3D Geological Modeling Chapter 03 – Data Set
Development
The sea depth in the area is 130 - 220 meters (426.509 - 721.784 foot). The field has been
developed with three integrated processing, drilling and accommodation facilities with concrete
bases and steel topsides, Gullfaks A, B and C. Gullfaks B has a simplified processing plant with
only first-stage separation.
Gullfaks A and C receive and process oil and gas from Gullfaks Sør and Gimle. The facilities
are also involved in production and transport from Tordis, Vigdis and Visund. The Tordis
production is processed in a separate facility on Gullfaks C.
2
3D Geological Modeling Chapter 03 – Data Set
Reservoir
The Gullfaks reservoirs consist of Middle Jurassic sandstones of the Brent Group, and Lower
Jurassic and Upper Triassic sandstones of the Cook, Statfjord and Lunde formations. The
reservoirs are 1700 - 2000 meters (5577.427- 6561.679 foot) below the sea level.
The Gullfaks reservoirs are located in rotated fault blocks in the west and a structural horst in
the east, with an intermediate highly faulted area.
Fig3.3: Structural setting of the Gulfacks main field showing 3 main areas
3
3D Geological Modeling Chapter 03 – Data Set
Recovery strategy
The drive mechanisms are water injection, gas injection or water/alternating gas injection
(WAG). The drive mechanism varies between the drainage areas in the field, but water injection
constitutes the main strategy.
4
3D Geological Modeling Chapter 03 – Data Set
Transport
Oil is exported from Gullfaks A and Gullfaks C via loading buoys to shuttle tankers. The part of
the rich gas that is not reinjected is sent through the export pipeline to Stat pipe for further
processing at Kårstø and export to the Continent as dry gas .
5
3D Geological Modeling Chapter 03 – Data Set
Status
Production from Gullfaks is in the decline phase. Efforts are being made to increase recovery,
partly by locating and draining pockets of remaining oil in water flooded areas, and partly
through continued massive water circulation .
Implementation of a chemical flooding pilot will be considered in 2010. A new project has
also been initiated to evaluate necessary facility upgrades for lifetime extension of the field
towards 2030 .