SOP - Ready Mix Annual Facility Audit

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Standard Operating Procedure

Ready Mix Annual Facility Audit

Objectives:
 The purpose of the Annual Facility Audit is to ensure that Ready Mix facilities are
operating and documenting operations which meet NCDOT standards, and are capable of
producing NCDOT approved concrete.
 Audits shall be performed a minimum of once per year, unannounced, and recommended
during a NCDOT production.

Materials Inspection and Acceptance:


The review of documentation and collection of samples will confirm the facility meets all
NCDOT standards, and is in compliance with all Materials and Tests policies.

Safety Equipment List:


Safety Vest
Hard Hat
Steel Toe boots
Eye and ear protection
Gloves for collecting samples

Safety Concerns:
Personnel should be aware at all times of functioning equipment and machinery. Review all
safety guidelines required by the facility.

Required Sampling:
Cement – one gallon (plastic bag)
Fly Ash – one gallon (plastic bag), sample is to be submitted to chemical and physical lab
Fine Aggregate – one bag (25 – 30 pounds)
Coarse Aggregate – one bag (25 – 30 pounds)
Water – ½ gallon (one wide mouth jar)
Samples should be submitted to Chemical and Physical Laboratories with appropriate
sample cards.
M&T Inspector’s Audit:
 Verify 3rd party facility certificate with expiration date is on site.
 Verify 3rd party inspection report (complete report/check list performed by 3rd party) is
on-site.
 Verify 3rd party inspector has been certified by CRMCA.
 Verify facility manager is sending all 3rd party inspection documentation to M&T (see
Annual Facility Audit Field Book).
 View and verify facility is utilizing NCDOT approved mix designs.
 View and verify certification of all on-site NCDOT Concrete Field Technicians.
Technician certifications must be active.
 View and verify certification of all on-site NCDOT Concrete Batch Technicians.
Technician certifications must be active.
 View and verify approved materials (cement, fly ash, aggregate, admixtures) per
approved mix designs.
 View and verify on-site approved trucks (new list is to be generated every year- kept on-
site).
 Verify documentation regarding the performance of moisture tests on fine and coarse
aggregates.
 Verify the Certified on-site Batching Technician has the ability to adjust moisture during
the batching process (review of batch tickets and/or operating process is acceptable).
 View sample of associated NCDOT documentation (903, 250, copies of batch weights,
etc) is completed for every NCDOT production of concrete.

Standards:
NCDOT Standard Specifications For Roads And Structures
NCDOT Materials and Tests policies and procedures
Sample Prep And Submittal:
Sample containers shall be handled to avoid contamination during the sampling, log-in, and
transportation process. Sample cards shall be fixed to their corresponding sample container and
transported to the appropriate laboratory for analysis.

Samples shall be entered utilizing the HiCAMS system - see Annual Facility Audit Field Manual
for entry examples.

Documentation Submittal:
 Complete the “2015 Ready Mix Concrete Annual Facility Audit Checklist” (located on
the S-drive), and send to Shannon Burns. This documentation can be submitted via
electronically, faxed, or hard copy sent by mail.
 Complete the “2015 Ready Mix Facility Ownership Update” form (located on the S-
drive), and send to Shannon Burns. This documentation can be submitted via
electronically, faxed, or hard copy sent by mail.

You might also like