Stage 1 - Application for Inspection

Documents required by BCA (where applicable)

Certificate of Supervision of Building Works (Form BCA-CSC-CSPBW or BPD_CSC02)


Declaration by Qualified Person (Form BCA-CSC-TOPCSCDQP or BPD_CSC07)
QP's confirmation on details of lift(s) installed in development
Stage 2 - Application for TOP/CSC

Documents required by BCA (where applicable)

Certificate of Supervision of Piling Works and Notice of Completion (Form BCA-BE-QPCTPW or BEV C
Certificate of Supervision of Structural Works (Form BCA-BE-QPCTSSW or BEV C2)
Certificate of Record Structural Plans/Calculations (Form BCA-BE-CTASST or BEV C3)
Listing of safety barrier submissions and engineered façade submissions (Please see BCA circular BC
Builder's Certificate of Completion of Building Works (Form BCA-BE-BRCTBW or BC-BC)
As-built Plans, Test Reports and Certificate of Supervision of Lightning Protection System (Form BCA-C
Certificate of Supervision of Installation of Escalators/ Lifts/ Stair lift/ Platform lift (Form BCA-CSC-CSP
Certificate of Supervision of Mechanical Ventilation/ Air-conditioning System (Form BCA-CSC-CSPACM
QP's declaration on compliance with daylight reflectance for external surfaces
Permit to Operate (PTO) for lifts in development
Submission of Record Plan (Form BCA-BP-BPRP01)
Compliance to Written Advice issued after site inspection
Clearance on the as-built Buildability/ Constructability score (Form BCA-BP-BS03 or BPD_BS03, Form

Clearance on the as-built GM score (Forms BPD_GM02 + BPD_GM02_Appendix 2)

Commissioning approval for the CD shelters (Form BCA-CD-COMM01)

Clearances required from the other technical departments (where applicable)

Technical departments
PUB - Drainage and Sanitary
NEA - Pollution Control and Environmental Health
FSSD - Fire Safety
LTA - Road & Transport
LTA - Vehicle Parking
LTA - MRTC line
NPARKS
URA
EMA (for residential development with 10 units or more, wef 1 June 2018)
Cable Readiness Certificate
CAAS and DSTA - Height Control
4/08/2011 and BCA BC APPBCA-2017-01 dated 1 Jan 2017)

BPD-CSC03)

Items to
Substantiate for B
and C Score
Clearance at TOP
by BDD
20Oct14.docx

GM Calculation GM - Guidelines
Template and and Site Checklist
Checklists.xlsx for Non-Residential
building.docx

CDSD guidelines -
CDSD guidelines -
flow charts -
commissioning of
Checklist - Form.pdf
shelters.pdf

for TOP application for CSC application


TOP CSC
TOP CSC
TFP FSC
BP CSC
BP CSC
BP CSC
BP CSC
Clearance from URA
Notice of Unit Inspection Completion from SP Services
Yes
Yes