Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20

Dur Dur
Nos Vol Sat HYD001 DH002 DH003 DH004 Total Equip. Prod /Day (Days) (Week) Start Finish Harga Satuan Harga Total Bobot W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

PREPARATION WORK
Mobilization 1 Ls 9 2 3-Jan-20 12-Jan-20 Rp 750,000,000 Rp 750,000,000 0.041
Piling Rig NISHA DHP 80 (3 Unit)
Piling Rig NISHA DHP 508 (1 Unit)
Service Crane 1 KOBELCO 7045
Service Crane 2 KOBELCO 7055
Service Crane 3 SANY SCC500E
Service Crane 4 KOBELCO 7050
Diesel Hammer DD 6.5 T (3 Unit)
Diesel Hammer DD 8.5 T (1 Unit)
Mesin las
Genset
Temporary Facility (office, acomodation, etc) 1 Ls 9 2 20-Jan-20 29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.006
Utility Facility 1 Ls 9 2 20-Jan-20 29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.006
Site management, Equipment, Tools 1 Ls 9 2 20-Jan-20 29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.006

PERMANENT WORK
Handling Pile 78083 m' 287 41 24-Jan-20 6-Nov-20 Rp 52,000 Rp 4,060,316,000 0.220
Length @12m, handling pile from trailer to laydown area and from laydown area to pilling work area (inside area)
Diameter 400 mm 4,392 m'
Diameter 500 mm 17,169 m'
Diameter 600 mm 54,506 m'
Diameter 800 mm 2,016 m'
PILING WORK
332 COOLING TOWER UTILITY (D600) 1 RIG
25 Sept 19 - 23 Okt 19 58 2088 m' 1 1 6 17 3 9-Mar-20 26-Mar-20 Rp 145,000 Rp 302,760,000 0.016
332 COOLING TOWER UTILITY (D600) 146 5256 m' 1 1 4 41 6 9-Mar-20 19-Apr-20 Rp 170,000 Rp 893,520,000 0.048 1 RIG
25 Sept 19 - 23 Okt 19
331 STEAM GENERATION
HRSG A-331-07A/B/C/D (D600) 158 5016.5 m' 1 1 6 31 5 9-Mar-20 9-Apr-20 Rp 145,000 Rp 727,392,500 0.039 2 RIG
25 Okt 19 - 9 Apr 20

331 STEAM GENERATION 2 RIG


HRSG A-331-07A/B/C/D (D500) 174 5524.5 m' 1 1 8 24 4 9-Mar-20 2-Apr-20 Rp 137,000 Rp 756,856,500 0.041
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION 2 RIG
GTG A-331-07A/B/C/D (D600) 104 3432 m' 1 1 2 6 10 2 4-Apr-20 14-Apr-20 Rp 145,000 Rp 497,640,000 0.027
25 Okt 19 - 9 Apr 20

331 STEAM GENERATION 1 RIG


PR-331-05A/B/C/D (D500)
204 6222 m' 1 1 7 31 5 28-Mar-20 28-Apr-20 Rp 137,000 Rp 852,414,000 0.046
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
Boiler A-331-01A/B/C/D/E (D600) 515 12154 m' 1 1 1 3 6 33 5 16-Apr-20 19-May-20 Rp 145,000 Rp 1,762,330,000 0.096 2 RIG
25 Okt 19 - 9 Apr 20

331 STEAM GENERATION (HOLD)


Piperack PR-331-06 m' 1 1 2 0 0 8-Mar-21 8-Mar-21 Rp 145,000 Rp - 0.000
DWG not available yet
320 Sperical Tank
D320-05A/B/C/D Propylene Tank (D600) 288 6048 m' 1 1 6 69 10 1-May-20 9-Jul-20 Rp 145,000 Rp 876,960,000 0.048 1 RIG
23 Mei 19 - 6 Mar 20
320 Sperical Tank
D320-03 Gasoline Blending (D600) 66 1320 m' 1 1 6 13 2 9-Jul-20 22-Jul-20 Rp 145,000 Rp 191,400,000 0.010 1 RIG
23 Mei 19 - 6 Mar 20

320 Sperical Tank 1 RIG


D320-04 Unsaturated C4 Tank (D800) 57 1311 m' 1 1 2 30 5 19-Apr-20 19-May-20 Rp 190,000 Rp 249,090,000 0.013
23 Mei 19 - 6 Mar 20
320 Sperical Tank
D320-06A/B LPG Tank (D800) 564 m' 1 1 2 293 42 19-May-20 8-Mar-21 Rp 190,000 Rp - 0.000
H/O 31 Des 2020
332 COOLING TOWER PROCESS (D600) 2 RIG 3 RIG
29 Okt 19 - 23 Mar 20 648 12312 m' 1 1 2 6 71 11 22-May-20 1-Aug-20 Rp 145,000 Rp 1,785,240,000 0.097

319 FLARE ONSHORE (D600)


22 Jan 20 - 19 Mei 20 69 m' 1 1 2 6 7 1 19-May-20 26-May-20 Rp 145,000 Rp - 0.000
H/O 20 Sept 2020
JOINT WELDING
Diameter 400 mm (include 10% NDT and free tar epoxy coat for welded joint) 183 Nos Rp 240,000 Rp 43,920,000 0.002
Diameter 500 mm (include 10% NDT and free tar epoxy coat for welded joint) 1,266 Nos Rp 275,000 Rp 348,150,000 0.019
Diameter 600 mm (include 10% NDT and free tar epoxy coat for welded joint) 2,696 Nos Rp 275,000 Rp 741,400,000 0.040
Diameter 800 mm (include 10% NDT and free tar epoxy coat for welded joint) 264 Nos Rp 500,000 Rp 132,000,000 0.007
PILE LOADING TEST
Static Loading Test (used pile, reaction pile)
- Compression (ASTM D1143)
Diameter 400 mm (ASTM D1143) 1 Nos Rp 60,000,000 Rp 60,000,000 0.003
Diameter 500 mm (ASTM D1143) 9 Nos Rp 65,000,000 Rp 585,000,000 0.032
Diameter 600 mm (ASTM D1143) 8 Nos Rp 65,000,000 Rp 520,000,000 0.028
Diameter 800 mm (ASTM D1143) 1 Nos Rp 75,000,000 Rp 75,000,000 0.004
- Lateral (ASTM D3966)
Diameter 400 mm (ASTM D3966) 1 Nos Rp 22,500,000 Rp 22,500,000 0.001
Diameter 500 mm (ASTM D3966) 9 Nos Rp 22,500,000 Rp 202,500,000 0.011
Diameter 600 mm (ASTM D3966) 8 Nos Rp 22,500,000 Rp 180,000,000 0.010
Diameter 800 mm (ASTM D3966) 1 Nos Rp 22,500,000 Rp 22,500,000 0.001
- Tension (ASTM D3689)
Diameter 400 mm (ASTM D3689)
Diameter 500 mm (ASTM D3689) 2 Nos Rp 30,000,000 Rp 60,000,000 0.003
Diameter 600 mm (ASTM D3689) 2 Nos Rp 35,000,000 Rp 70,000,000 0.004
Diameter 800 mm (ASTM D3689)
- PDA test
Diameter 400 mm 9 Nos 1 2 6 1 Rp 2,700,000 Rp 24,300,000 0.001
Diameter 500 mm 86 Nos 1 2 50 8 Rp 2,700,000 Rp 232,200,000 0.013
Diameter 600 mm 83 Nos 1 2 48 7 Rp 2,700,000 Rp 224,100,000 0.012
Diameter 800 mm 13 Nos 1 2 8 2 Rp 2,700,000 Rp 35,100,000 0.002
VIBRATION MONITORING 4 Day Rp 19,500,000 Rp 78,000,000 0.004
General spec for vibration monitoring
VMT by third party
minimum 3 location (3 points each)/ VMT test/day
VMT includeing report and excecutive summay for vibration analysis
Demobilization 1 Ls 9 2 Rp 750,000,000 Rp 750,000,000 0.041
1
1.1

1.2
1.3
1.4

2
2.1

2.1.1
2.1.2
2.1.3
2.1.4
2.2
2.3

2.4

2.4.1

2.4.2

2.4.3
2.4.4

2.5

3
PREPARATION WORK
Mobilization
Piling Rig NISHA DHP 80 (3 Unit)
Piling Rig NISHA DHP 508 (1 Unit)
Service Crane 1 KOBELCO 7045
Service Crane 2 KOBELCO 7055
Service Crane 3 SANY SCC500E
Service Crane 4 KOBELCO 7050
Diesel Hammer DD 6.5 T (3 Unit)
Diesel Hammer DD 8.5 T (1 Unit)
Mesin las
Genset
Temporary Facility (office, acomodation, etc)
Utility Facility
Site management, Equipment, Tools

PERMANENT WORK
Handling Pile
Length @12m, handling pile from trailer to laydown area and from laydown area to pilling work area (inside area)
Diameter 400 mm
Diameter 500 mm
Diameter 600 mm
Diameter 800 mm
PILING WORK
332 COOLING TOWER UTILITY (D600)
25 Sept 19 - 23 Okt 19
332 COOLING TOWER UTILITY (D600)
25 Sept 19 - 23 Okt 19
331 STEAM GENERATION
HRSG A-331-07A/B/C (D600)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
HRSG A-331-07D (D600)
25 Okt 19 - 9 Apr 20

331 STEAM GENERATION


HRSG A-331-07A/B/C (D500)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
HRSG A-331-07D (D500)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
GTG A-331-07A/B/C (D600)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
GTG A-331-07D (D600)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
PR-331-05A/B/C (D500)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
PR-331-05D (D500)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
Boiler A-331-01A/B/C/D/E (D600)
25 Okt 19 - 9 Apr 20

331 STEAM GENERATION (HOLD)


Piperack PR-331-06
DWG not available yet
320 Sperical Tank
D320-05A/B/C/D Propylene Tank (D600)
23 Mei 19 - 6 Mar 20
320 Sperical Tank
D320-03 Gasoline Blending (D600)
23 Mei 19 - 6 Mar 20

320 Sperical Tank


D320-04 Unsaturated C4 Tank (D800)
23 Mei 19 - 6 Mar 20
320 Sperical Tank
D320-06A/B LPG Tank (D800)
H/O 31 Des 2020
332 COOLING TOWER PROCESS (D600)
29 Okt 19 - 23 Mar 20

319 FLARE ONSHORE (D600)


22 Jan 20 - 19 Mei 20
H/O 20 Sept 2020
JOINT WELDING
Diameter 400 mm (include 10% NDT and free tar epoxy coat for welded joint)
Diameter 500 mm (include 10% NDT and free tar epoxy coat for welded joint)
Diameter 600 mm (include 10% NDT and free tar epoxy coat for welded joint)
Diameter 800 mm (include 10% NDT and free tar epoxy coat for welded joint)
PILE LOADING TEST
Static Loading Test (used pile, reaction pile)
- Compression (ASTM D1143)
Diameter 400 mm (ASTM D1143)
Diameter 500 mm (ASTM D1143)
Diameter 600 mm (ASTM D1143)
Diameter 800 mm (ASTM D1143)
- Lateral (ASTM D3966)
Diameter 400 mm (ASTM D3966)
Diameter 500 mm (ASTM D3966)
Diameter 600 mm (ASTM D3966)
Diameter 800 mm (ASTM D3966)
- Tension (ASTM D3689)
Diameter 400 mm (ASTM D3689)
Diameter 500 mm (ASTM D3689)
Diameter 600 mm (ASTM D3689)
Diameter 800 mm (ASTM D3689)
- PDA test
Diameter 400 mm
Diameter 500 mm
Diameter 600 mm
Diameter 800 mm
VIBRATION MONITORING
General spec for vibration monitoring
VMT by third party
minimum 3 location (3 points each)/ VMT test/day
VMT includeing report and excecutive summay for vibration analysis
Demobilization
Nos Vol Sat HYD001 DH002 DH003 DH004 Total Equip. Prod /Day Dur Dur
(Days) (Week)

1 Ls 9 2

1 Ls 9 2
1 Ls 9 2
1 Ls 9 2

78083 m' 287 41

4,392 m'
17,169 m'
54,506 m'
2,016 m'

156 5616 m' 1 1 6 30 5

334 12024 m' 1 1 3 142 21

198 6204 m' 1 1 2 6 21 3

66 2178 m' 1 1 3 26 4

174 5452 m' 1 1 2 6 17 3

58 1914 m' 1 1 3 23 4

156 5148 m' 1 1 1 3 6 10 2


52 1716 m' 1 1 3 20 3

153 4539 m' 1 1 1 3 6 10 2

51 1683 m' 1 1 3 20 3

515 12154 m' 1 1 1 3 6 33 5

m' 1 1 3 0 0

288 6048 m' 1 1 6 69 10

66 1320 m' 1 1 6 13 2

57 1311 m' 1 1 2 6 6 1

564 12972 m' 1 1 1 3 6 36 6

648 12312 m' 1 1 2 6 76 11

69 m' 1 1 1 3 6 5 1

183 Nos
1,266 Nos
2,696 Nos
264 Nos

1 Nos
9 Nos
8 Nos
1 Nos

1 Nos
9 Nos
8 Nos
1 Nos
2 Nos
2 Nos

9 Nos
86 Nos
83 Nos
13 Nos
4 Day

1 Ls 9 2
Nov-19
Start Finish Harga Satuan Harga Total Bobot W1 W2 W3

3-Jan-20 12-Jan-20 Rp 750,000,000 Rp 750,000,000 0.031

20-Jan-20 29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.005


20-Jan-20 29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.005
20-Jan-20 29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.005

24-Jan-20 6-Nov-20 Rp 52,000 Rp 4,060,316,000 0.169

30-Jan-20 29-Feb-20 Rp 145,000 Rp 814,320,000 0.034

10-Feb-20 1-Jul-20 Rp 170,000 Rp 2,044,080,000 0.085

24-Jan-20 14-Feb-20 Rp 145,000 Rp 899,580,000 0.037

2-Jul-20 28-Jul-20 Rp 170,000 Rp 370,260,000 0.015

14-Feb-20 2-Mar-20 Rp 137,000 Rp 746,924,000 0.031

29-Jul-20 21-Aug-20 Rp 170,000 Rp 325,380,000 0.014

2-Mar-20 12-Mar-20 Rp 145,000 Rp 746,460,000 0.031


21-Aug-20 10-Sep-20 Rp 170,000 Rp 291,720,000 0.012

12-Mar-20 22-Mar-20 Rp 137,000 Rp 621,843,000 0.026

10-Sep-20 30-Sep-20 Rp 170,000 Rp 286,110,000 0.012

22-Mar-20 24-Apr-20 Rp 145,000 Rp 1,762,330,000 0.073

30-Sep-20 30-Sep-20 Rp 145,000 Rp - 0.000

27-Apr-20 5-Jul-20 Rp 145,000 Rp 876,960,000 0.036

5-Jul-20 18-Jul-20 Rp 145,000 Rp 191,400,000 0.008

15-Jul-20 21-Jul-20 Rp 190,000 Rp 249,090,000 0.010

18-Jul-20 23-Aug-20 Rp 190,000 Rp 2,464,680,000 0.103

27-Apr-20 12-Jul-20 Rp 145,000 Rp 1,785,240,000 0.074

26-Aug-20 31-Aug-20 Rp 145,000 Rp - 0.000

Rp 240,000 Rp 43,920,000 0.002


Rp 275,000 Rp 348,150,000 0.014
Rp 275,000 Rp 741,400,000 0.031
Rp 500,000 Rp 132,000,000 0.005

Rp 60,000,000 Rp 60,000,000 0.002


Rp 65,000,000 Rp 585,000,000 0.024
Rp 65,000,000 Rp 520,000,000 0.022
Rp 75,000,000 Rp 75,000,000 0.003

Rp 22,500,000 Rp 22,500,000 0.001


Rp 22,500,000 Rp 202,500,000 0.008
Rp 22,500,000 Rp 180,000,000 0.007
Rp 22,500,000 Rp 22,500,000 0.001
Rp 30,000,000 Rp 60,000,000 0.002
Rp 35,000,000 Rp 70,000,000 0.003

Rp 2,700,000 Rp 24,300,000 0.001


Rp 2,700,000 Rp 232,200,000 0.010
Rp 2,700,000 Rp 224,100,000 0.009
Rp 2,700,000 Rp 35,100,000 0.001
Rp 19,500,000 Rp 78,000,000 0.003

Rp 750,000,000 Rp 750,000,000 0.031


0.000 0.000 0.000
0.000 0.000 0.000
Jumlah Rp 24,033,363,000 1.000
Nov-19 Dec-19 Jan-20 Feb-20 Mar-20
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1

1 RIG

2 RIG

2 RIG

3 RIG
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Mar-20 Apr-20 May-20 Jun-20
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3

1 RIG

3 RIG
3 RIG

3 RIG

1 RIG

2 RIG
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1

1 RIG

1 RIG
1 RIG

1 RIG

1 RIG

1 RIG

2 RIG

3 RIG

3 RIG
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Oct-20 Nov-20
W2 W3 W4 W1 W2 W3 W4
0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000
1
1.1

1.2
1.3
1.4

2
2.1

2.1.1
2.1.2
2.1.3
2.1.4
2.2
2.3

2.4

2.4.1

2.4.2

2.4.3
2.4.4

2.5

3
PREPARATION WORK
Mobilization
Piling Rig NISHA DHP 80 (3 Unit)
Piling Rig NISHA DHP 508 (1 Unit)
Service Crane 1 KOBELCO 7045
Service Crane 2 KOBELCO 7055
Service Crane 3 SANY SCC500E
Service Crane 4 KOBELCO 7050
Diesel Hammer DD 6.5 T (3 Unit)
Diesel Hammer DD 8.5 T (1 Unit)
Mesin las
Genset
Temporary Facility (office, acomodation, etc)
Utility Facility
Site management, Equipment, Tools

PERMANENT WORK
Handling Pile

Length @12m, handling pile from trailer to laydown area and from laydown area to pilling work area (inside area)
Diameter 400 mm
Diameter 500 mm
Diameter 600 mm
Diameter 800 mm
PILING WORK
332 COOLING TOWER UTILITY (D600)
25 Sept 19 - 23 Okt 19
332 COOLING TOWER UTILITY (D600)
25 Sept 19 - 23 Okt 19
331 STEAM GENERATION
HRSG A-331-07A/B/C (D600)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
HRSG A-331-07D (D600)
25 Okt 19 - 9 Apr 20

331 STEAM GENERATION


HRSG A-331-07A/B/C (D500)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
HRSG A-331-07D (D500)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
GTG A-331-07A/B/C (D600)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
GTG A-331-07D (D600)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
PR-331-05A/B/C (D500)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
PR-331-05D (D500)
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
Boiler A-331-01A/B/C/D/E (D600)
25 Okt 19 - 9 Apr 20

331 STEAM GENERATION (HOLD)


Piperack PR-331-06
DWG not available yet
320 Sperical Tank
D320-05A/B/C/D Propylene Tank (D600)
23 Mei 19 - 6 Mar 20
320 Sperical Tank
D320-03 Gasoline Blending (D600)
23 Mei 19 - 6 Mar 20

320 Sperical Tank


D320-04 Unsaturated C4 Tank (D800)
23 Mei 19 - 6 Mar 20
320 Sperical Tank
D320-06A/B LPG Tank (D800)
H/O 31 Des 2020
332 COOLING TOWER PROCESS (D600)
29 Okt 19 - 23 Mar 20

319 FLARE ONSHORE (D600)


22 Jan 20 - 19 Mei 20
H/O 20 Sept 2020
JOINT WELDING
Diameter 400 mm (include 10% NDT and free tar epoxy coat for welded joint)
Diameter 500 mm (include 10% NDT and free tar epoxy coat for welded joint)
Diameter 600 mm (include 10% NDT and free tar epoxy coat for welded joint)
Diameter 800 mm (include 10% NDT and free tar epoxy coat for welded joint)
PILE LOADING TEST
Static Loading Test (used pile, reaction pile)
- Compression (ASTM D1143)
Diameter 400 mm (ASTM D1143)
Diameter 500 mm (ASTM D1143)
Diameter 600 mm (ASTM D1143)
Diameter 800 mm (ASTM D1143)
- Lateral (ASTM D3966)
Diameter 400 mm (ASTM D3966)
Diameter 500 mm (ASTM D3966)
Diameter 600 mm (ASTM D3966)
Diameter 800 mm (ASTM D3966)
- Tension (ASTM D3689)
Diameter 400 mm (ASTM D3689)
Diameter 500 mm (ASTM D3689)
Diameter 600 mm (ASTM D3689)
Diameter 800 mm (ASTM D3689)
- PDA test
Diameter 400 mm
Diameter 500 mm
Diameter 600 mm
Diameter 800 mm
VIBRATION MONITORING
General spec for vibration monitoring
VMT by third party
minimum 3 location (3 points each)/ VMT test/day
VMT includeing report and excecutive summay for vibration analysis
Demobilization
Nos Vol Sat HYD001 DH002 DH003 DH004 Total Equip. Prod /Day Dur Dur Start
(Days) (Week)

1 Ls 9 2 3-Jan-20

1 Ls 9 2 20-Jan-20
1 Ls 9 2 20-Jan-20
1 Ls 9 2 20-Jan-20

78083 m' 287 41 24-Jan-20

4,392 m'
17,169 m'
54,506 m'
2,016 m'

156 5616 m' 1 1 6 30 5 30-Jan-20

334 12024 m' 1 1 3 142 21 10-Feb-20

198 6204 m' 1 1 2 6 21 3 24-Jan-20

66 2178 m' 1 1 3 26 4 2-Jul-20

174 5452 m' 1 1 2 6 17 3 14-Feb-20

58 1914 m' 1 1 3 23 4 29-Jul-20

156 5148 m' 1 1 1 3 6 10 2 2-Mar-20


52 1716 m' 1 1 3 20 3 21-Aug-20

153 4539 m' 1 1 1 3 6 10 2 12-Mar-20

51 1683 m' 1 1 3 20 3 10-Sep-20

515 12154 m' 1 1 1 3 6 33 5 22-Mar-20

m' 1 1 3 0 0 30-Sep-20

288 6048 m' 1 1 6 69 10 27-Apr-20

66 1320 m' 1 1 6 13 2 5-Jul-20

57 1311 m' 1 1 2 6 6 1 15-Jul-20

564 12972 m' 1 1 2 4 81 12 18-Jul-20

648 12312 m' 1 1 2 6 76 11 27-Apr-20

69 1380 m' 1 1 2 6 7 1 21-Jul-20

183 Nos
1,266 Nos 35.9 12
2,696 Nos 25
264 Nos 12

1 Nos
9 Nos
8 Nos
1 Nos

1 Nos
9 Nos
8 Nos
1 Nos
2 Nos
2 Nos

9 Nos
86 Nos
83 Nos
13 Nos
4 Day 2

1 Ls 9 2
1 Nov-19 Dec-19
Finish Harga Satuan Harga Total Bobot W1 W2 W3 W4 W1 W2

12-Jan-20 Rp 750,000,000 Rp 750,000,000 0.031

29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.005


29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.005
29-Jan-20 Rp 113,333,333 Rp 113,333,333 0.005

6-Nov-20 Rp 52,000 Rp 4,060,316,000 0.168

29-Feb-20 Rp 145,000 Rp 814,320,000 0.034

1-Jul-20 Rp 170,000 Rp 2,044,080,000 0.084

14-Feb-20 Rp 145,000 Rp 899,580,000 0.037

0
28-Jul-20 Rp 170,000 Rp 370,260,000 0.015

2-Mar-20 Rp 137,000 Rp 746,924,000 0.031

21-Aug-20 Rp 170,000 Rp 325,380,000 0.013

12-Mar-20 Rp 145,000 Rp 746,460,000 0.031

0
10-Sep-20 Rp 170,000 Rp 291,720,000
0
0.012

22-Mar-20 Rp 137,000 Rp 621,843,000 0.026

30-Sep-20 Rp 170,000 Rp 286,110,000 0.012

24-Apr-20 Rp 145,000 Rp 1,762,330,000 0.073

30-Sep-20 Rp 145,000 Rp - 0.000


0

5-Jul-20 Rp 145,000 Rp 876,960,000 0.036

18-Jul-20 Rp 145,000 Rp 191,400,000 0.008

21-Jul-20 Rp 190,000 Rp 249,090,000 0.010

7-Oct-20 Rp 190,000 Rp 2,464,680,000 0.102

12-Jul-20 Rp 145,000 Rp 1,785,240,000


0 0.074

28-Jul-20 Rp 145,000 Rp 200,100,000 0.008

Rp 240,000 Rp 43,920,000 0.002


Rp 275,000 Rp 348,150,000 0.014
Rp 275,000 Rp 741,400,000 0.031
Rp 500,000 Rp 132,000,000 0.005

Rp 60,000,000 Rp 0
60,000,000 0.002
Rp 65,000,000 Rp 585,000,000 0.024
Rp 65,000,000 Rp 520,000,000 0.021
Rp 75,000,000 Rp 75,000,000 0.003

Rp 22,500,000 Rp 22,500,000 0.001


Rp 22,500,000 Rp 202,500,000 0.008
Rp 22,500,000 Rp 180,000,000 0.007
Rp 22,500,000 Rp 22,500,000 0.001

0
Rp 30,000,000 Rp 60,000,000
0 0.002
Rp 35,000,000 Rp 70,000,000 0.003

Rp 2,700,000 Rp 24,300,000 0.001


Rp 2,700,000 Rp 232,200,000 0.010
Rp 2,700,000 Rp 224,100,000 0.009
Rp 2,700,000 Rp 35,100,000 0.001
Rp 19,500,000 Rp 78,000,000 0.003

Rp 750,000,000 Rp 750,000,000 0.031


0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000
Jumlah Rp 24,233,463,000 1.000
Rp 24,033,363,000

0
0
Dec-19 Jan-20 Feb-20 Mar-20
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

0.015 0.015

0.002 0.002
0.002 0.002
0.002 0.002

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.007 0.007 0.007 0.007 0.007

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.012 0.012 0.012

0.010 0.010 0.010

0.015 0.015
0.013 0.013

0.015 0.015

0.001 0.001 0.001 0.001 0.001


0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002

0.000 0.000 0.015 0.015 0.011 0.033 0.028 0.028 0.028 0.028 0.036 0.039 0.038 0.024
0.000 0.000 0.015 0.031 0.042 0.075 0.104 0.132 0.159 0.187 0.223 0.262 0.300 0.324

10 20
Apr-20 May-20 Jun-20 Jul-20
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.004 0.004 0.004 0.004

0.003
0.015 0.015 0.015

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.004 0.004

0.010

0.008 0.008

0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.008

0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000
0.002

0.024 0.024 0.024 0.020 0.020 0.020 0.020 0.020 0.021 0.020 0.020 0.020 0.027 0.020 0.028 0.031
0.348 0.371 0.395 0.415 0.435 0.454 0.474 0.494 0.515 0.534 0.554 0.574 0.601 0.621 0.649 0.680

30
Aug-20 Sep-20 Oct-20 Nov-20
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.003 0.003 0.003


0.004 0.004 0.004

0.004 0.004 0.004

0.000

0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008

0.001 0.001 0.001 0.001 0.001 0.001

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.015 0.015
0.018 0.018 0.018 0.017 0.017 0.022 0.018 0.018 0.013 0.013 0.004 0.004 0.004 0.004 0.020 0.015
0.698 0.715 0.733 0.750 0.767 0.789 0.807 0.825 0.838 0.851 0.855 0.860 0.864 0.868 0.887 0.903

40 50
60

Rp 504,081,513.75 Rp 504,081,513.75 Rp 361,637,618.63


Rp 1,075,927,844.70 Rp 925,828,692.55 Rp 925,828,692.55
Rp 2,445,728,490.84
1 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20
Bobot W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

PREPARATION WORK Chart Title


Mobilization 0.035 0.018 0.018
Piling Rig NISHA DHP 80 (3 Unit)
Piling Rig NISHA DHP 508 (1 Unit)
Service Crane 1 KOBELCO 7045
Service Crane 2 KOBELCO 7055
Service Crane 3 SANY SCC500E
Service Crane 4 KOBELCO 7050
Diesel Hammer DD 6.5 T (3 Unit)
Diesel Hammer DD 8.5 T (1 Unit)
Mesin las
Genset
Temporary Facility (office, acomodation, etc) 0.005 0.003 0.003
Utility Facility 0.005 0.003 0.003
Site management, Equipment, Tools 0.005 0.003 0.003
1
PERMANENT WORK
Handling Pile 0.191 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
Length @12m, handling pile from trailer to laydown area and from laydown area to pilling work area (inside area)
Diameter 400 mm
Diameter 500 mm
Diameter 600 mm
Diameter 800 mm
PILING WORK
332 COOLING TOWER UTILITY (D600)
25 Sept 19 - 23 Okt 19 0.072 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
332 COOLING TOWER UTILITY (D600) 0.057 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
25 Sept 19 - 23 Okt 19
331 STEAM GENERATION
HRSG A-331-07A/B/C/D (D600) 0.057 0.014 0.014 0.014 0.014
25 Okt 19 - 9 Apr 20

331 STEAM GENERATION


HRSG A-331-07A/B/C/D (D500) 0.048 0.012 0.012 0.012 0.012
25 Okt 19 - 9 Apr 20
0
331 STEAM GENERATION
GTG A-331-07A/B/C/D (D600) 0.047 0.016 0.016 0.016
25 Okt 19 - 9 Apr 20

331 STEAM GENERATION


PR-331-05A/B/C/D (D500)
0.040 0.007 0.007 0.007 0.007 0.007 0.007
25 Okt 19 - 9 Apr 20
331 STEAM GENERATION
Boiler A-331-01A/B/C/D/E (D600) 0.083 0.012 0.012 0.012 0.012 0.012 0.012 0.012
25 Okt 19 - 9 Apr 20

331 STEAM GENERATION (HOLD)


Piperack PR-331-06 0.000
DWG not available yet
320 Sperical Tank
D320-05A/B/C/D Propylene Tank (D600) 0.041 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
23 Mei 19 - 6 Mar 20
320 Sperical Tank
D320-03 Gasoline Blending (D600) 0.009 0.005 0.005
23 Mei 19 - 6 Mar 20

320 Sperical Tank


D320-04 Unsaturated C4 Tank (D800) 0.012 0.002 0.002 0.002 0.002 0.002
23 Mei 19 - 6 Mar 20
0
320 Sperical Tank
D320-06A/B LPG Tank (D800) 0.000
H/O 31 Des 2020
332 COOLING TOWER PROCESS (D600)
29 Okt 19 - 23 Mar 20 0.084 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009

319 FLARE ONSHORE (D600)


22 Jan 20 - 19 Mei 20 0.000
H/O 20 Sept 2020
JOINT WELDING
Diameter 400 mm (include 10% NDT and free tar epoxy coat for welded joint) 0.002 0.002
Diameter 500 mm (include 10% NDT and free tar epoxy coat for welded joint) 0.016 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
Diameter 600 mm (include 10% NDT and free tar epoxy coat for welded joint) 0.035 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
Diameter 800 mm (include 10% NDT and free tar epoxy coat for welded joint) 0.006 0.001 0.001 0.001 0.001 0.001
PILE LOADING TEST
Static Loading Test (used pile, reaction pile)
- Compression (ASTM D1143)
Diameter 400 mm (ASTM D1143) 0.003 0.003
Diameter 500 mm (ASTM D1143) 0.028 0.014 0.014
Diameter 600 mm (ASTM D1143) 0.024 0.012 0.012
0
Diameter 800 mm (ASTM D1143) 0.004 0.004
- Lateral (ASTM D3966)
Diameter 400 mm (ASTM D3966) 0.001 0.001
Diameter 500 mm (ASTM D3966) 0.010 0.005 0.005
Diameter 600 mm (ASTM D3966) 0.008 0.004 0.004
Diameter 800 mm (ASTM D3966) 0.001 0.001
- Tension (ASTM D3689)
Diameter 400 mm (ASTM D3689) 0.000
Diameter 500 mm (ASTM D3689) 0.003 0.001 0.001
Diameter 600 mm (ASTM D3689) 0.003 0.002 0.002
Diameter 800 mm (ASTM D3689)
- PDA test
Diameter 400 mm 0.001 0.001 0.001
Diameter 500 mm 0.011 0.002 0.002 0.002 0.002 0.002 0.002
Diameter 600 mm 0.011 0.002 0.002 0.002 0.002 0.002 0.002 0.002
Diameter 800 mm 0.002 0.001 0.001
VIBRATION MONITORING 0.004 0.002 0.002
General spec for vibration monitoring
0
VMT by third party
minimum 3 location (3 points each)/ VMT test/day
VMT includeing report and excecutive summay for vibration analysis
Demobilization 0.035 0.018 0.018

0 Row 75
0 10 20 30 40 50 60
PC SPUN PILE
Diameter 400 mm
Diameter 500 mm
Diameter 600 mm
Diameter 800 mm

#REF!
#REF!
156
PC SPUN PILE
Length 12 m for bottom, 6/9/12 m for upper, using Diesel Hammer
Length 12 m for bottom, 6/9/12 m for upper, using Diesel Hammer
Length 12 m for bottom, 6/9/12 m for upper, using Diesel Hammer & Hydraulic Hammer
Length 12 m for bottom, 6/9/12 m for upper, using Hydraulic Hammer
4.392 M'
17.169 M'
54.506 M'
2.016 M'

232 1,034
1998 698

Ams nos joint


183 Rp 240,000
1,266 Rp 275,000
2,696 Rp 275,000 $ 328,350,000.00 $ 656,700,000.00
264 Rp 500,000

Ams Rekin
4,392.00 Rp 168,750

145,000.00 7134 1,034,430,000.00 Rp 168,750 6554 Rp 1,105,987,500

137,000.00 30684 4,203,708,000.00 Rp 174,375 28034 Rp 4,888,428,750

2,016.00 Rp 187,500
Rp 5,238,138,000 Rp 5,994,416,250

Rp 5,894,838,000.00 Rp 6,555,101,250.00

Rp 660,263,250.00
Rek
Rp 442,500
Rp 457,500 $ 106,140,000.00
Rp 472,500 $ 454,545,000.00 $ 853,335,000.00
Rp 587,500
$ 560,685,000.00
NO SPUN PILE DIA VOLUME
1 DIA. 500 mm 17.169
2 Dia. 600 mm 54.506
3 Dia. 800 mm 2.016

Total titik
HRSG D600 Diesel 354
HRSG D600 Hydr 118
HRSG D500 Diesel 174
HRSG D500 Hydr 58
UCT Diesel 156
UCT Hydr 334
TOTAL
1.806 titik
1.502 titik
3.21 titik

sisa spun yang tdk tertanam harsat amsharsat rekitotal ams


24 23 145000 174375 IDR 1,180,590,000.00
24 23 170000 174375 IDR 461,380,000.00
24 23 137000 168750 IDR 548,274,000.00
24 23 170000 168750 IDR 226,780,000.00
33 30 145000 174375 IDR 678,600,000.00
33 30 170000 174375 IDR 1,703,400,000.00
IDR 4,799,024,000.00
total rekin
IDR 1,419,761,250.00
IDR 473,253,750.00
IDR 675,337,500.00
IDR 225,112,500.00
IDR 816,075,000.00
IDR 1,747,237,500.00
IDR 5,356,777,500.00
IDR 557,753,500.00
10%