0% found this document useful (0 votes)
233 views3 pages

Final Project Charter

The document outlines the steps for a project to solve connectivity challenges using machine learning techniques. It describes 7 steps: understanding the problem statement, preparing a project charter, data understanding, data preparation using dummy data, applying modeling techniques like route optimization and network analytics, evaluating results on real client data, and deploying the models using Python or R. It also includes a timeline showing the status of each step.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
233 views3 pages

Final Project Charter

The document outlines the steps for a project to solve connectivity challenges using machine learning techniques. It describes 7 steps: understanding the problem statement, preparing a project charter, data understanding, data preparation using dummy data, applying modeling techniques like route optimization and network analytics, evaluating results on real client data, and deploying the models using Python or R. It also includes a timeline showing the status of each step.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Sl.

No Steps Followed Description

1 Understanding the Problem Prepare various PPTs and docs on the Business problem
Statement understanding and share it with the team

2 Prepare Project charter 1.Goals and Objectives


2.Project Deliverables
3.Deliverables Out of Scope
4.Project Duration

3 Data Understanding 1.Received idea on data dictionary from Mr.Jameel


2.Discussed the Possible features to be included as part of
the feature set and the ML techniques to be applied.
3. Prepared PPTs on challenges on Last Mile
Connectivity(LMC), flow chart on LMC, Steps invloved in
Project Life cycle of LMC.
4. Understood the Business problem and possible steps for
solutions using various ML techniques

4 Data Preparation Prepare the initial set of data set using dummy data from
internet

5 Modeling 1.Apply ML modeling techniques such as Route


Optimization, Network Analytics, etc
2. Model Selection and Fitment
3.Using Python, R and SQL( if required)

6 Evaluation 1. Evaluate Results and test it with Real data from the
Client.
2. Evaluate with the Stake holders and approval
7 Deployment Using Python Flask or Rshiny
Nov '20 Dec '20 Jan '21 Feb '21 Status

20th-Nov to 5th Completed


Dec

20th-Nov to 5th Completed


Dec

5th Dec- 20th Dec Completed

5th Dec- 20th Dec 20th Dec- 5th Jan Completed

5th Jan- 20th Jan 20th Jan- 5th Feb Completed

5th Feb - 28th Feb Yet to start

5th Feb - 28th Feb Yet to start


Validated by Comments Team Members
Innodatatics(Y/N) contributed

Need more
clarity on the
final data set

You might also like