REQUEST FOR INSPECTION

Project Name : JAWA1 CCGT Power Plant Request No. : J1-SCT-RFI-A00-I0027

Contractor : Samsung C&T M/S No. : J1-SCT-WMS-A00-0003

Subcontractor : PT.Cigading Habeam Centre Drawing No. :

Discipline : ARC (Steel Structure) Date. : 16-11-2019

Location : Lay Down Area PB2& PB1

No. Description of Inspection Date/Time Remarks


Carry-in and unloading steel frame
1. 17-11-2019/09:00
members
Check of damage of member during
2. 17-11-2019/09:00
transportation
3. Check of damage of temporary piece 17-11-2019/09:00
4. Check of friction joint surface 17-11-2019/09:00

Comments :

CONTRACTOR (GE/SCT/MEI)
Subcontractor OWNER
Construction QA/QC
Designation
Name

Signature

Date
JAWA1 CCGT POWER PLANT
INSPECTION & TEST REPORT
Contractor RFI No.
Subcontractor Report No.
Discipline Drawing No.
Location Date

No. Inspection Item Result(Pass/Fail/NA) Remarks

Comments:

Name (Signature) / Date

Name (Signature) Name (Signature) Name (Signature) Name (Signature)

Date Date Date Date


Construction QA/QC
Subcontractor Owner/OE
CONTRACTOR (GE/SCT/MEI)

.
RECEIVING INSPECTION
REPORT
Document No. Date 17-11-2019
Item Gas & Steam Turbine Building unit #21 Steel Structure Frame
Location Lay Down Area PB2&PB1 Qty 14 p’kgs
P.O No. JAWA 1-CIV-006 Supplier PT. CHC
Attachment COC,PL,SIR,DN Reference
Package Type □ Loosed □ Container □ Wooden Box □ Carton Box □ Others
Check List
Inspection Item Inspection Record Remark
1. Packing Condition □ Good □ Normal □ Bad
2. Shortage □ Yes □ No
3. Damage □ Yes □ No
4. Discrepancy □ Yes □ No
5. Others

Supporting Doc. □ Mill Certificate □ Packing List □ Etc.,:


Notes (Any Variations)

Result of Inspection
□ Accepted □ Conditional Accepted □ Rejected