CPF Upgrade - PFD: Pkg-01 - Inlet Manifold Skid
CPF Upgrade - PFD: Pkg-01 - Inlet Manifold Skid
20-BDV-02
20-V-01
LIC
42-SDV-001
eu155:
Existing water outlet l
LCV is 2" size and byp
42-LCV-001 line is 2" size and
downstream of SDV is
pipeline.LCV and bypa
line to be replaced by
PRODUCTION and downstream of LC
isolation valve pipelin
HEADER tie-in point of product
10-ESDV-002 separator water outlet
TEST HEADER pipeline is required
PKG-03 - PRODUCTION SEPAR4
size.
10-ESDV-001
20-BDV-04
PKG-09
CHEMICAL INJECTION SKID 20-V-02
LIC
42-SDV-002
eu155:
Existing water outlet l
LCV is 2" size and byp
line is 2" size and
downstream of SDV is
pipeline.LCV and bypa
PKG-10 line to be replaced by
PLANT & INST AIR SKID and downstream of SD
pipeline till skim tank
required 8"size.
PKG - 16 DIESEL TO BURNERS
CLOSED DRAIN DRUM
TO WATER BATH HEATER
TO SKIM TANK
FRESH WATER
TO F. K.O.DRUM
PKG-02 -TEST SEPARATOR SKID PIC
PKG- 03 - FUEL GAS SCRUBBER
20-PCV-001
PIC
43-V-01
PCV
20-V-01
SDV
LIC LIC
20-SDV-001
eu155:
Existing water outlet line
LCV is 2" size and bypass
line is 2" size and 20-LCV-001
downstream of SDV is 4"
pipeline.LCV and bypass
line to be replaced by 3"
and downstream of LCV LCV
isolation valve pipeline till
tie-in point of production
separator water outlet TO F. K.O.DRUM
PKG-03 - pipeline is required
PRODUCTION 4"
SEPARATOR SKID
size.
PCV-XX-B
PCV-XX-A
PIC
20-V-02
TO FLARE K.O.DRUM
LIC
20-SDV-006
42-LCV-002
20-LCV-002
eu155:
Existing water outlet line
LCV is 2" size and bypass
line is 2" size and
downstream of SDV is 4"
pipeline.LCV and bypass
line to be replaced by 6"
and downstream of SDV
pipeline till skim tank is
PKG-13 WATER
required 8"size.
BATH HEATER PKG-14 ELECTROSTATIC DEHYDRATOR & DESAL
TIC
T-XXX DS-XXX
TCV WBH BYPASS LINE
H-XXX
NTERCEPTOR LCV-XX-A
TO SKIM TANK
LCV-XX-B
PKG-11
FLARE TIP
FUEL GAS PKG-11 - FLARE K.O. DRUM SKID
41-FL-01
TO FLARE HEADER
41-V-01
LIC
LCV FLARE
IGNITION
TO CLOSED DRAIN PANEL
TO CLOSED DRAIN
RCR
TO FLARE K.O.DRUM TO FLARE K.O.DRUM
30-TK-01A
PCV
PIC 30-TK-01B
43-V-01
SKID
43-V-01 30-P-01 A/B/C
SKIM
TANK
WATER RECYCLE PUMP-A/B WATER TO DISPOSAL WELL ILIC
LCV
PUMP A/B
41-FL-01
N2 FOR BLANKETING
30-P-02 A/B
RECIRCULATION
PUMPS NAPHTHA
RCR
NAPHTHA
FCV
ESDV CRUDE OIL TO EXPORT
METERING SKID
1
0
-
V
BLANKETING GAS LINE -
3
4
OIL TO INTERCEPTOR
SKIM
SEAL LOOP
TANK
TO EVOPORATION POND
4
3
-
V
-
0
1
MODIFICATION………
TO KO DRUM
20-BDV-004
30-TK-01A 30-TK-01B
TIE IN
20-V-02 POINT
LC LC LC
20-SDV-006
LC LO
DRAIN POINT O
eu155:
Existing water outlet line
LCV is 2" size and bypass
line is 2" size and
downstream of SDV is 4"
pipeline.LCV and bypass
line to be replaced by 6"
and downstream of SDV
pipeline till skim tank is
required 8"size.
30-TK-01B
LC