CEST-SBCE CEB805 Design of Bridges 1


Meet the Lecturer
Maika Tuicakau
• Part-Time Lecturer
• Civil and Structural Engineering
• School of Building & Civil Engineering
College of Engineering Science and Technology
Email: [email protected]

CEST-SBCE CEB805 Design of Bridges 2


Learning Objectives
• Understand the principles and theories of design of bridges
using AS5100 and other related Bridge Design Standards
(BS5400, EUROCODE, American Standards).
• Prerequisite : CEB706, Design of Reinforced and Pre-Cast
Concrete Structures. ( Design & Analysis of Timber and Steel
Structures – CEB607, Structural Analysis 1 – CEB604).

CEST-SBCE CEB805 Design of Bridges 3


FNU - Course Outline
• Module 1 – Bridge Engineering (an Overview)
• Module 2 – Short Span Bridges
• Module 3 – Long Span Bridges
• Module 4 – Pre-stressed Concrete Bridges
• Module 5 – Steel Bridges
• Module 6 – Bearings, Substructures and Rehabilitation of
Bridges

CEST-SBCE CEB805 Design of Bridges 4


Lectures and Tutorials

 Monday (9.00 – 11.00am – Lecture)

 Tuesday (8.00-10.00am – Lecture)

 Wednesday (8.00-10.00am – Lab)

CEST-SBCE CEB805 Design of Bridges 5


Overview
Private Study  Review lecture material and textbooks and recommended
readings
 Complete set problems and assignments

Lectures  Find out what you must learn


 See methods that are not in the textbook
 Follow worked examples
 Hear announcements on course changes

Assessments  Prepare and complete tests


 Complete assignment
 Prepare and complete final exam

CEST-SBCE CEB805 Design of Bridges 6


Outline Assessment
1. Test 1 - 10%

2. Test 2 - 10%

3. Assignment - 20%

4. Project - 20%

5. Final Exam - 40%

6. Attendance - 75%

CEST-SBCE CEB805 Design of Bridges 7


Plagiarism:
Beware! An assignment that includes plagiarised
material will receive a 0% Fail, and students who
plagiarise may fail the course. Students who
plagiarise are also liable to disciplinary action,
including exclusion from enrolment.

Plagiarism is the use of another person’s work or


ideas as if they were your own. When it is necessary
or desirable to use other people’s material you should
adequately acknowledge whose words or ideas they
are and where you found them (giving the complete
reference details, including page number(s)).

CEST-SBCE CEB805 Design of Bridges 8


AS5100 - Outline
1. AS5100.1 Bridge Design - Scope and general principles

2. AS5100.2 Bridge Design - Design loads


3. AS5100.3 Bridge Design - Foundation and soil-supporting structures
4. AS5100.4 Bridge Design – Bearings and deck joints
5. AS5100.5 Bridge Design – Concrete
6. AS/NZS 5100.6 Bridge Design – Steel and composite construction
7. AS5100.7 Bridge Design – Rating of Existing Bridges, and its current
Supplements and the Amendments issued.

CEST-SBCE CEB805 Design of Bridges 9


Session Outline
1. To understand basic concept and their classification?
2. To understand component parts of bridge.
3. To understand various elements of bridge components.
4. To understand functions of bridge components.

CEST-SBCE CEB805 Design of Bridges 10


What is a Bridge
• Bridge is a structure which help for communication route
which carry road traffic or moving load over any obstruction or
depression like river, lake, road, railway, etc.
 They come in various forms and are constructed above the
ground or at the predominant level.
 Four of the most common bridge types include:
 Beam
 Truss
 Arch
 Suspension

CEST-SBCE CEB805 Design of Bridges 11


http://en.wikipedia.org/wiki/File:Small_footbridge.jpg

Beam bridges

Draw on the load path


through the structure

http://www.makingthemodernworld.org.uk/learning_modules/maths/02.TU.03/img/IM.1463_zl.jpg

CEST-SBCE CEB805 Design of Bridges 12


Beam Bridges

CEST-SBCE CEB805 Design of Bridges 13


Truss bridges
http://content.answers.com/main/content/wp/en/thumb/b/b4/500px-The_Little_Belt_Bridge_(1935).jpeg

Draw on the load path


through the structure

http://www.southeastroads.com/alabama020/us-043_072_tn_river_br_01.jpg

CEST-SBCE CEB805 Design of Bridges 14


Arch Bridges (Truss arch bridge)
(Masonry) Arch Bridge
Grosvenor Bridge, Chester
Draw on the
load path
through the
structure

http://en.wikipedia.org/wiki/File:Grosvenor_Bridge_Chester3.JPG7.jpg

CEST-SBCE CEB805 Design of Bridges 15


Through Arch Bridge – Sydney Harbour Bridge

Draw on the
load path
through the
structure

http://gc.stud.tue.nl/oz/photos/nsw/0422_Sydney_Harbour_Bridge.jpg

CEST-SBCE CEB805 Design of Bridges 16


Suspension Bridges – Golden Gate Bridge, San Francisco

Draw on the load


path through the
structure

http://www.virtualtravelguides.co.uk/images/golden-gate-bridge.jpg

CEST-SBCE CEB805 Design of Bridges 17


Suspension Bridges – Humber Bridge, England
Draw on the load
path through the
structure

Source: www.humberbridge.co.uk accessed on 21/11/11

CEST-SBCE CEB805 Design of Bridges 18


Cable stayed bridges
Queen Elizabeth II Bridge, Dartford

Draw on the load


path through the
structure

Vasco Da Gama Bridge, Lisbon

CEST-SBCE CEB805 Design of Bridges 19


Typical composite road bridge

Explain the form of bridge construction used here?

CEST-SBCE CEB805 Design of Bridges 20


Piled foundations to bridge abutments
(substructure)
Driven steel Universal Bearing Pile - 305 x 305 x 186kg/m

What is the purpose of


the steel channel
welded to the flanges
near the top of the pile?

CEST-SBCE CEB805 Design of Bridges 21


Bridge abutment sequence -
base
5. Pour concrete to base,
incl. wall kicker

4. Erect formwork /
falsework to base
3. Fix steel rebar cage to
base, incl. starter bars

2. Pour blinding
concrete to provide
clean, solid base
1. Piles driven
down to suitable
sub-soil

CEST-SBCE CEB805 Design of Bridges 22


Bridge abutment sequence - base

CEST-SBCE CEB805 Design of Bridges 23


Bridge abutment sequence - wall
8. Pour abutment wall
concrete

7. Erect formwork /
falsework to wall

6. Fix abutment wall


rebar, splicing bars
onto starter bars from
base pour, plus
starter bars above

CEST-SBCE CEB805 Design of Bridges 24


Bridge abutment sequence - wall
Timber formwork and falsework

What is this and what does it do?

Steel panel formwork system

CEST-SBCE CEB805 Design of Bridges 25


Bridge abutment sequence - wall

Tie bars through walls –


with plastic sleeving to
allow withdrawal of tie
bar after concreting

The tie bars take the


concrete pressure, with
the falsework used to
support the formwork
and hold it in the right
position (vertical).

CEST-SBCE CEB805 Design of Bridges 26


Bridge abutment sequence –
ballast wall 11. Pour ballast wall
concrete
10. Erect formwork /
falsework to
ballast wall

9. Fix ballast wall


rebar, splicing bars
onto starter bars from
wall pour

CEST-SBCE CEB805 Design of Bridges 27


Bridge abutment sequence –
bearing plinths

Bearing plinth

Bearing shelf

Abutment wall

CEST-SBCE CEB805 Design of Bridges 28


Bridge abutment sequence –
bearing plinths

CEST-SBCE CEB805 Design of Bridges 29


Left: Bridge bearing placed in position
on bearing plinth

BRIDGE
BEARINGS

Right: Steel bridge


beams lifted into place
onto bridge bearings
(now fully grouted onto
bearing plinth)

CEST-SBCE CEB805 Design of Bridges 30


Bridge sequence – intermediate
piers

What are these?

CEST-SBCE CEB805 Design of Bridges 31


Bridge abutment sequence –
bearing plinths
Steel bridge beams lifted into
place on bearings

CEST-SBCE CEB805 Design of Bridges 32


Placing of
bridge beams

CEST-SBCE CEB805 Design of Bridges 33


Superstructure – diaphragm
beam
Diaphragm beam – this
runs along the back of the
steel beams, linking the 4
steel beams together.

CEST-SBCE CEB805 Design of Bridges 34


Superstructure – diaphragm
beam
Bridge deck – the reinforced concrete slab on which
road is constructed.

Bridge concrete parapet


cantilever - this runs
along the line of the
bridge, onto which the
vehicle parapet is fixed.

CEST-SBCE CEB805 Design of Bridges 35


Superstructure – bridge deck
Bridge deck – the reinforced concrete slab on which road is constructed.

CEST-SBCE CEB805 Design of Bridges 36


Superstructure – bridge deck /
parapet
Ivel Bridges scheme used GRP panels and RMD Paraslim
system for deck / parapet formwork / falsework.

CEST-SBCE CEB805 Design of Bridges 37


Classification of Bridges:

Material for Alignment of Location of Position of flood According to Based on Type of


Based on Purpose
construction Bridge – ‘Z’ Bridge Floor Level Span Super Structure
• Timber Bridge • Straight Bridge • Deck Bridge • Aqueduct • Submerged Bridge • Culvert(up to 6m) • Arch Bridge
• Masonry Bridge • Skew Bridge • Semi through • Viaduct • Non Submerged • Minor Bridge (8- • Girder Bridge
• Steel Bridge Bridge • Highway Bridge Bridge 12m) • Truss Bridge
• R.C.C Bridge • Through Bridge • Railway Bridge • Major Bridge (Up
• Pre-Stressed Bridge • Foot Bridge to 120m)
• Composite Bridge • Long span
Bridge(More than
120m)

CEST-SBCE CEB805 Design of Bridges 38


39

Spray applied
waterproofing
to bridges
decks &
parapet walls

CEST-SBCE CEB805 Design of Bridges 39


Classification of Bridges:

Material for Alignment of Location of Position of flood According to Based on Type of


Based on Purpose
construction Bridge – ‘Z’ Bridge Floor Level Span Super Structure
• Timber Bridge • Straight Bridge • Deck Bridge • Aqueduct • Submerged Bridge • Culvert(up to 6m) • Arch Bridge
• Masonry Bridge • Skew Bridge • Semi through • Viaduct • Non Submerged • Minor Bridge (8- • Girder Bridge
• Steel Bridge Bridge • Highway Bridge Bridge 12m) • Truss Bridge
• R.C.C Bridge • Through Bridge • Railway Bridge • Major Bridge (Up
• Pre-Stressed Bridge • Foot Bridge to 120m)
• Composite Bridge • Long span
Bridge(More than
120m)

CEST-SBCE CEB805 Design of Bridges 40


Materials for Bridge Construction:

Timber Masonry Steel Bridge


Bridge Bridge

R.C.C Bridge Pre-stressed


Bridge

CEST-SBCE CEB805 Design of Bridges 41


Classification of Bridges:

Material for Alignment of Location of Position of flood According to Based on Type of


Based on Purpose
construction Bridge – ‘Z’ Bridge Floor Level Span Super Structure
• Timber Bridge • Straight Bridge • Deck Bridge • Aqueduct • Submerged Bridge • Culvert(up to 6m) • Arch Bridge
• Masonry Bridge • Skew Bridge • Semi through • Viaduct • Non Submerged • Minor Bridge (8- • Girder Bridge
• Steel Bridge Bridge • Highway Bridge Bridge 12m) • Truss Bridge
• R.C.C Bridge • Through Bridge • Railway Bridge • Major Bridge (Up
• Pre-Stressed Bridge • Foot Bridge to 120m)
• Composite Bridge • Long span
Bridge(More than
120m)

CEST-SBCE CEB805 Design of Bridges 42


Alignment of Bridges

Alignment of Bridges
• Straight Bridge
• Skew Bridge

CEST-SBCE CEB805 Design of Bridges 43


Classification of Bridges:

Material for Alignment of Location of Position of flood According to Based on Type of


Based on Purpose
construction Bridge – ‘Z’ Bridge Floor Level Span Super Structure
• Timber Bridge • Straight Bridge • Deck Bridge • Aqueduct • Submerged Bridge • Culvert(up to 6m) • Arch Bridge
• Masonry Bridge • Skew Bridge • Semi through • Viaduct • Non Submerged • Minor Bridge (8- • Girder Bridge
• Steel Bridge Bridge • Highway Bridge Bridge 12m) • Truss Bridge
• R.C.C Bridge • Through Bridge • Railway Bridge • Major Bridge (Up
• Pre-Stressed Bridge • Foot Bridge to 120m)
• Composite Bridge • Long span
Bridge(More than
120m)

CEST-SBCE CEB805 Design of Bridges 44


Based on Purpose:

Aqueduct Viaduct

Highway
Foot Bridge
Bridge

Railway
Bridge

CEST-SBCE CEB805 Design of Bridges 45


Alignment of Bridges

Components of Bridges
• Carriageway
• Decking
• Abutment
• Pier

CEST-SBCE CEB805 Design of Bridges 46


Bridge - Eurocode

CEST-SBCE CEB805 Design of Bridges 47


HOMEWORK
Concrete Basics
 Choose your
 Self Assessment Question (2 Question)

CEST-SBCE CEB805 Design of Bridges 48


Any Questions?