Request For Inspection
Request For Inspection
Request For Inspection
Comments :
CONTRACTOR (GE/SCT/MEI)
Subcontractor OWNER
Construction QA/QC
Designation
Name
Signature
Date
JAWA1 CCGT POWER PLANT
INSPECTION & TEST REPORT
Contractor RFI No.
Subcontractor Report No.
Discipline Drawing No.
Location Date
Comments:
.
RECEIVING INSPECTION
REPORT
Document No. Date 17-11-2019
Item Gas & Steam Turbine Building unit #21 Steel Structure Frame
Location Lay Down Area PB2&PB1 Qty 14 p’kgs
P.O No. JAWA 1-CIV-006 Supplier PT. CHC
Attachment COC,PL,SIR,DN Reference
Package Type □ Loosed □ Container □ Wooden Box □ Carton Box □ Others
Check List
Inspection Item Inspection Record Remark
1. Packing Condition □ Good □ Normal □ Bad
2. Shortage □ Yes □ No
3. Damage □ Yes □ No
4. Discrepancy □ Yes □ No
5. Others
Result of Inspection
□ Accepted □ Conditional Accepted □ Rejected
Signature/Date