Calculation of Discharge by Catchment Area Method

This document calculates the discharge at a bridge site using three different methods and selects the design discharge. It also calculates scour at the bridge site. The key points are: 1. Discharge is calculated as 141.82 cumecs using the area-velocity method, 43.68 cumecs using the catchment area formula, and 95.17 cumecs using the runoff method. 2. The highest discharge of 141.82 cumecs is selected as the design discharge. 3. Scour is then calculated based on this design discharge value, the highest flood level, effective waterway, and weighted mean particle diameter.

Uploaded by

Er navneet jassi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views5 pages

Calculation of Discharge by Catchment Area Method

This document calculates the discharge at a bridge site using three different methods and selects the design discharge. It also calculates scour at the bridge site. The key points are: 1. Discharge is calculated as 141.82 cumecs using the area-velocity method, 43.68 cumecs using the catchment area formula, and 95.17 cumecs using the runoff method. 2. The highest discharge of 141.82 cumecs is selected as the design discharge. 3. Scour is then calculated based on this design discharge value, the highest flood level, effective waterway, and weighted mean particle diameter.

Uploaded by

Er navneet jassi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

CALCULATION OF DISCHARGE BY CATCHMENT AREA METHOD

(3/4)
Discharge,Q= C.M
Where,
C= Catchment area constant [as section 4.2 of IRC:SP:13-2004] = 12
M=Catchment area[in SQ.KM.] From topo sheet = 5.6

Discharge[Cumecs] = 43.68

CALCULATION OF DISCHARGE BY runoff method METHOD


Discharge calculation by runoff method requires the data from topo sheet

maximum rainfall[appendix -A of IRC:SP-13,2004) I0 mm/hour 78

fall in level from the critical point to the bridge site, H meter 18

distance from the critical point to bridge site, L Kilo meter 3.1

time of concentration

tc hour [0.87X{L3/H}(0.385)] 1.056

Critical intensity of rainfall

Ic = I0{2/(tc+1)} mm/hour 75.867


7.587
Discharge = [0.028*P*f*Ic] Cumecs

P=Percentage co-efficient of runoff for the catchment 0.8

f=factor considering the likely spread of the storm in


in relation to the catchment area[fig.4.2 of IRC:SP
:13-2004] 1

Discharge = [0.028*P*f*A*Ic] Cumecs 95.167159


UP STREAM
CALCULATION OF DISCHARGE BY AREA VELOCITY METHOD
Highest flood level [HFL] = 594.028

Bed slope = 0.008167

Rugosity coefficient
= 0.045
[as per table 5.1 of IRC SP:13:2004]

CROSS SECTION AT UPSTREAM

2
distance bed level(m) HFL[M] height(m) Horiz.dist. Diff. of bed level C/S area(m ) Perimeter[m]
HFL-Bed Level
0 594.028 594.028 0.00
5 593.860 594.028 0.17 5 0.17 0.42 5.003
10 591.300 594.028 2.73 5 2.56 7.24 5.618
15 589.600 594.028 4.43 5 1.70 17.89 5.282
20 591.071 594.028 2.96 5 1.47 18.4625 5.212
25 594.028 594.028 0.00 5 2.96 7.3925 5.809
30 594.028 594.028 0.00 5 0.00 0 5

51.405 31.924

Cross-sectional area 51.41 sqm


Wetted perimeter 31.92 meter
Hydraullic mean depth[A/P] 1.61 meter
Velocity,V=[(1/n)*(R(2/3)*S(1/2)] 2.76 meter/sec
n=Rugosity co-efficient 0.045
S=Bed slope 0.00817
DISCHARGE,[Q=A*V] 141.82 cumecs
DOWN STREAM
CALCULATION OF DISCHARGE BY AREA VELOCITY METHOD
Highest flood level [HFL] = 589.128

Bed slope = 0.008167

Rugosity coefficient
= 0.045
[as per table 5.1 of IRC SP:13:2004]

CROSS SECTION AT DOWNSTREAM

2
distance bed level(m) HFL[M] height(m) Horiz.dist. Diff. of bed level C/S area(m ) Perimeter[m]
HFL-Bed Level
0 589.128 589.128 0.00
5 588.860 589.128 0.27 5 0.27 0.67 5.0
10 587.300 589.128 1.83 5 1.56 5.24 5.2
15 584.700 589.128 4.43 5 2.60 15.64 5.6
20 586.271 589.128 2.86 5 1.57 18.2125 5.2
25 588.328 589.128 0.80 5 2.06 9.1425 5.4
30 589.128 589.128 0.00 5 0.80 2 5.1

50.905 31.6

Cross-sectional area 50.91 sqm


Wetted perimeter 31.59 meter
Hydraullic mean depth[A/P] 1.61 meter
Velocity,V=[(1/n)*(R(2/3)*S(1/2)] 2.76 meter/sec
n=Rugosity co-efficient 0.045
S=Bed slope 0.0082
DISCHARGE,[Q=A*V] 140.50 cumecs
BRIDGE SITE
CALCULATION OF DISCHARGE BY AREA VELOCITY METHOD
Highest flood level [HFL] = 591.578

Bed slope = 0.00817

Rugosity coefficient
= 0.045
[as per table 5.1 of IRC SP:13:2004]

CROSS SECTION AT BRIDGE SITE

Diff. of bed
distance bed level(m) HFL[M] height(m) Horiz.dist. level C/S area(m2) Perimeter[m]
HFL-Bed Level
0 591.578 591.578 0.00
5 590.86 591.578 0.72 5 0.72 1.795 5.05
10 589.300 591.578 2.28 5 1.56 7.49 5.24
15 588.100 591.578 3.48 5 1.20 14.39 5.14
20 588.071 591.578 3.51 5 0.03 17.4625 5.00
25 591.578 591.578 0.00 5 3.51 8.7675 6.11
30 591.578 591.578 0.00 5 0.00 0 5.00

49.905 31.54

Cross-sectional area 49.91 sqm


Wetted perimeter 31.54 meter
Hydraullic mean depth[A/P] 1.58 meter
Velocity,V=[(1/n)*(R(2/3)*S(1/2)] 2.73 meter/sec
n=Rugosity co-efficient 0.05
S=Bed slope 0.00817
DISCHARGE,[Q=A*V] 136.09 cumecs
S.NO. METHOD DISCHARGE

1 Area velocity method 141.821 cumecs


2 Catchment area formula 43.684 cumecs
HAZARIBAGH,
3 Runoff method 95.167 cumecs TANDWA , 4th KM
Highest discharge,[Q1] 141.821 cumecs
Next highest discharge[Q2] 95.167 cumecs 1.5xQ2 142.7507
If Q1 is less than 1.5 Q2 ,then desgin discharge will be Q1, otherwise desgin discharge
will be 1.5 *Q2
In this case
Q1 is less than 1.5 *Q2,and hence the desgin discharge will be Q1

DESGIN DISCHARGE WILL BE 141.821 Cumecs

CALCULATION OF SCOUR

HFL 591.578 METER


Desgin discharge 141.821 cumecs
Desgin discharge for foundation desgin[1.3*desgin disch.] 184.367 cumecs
Effective linear waterway provided 26.25 meter
Discharge per meter waterway provided,Db [184.367/26.25] 7.023505 Cum/sec/meter
Weighted mean dia of particle in mm 0.51 mm
Silt factor,Ksf=[1.76*Ѵdm] 1.256891
Mean scour depth,[dsm=[1.34*(Db2/Ksf)(1/3)] 4.554 meter
Scour depth for pier-[2*dsm] [2*4.554] 9.108 meter
Scour depth for abutment,[1.27*dsm] [1.27*4.554] 5.78 meter
Scour level for pier,
Non seismic case [HFL-9.108] 582.47 meter
Seismic case

Scour level for abutment


Non seismic case [HFL-5.78] 585.798 meter

CALCULATION OF AFFLUX
Average bed level within the proposed bridge length 589.872 meter
Effective linear waterway provided 26.25 meter
Obstructed sectional area,a [591.578-589.872142857143]*[26.25] 45.27875 sqm
Un -obstructed sectional area,A= 49.905 sqm
H= afflux in m= (V2/17.88 + 0.015)((A/a)^2-1) 0.093 meter
Affluxed HFL [591.578+0.0925527048612222] 591.671 meter
Vertical clearance 0.9 meter
Thickness of wearing course 0.065 meter
Height of superstructure 0.7 meter
Formation level [591.671+0.9+0.065+0.7] 593.336 meter
In order to match road Profile SAY 595.000