Fire Fighting Pipe Calculation
Fire Fighting Pipe Calculation
Fire Fighting Pipe Calculation
3PFLOOR
RESIDENCE
AREA 100 MM 100Nos 48 NOS 100 MM 100 MM OK
3PFLOOR
PART-1 40NOS 19 NOS 65 MM 65 MM OK
3PFLOOR
PART-2 40NOS 29 NOS 80 MM, 80 MM OK
3P CAR PARK LOOP
AREA 150 MM 275 NOS 268 NOS 150 MM 150 MM PROVIDED
2PFLOOR
RESIDENCE
AREA 100 MM 100Nos 48 NOS 100 MM 100 MM OK
2PFLOOR
PART-1 40NOS 19 NOS 65 MM 65 MM OK
2PFLOOR
PART-2 40NOS 29 NOS 80 MM, 80 MM OK
2P CAR PARK LOOP
AREA 150 MM 275 NOS 268 NOS 150 MM 150 MM PROVIDED
1PFLOOR
RESIDENCE
AREA 100 MM 100Nos 48 NOS 100 MM 100 MM OK
1PFLOOR
PART-1 40NOS 19 NOS 65 MM 65 MM OK
1PFLOOR
PART-2 40NOS 29 NOS 80 MM, 80 MM OK
1P CAR PARK LOOP
AREA 150 MM 275 NOS 268 NOS 150 MM 150 MM PROVIDED
GROUND
FLOOR
G F ZCV-1 100 MM 100 NOS 82 NOS 100 MM 100 MM OK
LOOP
G F ZCV-2 150 MM 275 NOS 272 NOS 150 MM 150 MM PROVIDED