Allama Iqbal Open University Islamabad (Department of Business Administration)
Allama Iqbal Open University Islamabad (Department of Business Administration)
Allama Iqbal Open University Islamabad (Department of Business Administration)
CHECKLIST
1. Textbooks (Two)
2. Course Outlines
3. Assignment No. 1, 2
4. Assignment Forms ( 2 sets )
In this packet, if you find anything missing out of the above mentioned material, please
contact at the address given below:
Mailing Officer
Services Block No. 28
Allama Iqbal Open University
H-8, Islamabad
Ph: 051-9057711-12
S.A.RAHAT
Course Coordinator
ALLAMA IQBAL OPEN UNIVERSITY, ISLAMABAD
(Department of Business Administration)
WARNING
1. PLAGIARISM OR HIRING OF GHOST WRITER(S) FOR SOLVING
THE ASSIGNMENT(S) WILL DEBAR THE STUDENT FROM AWARD
OF DEGREE/CERTIFICATE, IF FOUND AT ANY STAGE.
2. SUBMITTING ASSIGNMENT(S) BORROWED OR STOLEN FROM
OTHER(S) AS ONE’S OWN WILL BE PENALIZED AS DEFINED IN
“AIOU PLAGIARISM POLICY”.
Q. 2 Discuss conflicts in project environment and the role of project manager in
resolving the conflicts. (20)
Q. 3 What are the Problems faced by project managers during Cost Control? (20)
Q. 4 What are the fundamentals of project graphics. Also discuss about Bar Chart and
other conventional presentation techniques. (20)
Q. 5 Discuss in detail about project risks. Also discuss the strategies to overcome these
risks, along with practical examples. (20)
ASSIGNMENT No. 2
Total Marks: 100
Pass Marks: 50
This assignment is a research-oriented activity. You are required to submit a term paper
and present the same in the classroom prior to the final examination. Presentation
component is compulsory for all students. You will have to participate in the activity
fully and prepare a paper of about 15 to 20 pages on the topic allotted to you. The
students are required to prepare two copies of Assignment No. 2. Submit one copy to
your teacher for evaluation and the second copy for presentation in the classrooms in the
2
presence of your resource persons and classmates, which will be held at the end of the
semester prior to final examination.
List of Topics
1.GERT
2.Work Breakdown Structure (WBS)
3.CPM
4.Project team
5.Procurement Process
6.Project management software
7.Contracts
8.Life Cycle Costing
9.Managing multiple projects
3
1.4 Systems Thinking for Project Management Success
4
4.1 Networks Scheduling Techniques
4.2 Program Evaluation and Review Technique (PERT)
4.2.1 Graphical Evaluation and Review Technique (GERT)
4.2.2 Critical Path Method (CPM)
4.2.3 Difference Between GERT and PERT
4.2.4 Difference Between PERT and CPM
4.2.5 Estimating Activity Time and Total Program Time
4.2.6 Determining Slack Times
4.2.7 Determining Crash Times
4.2.8 Restructuring PERT/CPM
4.2.9 Advantages and Disadvantages of PERT/CPM
4.3 Project Management Software
4.3.1 Features and Classification of Project Management Software
4.3.2 Evaluation of PM Software in Terms of Performance, Quality and
Versatility
4.3.3 Problems During Software Implementation Stage
4.4 Project Graphics
4.4.1 Fundamentals of Project Graphics
4.4.2 Bar Chart, Other Conventional Presentation Techniques
4.4.3 Constructing Logic Diagrams/Networks
5
6.2 Requirements for an Effective Control System
6.3 Management Cost and Control System (MCCS)
6.3.1 Phases of Management Cost and Control System (MCCS)
6.3.2 Cost Account Codes and Work Packages
6.4 Project Budgets, Variance and Earned Value
6.5 Material Costs
6.5.1 Recording Material Costs Using Earned Value Measurement
6.5.2 Material Accounting Criterion
6.5.3 Material Variances
6.5.3.1 Price Variance
6.5.3.2 Usage Variance
6.5.4 Summary Variance
6.6 Status Reporting and its Benefits
6.7 Problems During Cost Control
6
8.2.3 How to make it Work?
8.2.4 Established Practices
8.2.5 Categorizing Broad Spectrum of Documents
Recommended Books:
Kerzner, H. (2009). Project Management, a Systems Approach to Planning, Scheduling
and Controlling (10th ed.). Hoboken New Jersey: John Wiley & Sons Inc.
Lock, D. (2007). Project Management (3rd ed.). England: Grower Publishing Ltd.
____[ ]____