Risk Assessment For Site Survey
Risk Assessment For Site Survey
Risk Assessment For Site Survey
4. Data Collection • Tripping hazard • Minor and Major • APR should ensure that the workers fully
• Ergonomics hazard Injury to a person. understand the area & follow approved MOS.
• Improper posture, • Damage to the • Maintain proper housekeeping. All area
twisting, awkward property. should be clean from unwanted and scattered
position. . material.
Prior to commencement of job, Authorized Permit Receiver / Supervisor must give information on details of job, hazards, risks and safety
precautions to all personnel involved in the job and obtain their signatures on the form to acknowledge the same.
FORM GUIDANCE
1.0 Requirements
The Dynamic risk assessment shall be:
i. completed on an approved format – Dynamic Risk Assessment Form (See Appendix 1) by
Authorized Permit Receiver of MaSa Maintenance section, Contractors and others, whoever
intends to carry out non-operational work.
ii. relevant to specific activity and once it is completed and need not be repeated for similar jobs
iii. reviewed and repeated if there are changes in activity or location or method of performing tasks or
work environment
iv. reviewed by:
a) MaSa or Marafiq Coordinating engineer – will ensure all the nonoperation work job steps
are enlisted step by step in sequential order including hazards, risks and control measures
and
b) MaSa Safety Engineer –QHSE Department – will ensure all the nonoperation work job
steps are enlisted in sequential order including hazards, risks and control measures
v. approved by MaSa BUM (Business Unit Manager) or Operations Superintendents – Authorized
Permit Controller and
vi. submitted to API Authorized Permit Issuer MaSa
vii. attached with following supporting documents where required:
a) Copies of “Contractor’s compliance statement” – for contract woks + APR card + IDs or gate
passes & MaSa / Marafiq Safety Induction training attendance sheets of personnel who will be
working on Marafiq plant, properties & premises managed by MaSa O&M..
b) Notification / Statement of project work or proposed action - – for contract woks, tie-ins, etc.
c) Plant outage Request + Excavation request forms with drawings for tie ins
d) Technical service request or approval for changes or modifications or additional electrical
connections to existing systems, etc.
e) Third party certificates of lifting equipment / pressure vessels that will be used – where required
f) Lifting plan for critical lifts
g) Inspection lists of work equipment that will be brought on site +
h) Driving licences / third party certificates / authorizations of operators, scaffold personnel, etc.
Classified as MARAFIQ Internal Use
3 Section 1 Details
Details includes following:
a) Name of MaSa Department / contractor – who intends to undertake work activity in MaSa
O&M areas
b) Date – on which it is prepared
c) Facility / Department – Area in which the intended work activity will be performed
d) Job Location – Exact workplace where the intended work activity will be performed
e) Specify Work Activity to be assessed - Actual work
f) Assessment team member – Team comprising of competent personnel from management,
supervisor and employee intending to undertake work activity
g) Signature – signatures of team members
h) Job steps involved in the work activity –should be listed
i) Potential hazard –should be identified against each job step and recorded
j) Severity / consequences –which are likely to occur should be specified
k) Control measures –to eliminate or reduce the risks associated with identified hazards should
be specified clearly
4.2 MaSa / Marafiq Coordinating department, who is either directly undertaking the activity, or
coordinating with the contractor assigned to undertake the activity, shall review the risk
assessment, give comments accordingly and ensure the following:
i. job steps involved in the work activity – are identified and correctly listed
ii. potential hazard –against each job step is identified and recorded
iii. severity / consequences – likely to occur on exposure are specified
iv. control measures –to eliminate or reduce the risks associated with identified hazards are
specified clearly
v. List of material – All tools , work equipment, safety and emergency items are listed
4.4 MaSa O&M Manager or Superintendent shall review and approve the risk assessment and
acknowledge the same.
II) Safety and emergency items used for protection of employees against hazards or mitigating
effects from tolerable residual risks. Examples include:
• Personal protective equipment – helmets, safety shoes, goggles, face shields, full
body harness, respirators, special clothing, etc.
• Emergency items – Emergency rescue arrangement - tripod and winch assembly,
firefighting equipment, etc.
i. Risk assessment are obtained for all works that are inherent with significant risks and
repeated whenever there are likely changes in intended work activity / location / work
environment, etc.
ii. The MaSa Department or the contractor, ( whoever submits the reviewed and approved risk
assessment) has all specified risk control measures in place prior to issue of Permit to Work
Certificate
iii. Risk control measures specified in risk assessment are in place and utilized while performing
the intended activity.