Stone Construction Services: 111 Ocean Avenue Camas, WA 98607 (900) 555-1111 WA License #STONECS000W

Stone Construction Services submitted Change Order No. 1 to John and Mary Smith for additional work on their home located at 1234 W. Hill St. in Camas, WA. The change order includes charging over the allowance for a new tub, adding insulation to the attic, installing a new bathroom fan, and adjusting the basement hand railing. The total cost of the additional work is $1,970, increasing the original contract amount from $28,493 to the revised contract amount of $30,463. The contract completion date is extended by 8 days to February 8, 2012 to allow for the additional work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views1 page

Stone Construction Services: 111 Ocean Avenue Camas, WA 98607 (900) 555-1111 WA License #STONECS000W

Stone Construction Services submitted Change Order No. 1 to John and Mary Smith for additional work on their home located at 1234 W. Hill St. in Camas, WA. The change order includes charging over the allowance for a new tub, adding insulation to the attic, installing a new bathroom fan, and adjusting the basement hand railing. The total cost of the additional work is $1,970, increasing the original contract amount from $28,493 to the revised contract amount of $30,463. The contract completion date is extended by 8 days to February 8, 2012 to allow for the additional work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Stone Construction Services Change Order No.

_____1_______
111 Ocean Avenue
Camas, WA 98607 Date: 1/24/12 Owner: Smith
(900) 555-1111
WA License #STONECS000W
Job name / location: Job number: Job phone:
John & Mary Smith 12-104 360-555-4321
1234 W. Hill St. Original contract number: Original contract date:
12-4 1/4/12
Camas, WA 98607

Change (add or delete) the following work to the original contract:

1. Charge above allowance for tub $ 115.00

2. Add 8" fiberglass insulation to existing attic area − 1,450 sf $1,450.00

3. Add new bath heat/lite/fan combination unit − vent to exterior $ 325.00

4. Adjust and tighten hand railing on basement stairway $ 80.00

Note: Additional work as specified will start on signing of Change Order No. 1 and will extend the contract
completion
fromdate 8 days
January 30 from
to February 8, 2012.

Change the original contract amount by: $ 1,970.00


Previous contract amount: $28,493.00
Revised contract amount: $30,463.00

We agree to furnish labor & materials complete in accordance with the above Above additional work to be performed under the same conditions as specified
specifications at the price stated above. in the original contract unless otherwise stipulated.

STONE CONSTRUCTION SERVICES 1/24/12


General Contractor Date Owner Date
Note: This change order becomes part of the original contract.