CPF Upgrade - PFD: Pkg-01 - Inlet Manifold Skid

The document appears to be a process flow diagram (PFD) showing the layout of equipment for a CPF upgrade project. It includes multiple packages of equipment such as inlet manifolds, test separators, production separators, water bath heaters, electrostatic dehydrators, desalters, flare knockout drums, export pumps, and more. The diagram labels the equipment and shows how streams such as water, crude oil, and gases will flow between the various units.

Uploaded by

Ibrahim Dewali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
161 views15 pages

CPF Upgrade - PFD: Pkg-01 - Inlet Manifold Skid

The document appears to be a process flow diagram (PFD) showing the layout of equipment for a CPF upgrade project. It includes multiple packages of equipment such as inlet manifolds, test separators, production separators, water bath heaters, electrostatic dehydrators, desalters, flare knockout drums, export pumps, and more. The diagram labels the equipment and shows how streams such as water, crude oil, and gases will flow between the various units.

Uploaded by

Ibrahim Dewali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 15

CPF UPGRADE - P

PKG-01 - INLET MANIFOLD SKID PKG-02 -TEST SEPARATOR SKID

20-BDV-02

20-V-01

LIC
42-SDV-001
eu155:
Existing water outlet l
LCV is 2" size and byp
42-LCV-001 line is 2" size and
downstream of SDV is
pipeline.LCV and bypa
line to be replaced by
PRODUCTION and downstream of LC
isolation valve pipelin
HEADER tie-in point of product
10-ESDV-002 separator water outlet
TEST HEADER pipeline is required
PKG-03 - PRODUCTION SEPAR4
size.
10-ESDV-001

20-BDV-04

PKG-09
CHEMICAL INJECTION SKID 20-V-02

LIC
42-SDV-002

eu155:
Existing water outlet l
LCV is 2" size and byp
line is 2" size and
downstream of SDV is
pipeline.LCV and bypa
PKG-10 line to be replaced by
PLANT & INST AIR SKID and downstream of SD
pipeline till skim tank
required 8"size.
PKG - 16 DIESEL TO BURNERS
CLOSED DRAIN DRUM
TO WATER BATH HEATER

TO SKIM TANK
FRESH WATER

PUMP A PUMP B TO F.K.O.DRUM RCR FROM TOPPING PLANT

FROM CLOSED DRAIN HEADER

CLOSED DRAIN PUMPS

OIL FROM INTERCEPTOR


UPGRADE - PFD

TO F. K.O.DRUM
PKG-02 -TEST SEPARATOR SKID PIC
PKG- 03 - FUEL GAS SCRUBBER
20-PCV-001
PIC

43-V-01
PCV

20-V-01

SDV
LIC LIC

20-SDV-001
eu155:
Existing water outlet line
LCV is 2" size and bypass
line is 2" size and 20-LCV-001
downstream of SDV is 4"
pipeline.LCV and bypass
line to be replaced by 3"
and downstream of LCV LCV
isolation valve pipeline till
tie-in point of production
separator water outlet TO F. K.O.DRUM
PKG-03 - pipeline is required
PRODUCTION 4"
SEPARATOR SKID
size.
PCV-XX-B
PCV-XX-A

PIC

20-V-02

TO FLARE K.O.DRUM
LIC

20-SDV-006
42-LCV-002

20-LCV-002

eu155:
Existing water outlet line
LCV is 2" size and bypass
line is 2" size and
downstream of SDV is 4"
pipeline.LCV and bypass
line to be replaced by 6"
and downstream of SDV
pipeline till skim tank is
PKG-13 WATER
required 8"size.
BATH HEATER PKG-14 ELECTROSTATIC DEHYDRATOR & DESAL
TIC

T-XXX DS-XXX
TCV WBH BYPASS LINE
H-XXX

FRESH WATER STATIC MIXTURE

TO PRODUCTION SEPARATOR WATER RECYCLE PUMP-A/B

NTERCEPTOR LCV-XX-A

TO SKIM TANK

LCV-XX-B
PKG-11
FLARE TIP
FUEL GAS PKG-11 - FLARE K.O. DRUM SKID

41-FL-01
TO FLARE HEADER

41-V-01
LIC

LCV FLARE
IGNITION
TO CLOSED DRAIN PANEL

TO CLOSED DRAIN

OIL TO STORAGE TANK:01-A/B

BLANKETING GAS LINE

RCR
TO FLARE K.O.DRUM TO FLARE K.O.DRUM
30-TK-01A

BLANKETING GAS LINE

PCV
PIC 30-TK-01B

TATIC DEHYDRATOR & DESALTER

DS-XXX LIC PKG-05


LCV SDV EXPORT PUMP

43-V-01
SKID
43-V-01 30-P-01 A/B/C

LIC PKG-15 DEGASSING BOOT BLANKETING GAS LINE

SKIM
TANK
WATER RECYCLE PUMP-A/B WATER TO DISPOSAL WELL ILIC

LCV

PUMP A/B
41-FL-01

N2 FOR BLANKETING

BLANKETING GAS LINE

30-P-02 A/B
RECIRCULATION
PUMPS NAPHTHA

RCR

NAPHTHA
FCV
ESDV CRUDE OIL TO EXPORT
METERING SKID
1
0
-
V
BLANKETING GAS LINE -
3
4

OIL TO INTERCEPTOR
SKIM
SEAL LOOP
TANK

TO EVOPORATION POND

4
3
-
V
-
0
1
MODIFICATION………

TO KO DRUM

20-BDV-004
30-TK-01A 30-TK-01B

TIE IN
20-V-02 POINT

LC LC LC
20-SDV-006

LC LO
DRAIN POINT O
eu155:
Existing water outlet line
LCV is 2" size and bypass
line is 2" size and
downstream of SDV is 4"
pipeline.LCV and bypass
line to be replaced by 6"
and downstream of SDV
pipeline till skim tank is
required 8"size.
30-TK-01B

LC