0% found this document useful (0 votes)
39 views2 pages

Project Objective

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views2 pages

Project Objective

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Project 1

Objective: Maximize the on-time delivery.


Constraint: Without increasing cost.
Inferences on the objective

Supplier

Supply
chain
Consumer Distributor

o Delivery is the last part of supply chain.


o Supply chain is a continuous process.
o The suppliers distribute the products on the demand of consumers.
o Hence called as supply on demand.
o coming to the objective, to maximize the on-time delivery.
o It is the whole story between the distributor and the consumer.

Ideas for attaining the objective

Clustering the delivery points would provide us a better understanding about the maximum delivery
area on the basis of Betweeness, Closeness, Centrality, Page rank of the data and also

Network Analytics would provide information about the connections amongst store and door.

Each pc and mobile is to be considered as a consumer .

Expected methods for the solution:

1.Clustering.

2.Network analytics.

You might also like