy, Patuha Geothermal)
 Research for new cement with Unocal Geothermal (Sarulla field).
 Air Drilling system, (foam), Aerated system, multiple side track well, total loss formation,
corrosion environment and H2S hazards.

Education 1989–1997 ST (Bachelor Eng. degree with Honor), major in Petroleum


Engineering; University UPN ”Veteran” Yogyakarta.

SPE Society of Petroleum Engineering


Professional Member FESM Formation Evaluation Society of Malaysia, a Chapter of SPWLA
KLEX Kuala Lumpur Exploration
IATMI Indonesian Oil & Gas expert.

1998 Stimulation &Cementing 1, Halliburton Jakarta


Certificate 1999 Negotiation Skill, AT Kearney Jakarta
2000 Export Import Course, LM Patra Jakarta
2001 ISO 14001 Course (PT. Surveyor Ind.) Jakarta
2001 Advanced Safety Audit (BP Ind.) Jakarta
2001 Traction Course, Track Action Report ( BP) Jakarta
2001 STOP Program for Supervisor (BP) Jakarta
2001 Wireline Basic Course (Welltekindo) Cibarusah
2001 Well Control Training by IADC & IDS Jakarta
2001 Gas Lift Course (Weatherford) Jakarta
2001 First Aid and CPR Course (BP) Jakarta
2002 DIMS Course, Landmark (YPF Maxus) Jakarta
2002 AP-3 (Tool pusher Land Rig),MIGAS Cepu
2003 Defensive Drive Course, CALTEX Riau
2004 Fire Fighting, OPITO standard Jakarta
2005 H2S, Rutledge Jakarta
2005 Sea Survival, Sampson Tiara Merak
2005 Well Control, IWCF, Fritmandiri Jakarta
2006 DNV Course, DNV & CNOOC Jakarta
2006 QHSE Workshop, CNOOC Merak
2006 IMO (Int. Marine Ops.)Level 2, EARL Jakarta
2007 HUET, ALAM Academy, Melaka Malaysia
2007 Emergency Breathing System, MAS Kuala Lumpur
2007 Landmark Software: Compas, Open Well Kuala Lumpur
2008 Bit School, Hughes & Petronas Kuala Lumpur
2008 Landmark Integrated Drilling Plan, Shell Miri, Malaysia
2012 T-BOSIET (Tropical HUET), Sampson Merak, Indonesia
2013 IADC, well control, Trikona Jakarta, Indonesia