SCHEDULE PP Presisi Per TGL 9 Maret
SCHEDULE PP Presisi Per TGL 9 Maret
SCHEDULE PP Presisi Per TGL 9 Maret
Dur Dur
Nos Vol Sat HYD001 DH002 DH003 DH004 Total Equip. Prod /Day (Days) (Week) Start Finish Harga Satuan Harga Total Bobot W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
PREPARATION WORK
Mobilization 1 Ls 9 2 3-Jan-20 12-Jan-20 Rp 750,000,000 Rp 750,000,000 0.041
Piling Rig NISHA DHP 80 (3 Unit)
Piling Rig NISHA DHP 508 (1 Unit)
Service Crane 1 KOBELCO 7045
Service Crane 2 KOBELCO 7055
Service Crane 3 SANY SCC500E
Service Crane 4 KOBELCO 7050
Diesel Hammer DD 6.5 T (3 Unit)
Diesel Hammer DD 8.5 T (1 Unit)
Mesin las
Genset
Temporary Facility (office, acomodation, etc) 1 Ls 9 2 20-Jan-20 29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.006
Utility Facility 1 Ls 9 2 20-Jan-20 29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.006
Site management, Equipment, Tools 1 Ls 9 2 20-Jan-20 29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.006
PERMANENT WORK
Handling Pile 78083 m' 287 41 24-Jan-20 6-Nov-20 Rp 52,000 Rp 4,060,316,000 0.220
Length @12m, handling pile from trailer to laydown area and from laydown area to pilling work area (inside area)
Diameter 400 mm 4,392 m'
Diameter 500 mm 17,169 m'
Diameter 600 mm 54,506 m'
Diameter 800 mm 2,016 m'
PILING WORK
332 COOLING TOWER UTILITY (D600) 1 RIG
25 Sept 19 - 23 Okt 19 58 2088 m' 1 1 6 17 3 9-Mar-20 26-Mar-20 Rp 145,000 Rp 302,760,000 0.016
332 COOLING TOWER UTILITY (D600) 146 5256 m' 1 1 4 41 6 9-Mar-20 19-Apr-20 Rp 170,000 Rp 893,520,000 0.048 1 RIG
25 Sept 19 - 23 Okt 19
331 STEAM GENERATION
HRSG A-331-07A/B/C/D (D600) 158 5016.5 m' 1 1 6 31 5 9-Mar-20 9-Apr-20 Rp 145,000 Rp 727,392,500 0.039 2 RIG
25 Okt 19 - 9 Apr 20
1.2
1.3
1.4
2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.2
2.3
2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.5
3
PREPARATION WORK
Mobilization
Piling Rig NISHA DHP 80 (3 Unit)
Piling Rig NISHA DHP 508 (1 Unit)
Service Crane 1 KOBELCO 7045
Service Crane 2 KOBELCO 7055
Service Crane 3 SANY SCC500E
Service Crane 4 KOBELCO 7050
Diesel Hammer DD 6.5 T (3 Unit)
Diesel Hammer DD 8.5 T (1 Unit)
Mesin las
Genset
Temporary Facility (office, acomodation, etc)
Utility Facility
Site management, Equipment, Tools
PERMANENT WORK
Handling Pile
Length @12m, handling pile from trailer to laydown area and from laydown area to pilling work area (inside area)
Diameter 400 mm
Diameter 500 mm
Diameter 600 mm
Diameter 800 mm
PILING WORK
332 COOLING TOWER UTILITY (D600)
25 Sept 19 - 23 Okt 19
332 COOLING TOWER UTILITY (D600)
25 Sept 19 - 23 Okt 19
331 STEAM GENERATION
HRSG A-331-07A/B/C (D600)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
HRSG A-331-07D (D600)
25 Okt 19 - 9 Apr 20
1 Ls 9 2
1 Ls 9 2
1 Ls 9 2
1 Ls 9 2
4,392 m'
17,169 m'
54,506 m'
2,016 m'
66 2178 m' 1 1 3 26 4
58 1914 m' 1 1 3 23 4
51 1683 m' 1 1 3 20 3
m' 1 1 3 0 0
66 1320 m' 1 1 6 13 2
57 1311 m' 1 1 2 6 6 1
69 m' 1 1 1 3 6 5 1
183 Nos
1,266 Nos
2,696 Nos
264 Nos
1 Nos
9 Nos
8 Nos
1 Nos
1 Nos
9 Nos
8 Nos
1 Nos
2 Nos
2 Nos
9 Nos
86 Nos
83 Nos
13 Nos
4 Day
1 Ls 9 2
Nov-19
Start Finish Harga Satuan Harga Total Bobot W1 W2 W3
1 RIG
2 RIG
2 RIG
3 RIG
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Mar-20 Apr-20 May-20 Jun-20
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
1 RIG
3 RIG
3 RIG
3 RIG
1 RIG
2 RIG
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
1 RIG
1 RIG
1 RIG
1 RIG
1 RIG
1 RIG
2 RIG
3 RIG
3 RIG
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Oct-20 Nov-20
W2 W3 W4 W1 W2 W3 W4
0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000
1
1.1
1.2
1.3
1.4
2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.2
2.3
2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.5
3
PREPARATION WORK
Mobilization
Piling Rig NISHA DHP 80 (3 Unit)
Piling Rig NISHA DHP 508 (1 Unit)
Service Crane 1 KOBELCO 7045
Service Crane 2 KOBELCO 7055
Service Crane 3 SANY SCC500E
Service Crane 4 KOBELCO 7050
Diesel Hammer DD 6.5 T (3 Unit)
Diesel Hammer DD 8.5 T (1 Unit)
Mesin las
Genset
Temporary Facility (office, acomodation, etc)
Utility Facility
Site management, Equipment, Tools
PERMANENT WORK
Handling Pile
Length @12m, handling pile from trailer to laydown area and from laydown area to pilling work area (inside area)
Diameter 400 mm
Diameter 500 mm
Diameter 600 mm
Diameter 800 mm
PILING WORK
332 COOLING TOWER UTILITY (D600)
25 Sept 19 - 23 Okt 19
332 COOLING TOWER UTILITY (D600)
25 Sept 19 - 23 Okt 19
331 STEAM GENERATION
HRSG A-331-07A/B/C (D600)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
HRSG A-331-07D (D600)
25 Okt 19 - 9 Apr 20
1 Ls 9 2 3-Jan-20
1 Ls 9 2 20-Jan-20
1 Ls 9 2 20-Jan-20
1 Ls 9 2 20-Jan-20
4,392 m'
17,169 m'
54,506 m'
2,016 m'
m' 1 1 3 0 0 30-Sep-20
183 Nos
1,266 Nos 35.9 12
2,696 Nos 25
264 Nos 12
1 Nos
9 Nos
8 Nos
1 Nos
1 Nos
9 Nos
8 Nos
1 Nos
2 Nos
2 Nos
9 Nos
86 Nos
83 Nos
13 Nos
4 Day 2
1 Ls 9 2
1 Nov-19 Dec-19
Finish Harga Satuan Harga Total Bobot W1 W2 W3 W4 W1 W2
0
28-Jul-20 Rp 170,000 Rp 370,260,000 0.015
0
10-Sep-20 Rp 170,000 Rp 291,720,000
0
0.012
Rp 60,000,000 Rp 0
60,000,000 0.002
Rp 65,000,000 Rp 585,000,000 0.024
Rp 65,000,000 Rp 520,000,000 0.021
Rp 75,000,000 Rp 75,000,000 0.003
0
Rp 30,000,000 Rp 60,000,000
0 0.002
Rp 35,000,000 Rp 70,000,000 0.003
0
0
Dec-19 Jan-20 Feb-20 Mar-20
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
0.015 0.015
0.002 0.002
0.002 0.002
0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.015 0.015
0.013 0.013
0.015 0.015
0.000 0.000 0.015 0.015 0.011 0.033 0.028 0.028 0.028 0.028 0.036 0.039 0.038 0.024
0.000 0.000 0.015 0.031 0.042 0.075 0.104 0.132 0.159 0.187 0.223 0.262 0.300 0.324
10 20
Apr-20 May-20 Jun-20 Jul-20
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.003
0.015 0.015 0.015
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.004 0.004
0.010
0.008 0.008
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.008
0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000
0.002
0.024 0.024 0.024 0.020 0.020 0.020 0.020 0.020 0.021 0.020 0.020 0.020 0.027 0.020 0.028 0.031
0.348 0.371 0.395 0.415 0.435 0.454 0.474 0.494 0.515 0.534 0.554 0.574 0.601 0.621 0.649 0.680
30
Aug-20 Sep-20 Oct-20 Nov-20
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.015 0.015
0.018 0.018 0.018 0.017 0.017 0.022 0.018 0.018 0.013 0.013 0.004 0.004 0.004 0.004 0.020 0.015
0.698 0.715 0.733 0.750 0.767 0.789 0.807 0.825 0.838 0.851 0.855 0.860 0.864 0.868 0.887 0.903
40 50
60
0 Row 75
0 10 20 30 40 50 60
PC SPUN PILE
Diameter 400 mm
Diameter 500 mm
Diameter 600 mm
Diameter 800 mm
#REF!
#REF!
156
PC SPUN PILE
Length 12 m for bottom, 6/9/12 m for upper, using Diesel Hammer
Length 12 m for bottom, 6/9/12 m for upper, using Diesel Hammer
Length 12 m for bottom, 6/9/12 m for upper, using Diesel Hammer & Hydraulic Hammer
Length 12 m for bottom, 6/9/12 m for upper, using Hydraulic Hammer
4.392 M'
17.169 M'
54.506 M'
2.016 M'
232 1,034
1998 698
Ams Rekin
4,392.00 Rp 168,750
2,016.00 Rp 187,500
Rp 5,238,138,000 Rp 5,994,416,250
Rp 5,894,838,000.00 Rp 6,555,101,250.00
Rp 660,263,250.00
Rek
Rp 442,500
Rp 457,500 $ 106,140,000.00
Rp 472,500 $ 454,545,000.00 $ 853,335,000.00
Rp 587,500
$ 560,685,000.00
NO SPUN PILE DIA VOLUME
1 DIA. 500 mm 17.169
2 Dia. 600 mm 54.506
3 Dia. 800 mm 2.016
Total titik
HRSG D600 Diesel 354
HRSG D600 Hydr 118
HRSG D500 Diesel 174
HRSG D500 Hydr 58
UCT Diesel 156
UCT Hydr 334
TOTAL
1.806 titik
1.502 titik
3.21 titik